TRANSMISSION CORPORATION OF

TELANGANA LIMITED

QUALITY ASSURANCE PLAN

&

CHECK FORMATS

FOR 220KV & 132KV TRANSMISSION LINES AND

SUBSTATIONS CONSTRUCTION
INDEX

Sl.No. DESCRIPTION PAGE NO:

1. PREAMBLE 1

2. CLSSIFICATION OF FOUNDATIONS 3

3. STANDARD FIELD QUALITY PLAN 7

4. GENERAL GUIDELINES FOR IMPLEMENTATION 22

5. REGISTERS

(A) CEMENT REGISTER 40

(B) COARSE/FINE AGGREGATE REGISTER 42

(C) REINFORCEMENT STEEL REGISTER 50

(D) CONCRETE CUBE TESTS REGISTER 55


1

PREAMBLE

During the Quality Control Review Meeting on 03.08.2007 the


Chairperson and Managing Director/ TSTransco has instructed to prepare the
quality assurance plan for erection of 132 KV and 220 KV lines & substations
for implementing in TSTransco.

Accordingly, the Quality Assurance Plan is prepared for erection of


132 KV and 220 KV line & substations and approval accorded by technical
committee for implementing in TSTransco.
2
The following issues were deliberated to ensure quality during
execution of works:

1. Check Survey
i) Verification of line deviation angle and bisection for proper location
of towers.
ii) Verification of meeting statutory clearances.
iii) Check spans on either side of the tower location.
iv) Mark distances and angles from angle point at 3 conspicuous
places to identify the angle point location in case of displacement
of angle point peg.
v) At peg marks GPS marking should be done. This ensures correct
position of peg even if it is removed, as the longitudes and latitudes
are recorded.
2. Soil Investigation
i) Identify 75 locations for performing SPT.
ii) SPT to be performed at all angle points, at locations where soil
strata changes, railway and national/state road crossings, power
line crossings and special locations limiting to the 75 locations as
provided in the contract.
iii) Instead of identify 75 locations, it is better to perform soil
investigation for every KM of soil. Investigation is done by way of
ERM method, time is saved and soil investigation can be done
without disturbing standing crops.
3. Pit Marking
i) Mark position of all the four pits on the ground as per pit marking
drawing for standard type of foundation and note levels of the
center of each leg pit w.r.t center peg of the tower.
ii) Assess volume of bench cutting or use of hill side extension
revetment if required and take approval of the Superintending
Engineer /Chief Engineer.
4. Foundation Classification
i) One of the foundation pit to be used as a trial pit and excavated as
per normal soil dry type foundation.
ii) Observe following for classification
- Type of cultivation surrounding tower and whether
encasement of stub required due to surface water.
- Type of strata and depth of each layer.
- Water table/level.
- Maximum water table in the near by village well.

iii) Check and record soil classification and foundation classification


as per relevant clauses of the agreement and excavate pit as per
approved drawing for the type of foundation classification. (Extract
of Technical Specification is enclosed).
3

4.1 CLASSIFICATION OF FOUNDATIONS:


Classification of soil shall be made according to IS : 200 (Part I) 1974 for footing cast in
open pits. The foundation designs for various types of Foundations as given below shall
be adopted in the construction of all 132 kV & 220 kV Transmission Lines and shall be
based on the following instruction. The Foundation Drawings as finalized by the Civil
Engineering Wing for various soil conditions suitable for different Types of Towers
being deployed in the construction shall be followed by all field officers strictly.

Sl.No. Soil at the Location of Tower Classification of


foundation to be
adopted.
1. Where normal dry cohesive or non-cohesive soils are met. Dry
2(a). Where sub-soil water is met at 1.50 meters or more below the ground level Wet
in normal soil
(b) Where surface water could stand for long period with water penetration
not exceeding 1.0 m below ground level (e.g. Paddy fields, Sugarcane
fields)
3(a). Where sub-soil water is encountered between 0.75 meter and 1.50 meters Partially Submerged /
depth below ground level. Partially Black
(b) Where top layer of Black Cotton soil extends up to 50% of the depth with Cotton
normal soil thereafter
Note – 1 Where soil is clayey type, not necessarily black in colour, which shrinks when dry, swells when
wet.
4(a) Where sub-soil water Table is within 0.75 m depth from ground level. Fully Submerged –
(b) Where top layer of Black Cotton soil exceeds 50% and extends up to full Black Cotton
depth or is followed by normal soil.
(c) Where top layer is normal soil up to 50% of the depth but the lower layer
is a Black Cotton soil
Note – 2 In case of items 4(a), (b) & (c) above, the concerned Superintending Engineer (Civil) shall
personally inspect and certify on soil classification and shall not delegate this responsibility to any
sub-ordinate officers.
5(a) Where decomposed or fissured rock, hard gravel, kanker, limestone, Fissured / soft rock
laterite or any other soil of similar nature is met.
(b) Where top layer of normal dry soil extends up to 85% of the depth
followed by fissured rock without presence of water.
6(a) Where Hard rock is encountered at 1.5 m or less below ground level. Hard Rock

(b) Where Hard rock is encountered form 1.5 m to 2.5 m below Ground Level
though Top layer is of normal soil
(c) Where chiseling, drilling and blasting is required for excavation.
Note – 3 While classifying foundation of Wet, Partially Submerged / Partially Black Cotton, Fully
Submerged / Black Cotton foundations mentioned above, the worst conditions may be considered
and not necessarily the conditions prevailing at the time of inspection. For instance, there are areas
where sub-soil water rises when canal water is let-out in the field raising sub-soil water to a
considerable degree. Similarly the effect of monsoon or when the nearby reservoirs are full should
be considered and not the conditions prevailing in open season or summer when work is carried
out normally. In all such cases, the Chief Engineer (Civil) shall personally inspect and certify the
requirement of higher classification on case to case basis.
4
Note – 4 For critical locations of cut-point / Angle Towers, the classification of Tower
Foundations may be at next higher type for ensuring safety of the transmission
line as likely to be subjected to variable forces from time to time on account of
change in season and climatic conditions. This shall be decided by the
concerned Superintending Engineer (Civil) on case to case basis on personal
inspection.
Note – 5 In case of highly collapsible & loose soils and river crossings, special design for
foundations are to be made by Civil Engineering Wing for adoption on case to
case basis.
Note –6 At locations subjected to water logging, particularly in paddy fields, ponds,
marshy areas, etc., the chimney of all stubs to be raised to 600 mm over the
normal chimney being adopted in other cases. This shall be done after complete
erection of towers as a separate item for identified locations.

In addition to the above, depending on the site conditions more varieties of


foundations may be introduced suitable for intermediate conditions under the
above classifications to effect more economy.

5. Form Work

Verify form work dimensions, rigidity, adequacy of tightness to prevent


loss of cement water from concrete, ensure form surfaces in contact with
concrete wetted and sprayed with fine sand/treated with black oil or
waste oil/mould releasing agent every time before use.

6. Stub setting and Stub setting template

i) Recheck the depth of the pits w.r.t center peg level and pit
dimensions as per approved foundation classification.
ii) Check under cutting as per approved drawing.
iii) Position fully assembled and bolt tightened stub setting template
with supporting jacks placed on firm ground and level the
template.
iv) Check placing a green concrete block of thickness equal to the
clearance between the stub end and concrete to mitigate settling of
template.
v) Check height of template above the center peg level.

7. Reinforcement

i) Check reinforcement dimensions as per bar bending schedule. Tie


reinforcement at alternative crossing points with suitable binding
wire.
ii) Verify using chair and gitties to ensure proper spacing in two
layers reinforcement and minimum cover of 50 mm on the bars
respectively.
iii) Before commencement of concreting ensure sufficient quantity of
chairs and gitties are fabricated and made available at stores for
use at locations.
5
8. Concrete Mixing

i) Ensure using coarse aggregate (metal) and fine aggregate (sand) as


per IS-383.
ii) Check coarse aggregate for flakiness, soft stone and laminar shape.
iii) Check cement for approved brand.
iv) Ensure proper mixing of concrete as per the guide lines.
v) After mixing and before placing the concrete in the foundation pit,
take samples for checking compressive strength and slump test of
concrete.
vi) Engage ready mix where even possible to enable execute fast work.

9. Placing of Concrete

i) Check providing lean concrete (M 10) base 100 mm thick at bottom


of the excavated pit before placing reinforcement.
ii) Use pointing/poking rod and vibrator for compaction of concrete
ensuring vibrator head does not come in contact with steel,
hardened concrete etc.,
10. Stripping of Form Work

Ensure stripping formwork after about 24 hrs and check for any damage,
honey combing and do necessary rectification.
11. Back Filling

i) Ensure back filling on foundation in layers and ensure proper


consolidation.
ii) Ensure all top soils to be placed at the surface in case of towers
located on cultivated land.
iii) Excess earth available over and above ground level (after
consolidation) should be transported away from the site.

12. Curing

Ensure proper curing by keeping adequate quantity of water and storing


arrangement available at site.

13. Earthing of Tower

i) Ensure tower footing resistance not to exceed 10 Ohms.


ii) Use pipe earthing or counter poise earthing as per approved
drawings to ensure minimum tower footing resistance.

14. Formats & QAP is revised with reference to the discussions and the
revised formats & QAP are enclosed herewith. The Superintending
Engineers should get the formats printed and bounded as registers and
to ensure, they are distributed to Section Officer level.

15. All the foundation drawings, and other instructions shall be distributed
upto Section Officer level.
6

16. PENALTIES IMPOSED FOR DEFICIENCEIES IN QUALITY OF WORKS:


During execution of works , if any deficiencies in quality of works
is found in deviation to the specification / Agreement, a minimum penalty of
Rs 5000 to Rs 30,000/- shall be levied for deficiencies as per each category as
mentioned below.

Category I : Not using (i) prescribed shoring, shuttering and dewatering


equipment, (ii) measurement boxes, (iii) Form boxes for different types of
foundations and steel measuring boxes, (iv) not providing adequate number of
chairs to the steel reinforcements, (v) not carrying out back filling and compaction
of the foundation pits in layers and leveling the tower footings properly, (vi) not
ensuring that the excavated earth is dumped at least 2 meters away from the pit
etc., and (vii) not providing copings to the tower legs / stubs,(viii) not providing
water tanker, Earth rammers/Earth vibrators.

Category II : Use of reinforcement steel without ISI marking, not using


vibrators for effective consolidation of the concrete during foundation works, not
using proper templates for firmly keeping the stubs in position when templates
are supplied by the contractor & improper fixing of stubs, non ensuring of tower
verticality, use of rusted stubs and tower parts if supply is by the contractor, non
painting of butt joints and rusted stubs with zinc rich paint immediately after
erection of the towers & stringing, non fixing of earth flat to the stub, non
deployment of technical personnel for supervision of works by the contractor.
Also not fixing of vibration dampers firmly, repair sleeves wherever necessary,
not properly fixing of arcing horns both tower side and line side and bird guards
etc., as per specification.

Category III : Use of improper grade / quality of raw material like H.B.G.
metal, water and sand for concreting, using clogged and / or lump / clotted
cement for concreting, not ensuring proper curing for foundation concrete, not
ensuring that all the members of the tower are placed in position and firmly fixed
with bolts and nuts immediately after erection of tower, not ensuring that Half
round seam welding of the nuts before stringing of the line.

For the deficiencies in the quality of works noticed by the Engineer ,


penalties shall be levied as given below:
Type of First Second Third
category instance(Rs) instance instance
(Rs) (Rs)
Category I 5,000 /- 10,000/- 15,000 /-
Category II 7,500 /- 15,000/- 22,500 /-
Category III 10,000 /- 20,000/- 30,000 /-

In the event of fourth instance of noticing the deficiency of quality of works


in any of the above categories, the bidder shall be debarred from participating in
future tenders for a period of one year.
The bidder shall give a specific undertaking accepting this clause.
7
TRANSMISSION CORPORATION OF TELANGANA LIMITED
QUALITY CONTROL & INSPECTION DEPARTMENT
STANDARD FIELD QUALITY PLAN FOR 220/132 KV LINES & SUB-STATIONS
Section: SURVEY & SOIL INVESTIGATION
Sl. Component Operation & Sampling Plan Reference Documents and Testing Agency Remarks Checking
No. Description of Test with Basis Acceptance Norms Authority
1 DETAILED SURVEY &
ALIGNMENT
(a) Field Survey/Walkover 100% Technical specification Contractor Counter check and AEE/EE/
Survey Geogrphical Map, Route approval by SE
alignment, Route Plan & TSTRANSCO
Measurement Schedules
(b) Plotting of Route 100% Technical specification Field Contractor Counter check and AEE/EE/
book, Geogrphical Map, approval by SE
Route alignment, Route TSTRANSCO
Plan
© Profiling 100% Technical specification Field Contractor Counter check and AEE/EE/
book, Graph sheets, approval by SE
approved route alignment. TSTRANSCO
(d) Tower Spotting 100% Technical specification Contractor Counter check and AEE/EE/
Approved Tower spotting approval by SE
data & Sag Template, Field TSTRANSCO
Book, approved route
alignment
(e) Tower Schedule (Proforma 100% Technical specification Contractor Counter check and SE/CE
to be approved by Approved Route alignment approval by
(TSTRANSCO) & route profile tower TSTRANSCO
schedule, sag template,
tower spotting data
2 Check Survey
(a) Bisection of Angle/Accuracy 100% Technical specification Contractor Counter check and AEE/EE/
of Alignment IS:5613, and other relevant approval by SE
standards. Approved Route TSTRANSCO for
Map & Route Profiles, approval
Tower/line Schedule and
Sag Template etc.

(b) Check for profile levels and 100% DO Contractor Counter check and AEE/EE/
electrical clearances approval by SE
TSTRANSCO for
approval
© Check for span marking and 100% Technical specs IS:5613 Contractor Counter check and EE/SE
lengths and other relevant standards approval by
Apprd. Profile drgs. Tower TSTRANSCO
schedule, tower spotting
data.
(d) Check for tower type& 100% DO Contractor Counter check and EE/SE
position as per site condition approval by
TSTRANSCO
(e) Estimation of benching 100% Technical specification Contractor Counter check and Benching
&Revtment volumes (as per IS:5613 and other relevant approval by by EE/Field
site conditions) standards Apprd. Tower leg CE/400KV/L&SS/ Revetment
location counters, approved TSTRANSCO by SE
profile

(f) Final Profile & tower 100% Modified profile drawing and Contractor Counter check and EE/SE/CE
schedule amended tower schedule approval by
TSTRANSCO
8
Sl. Component Sampling Reference Documents Testing Agency Remarks Checking
No Operation & Plan with and Authority
. Description of Test Basis Acceptance
3 Soil Investigation
A At Normal Locations
(i) Borelog/Trial Pit for obtaining At locations Technical specification Contractor/ Counter check and AEE/EE/ SE
details/types of soil as indicated IS:1498, TSTRANSCO approval by
encountered. Including by 1892, 2720, 4464, 6935, SP- approved TSTRANSCO The
TSTRANSC 36 Agency
gradation of samples at O locations are to be
specified levels, ground water & and other relevant identified and
standards
levels etc. (at center of tower) approved by
TSTRANSCO
before carrying out
soil investigation
B Soil Resistivity One Location in IS:2131, IS 2720 and Contractor Counter check EE/SE
a stretch of 2 to Technical TSTRANSCO and approval by
3 Specifications approved TSTRANSCO
Km or at agency
locations
approved
by
TSTRANS
CO
C Test on Soil and Rock Approval by
Samples TSTRANSCO
C1 Test on soil samples
i Visual and DO Technical specification AEE/EE/
Engineering IS:5613, IS:1498 and other SE
classifications relevant specifications

C2 Tests on Rock At locations Technical specification Contractor Approval by AEE/E


as indicated IS:2131, IS:2720, IS:4078, TSTRANSC TSTRANSCO E/ SE
by 4474 and other relevant O approved
TSTRANSC standards lab
O
i Visual Classifications Technical specification
IS:1498,
5613 and other
relevant standards

4 Selection of Site for 100% Technical specification, Contractor Approval by EE/SE


Material utility/industry storage TSTRANSCO
Storage document Wooden
sleepers, wooden planks,
tarpaulin, steel sheets,
bricks, Barbed wire for
fencing etc site shall be free
from termites

5 Checking of Foundation
Materials
A Cement Supply source to
be approved by
TS Transco

(i) Fineness For each TSTRANSCO Technical Manufacturer Review and AEE/EE/ SE
source MTC specification IS:269, 456, works/ approval of
shall be 1489, TSTRANSCO manufacturers test
furnished for 4031, 8112, 12269 and approved test certificates
every lot of other relevant standards lab/ contractor (MTCS)/laboratory
200 test results by
MTs and TSTRANSCO
part thereof

(ii) Compressive Strength DO DO DO DO DO


(iii) Initial & Final setting time DO DO DO DO DO
iv) Soundness DD DO DO DO DO
(v) Chemical composition of DO TSTRANSCO Technical Manufacturer Review of SE/CE
Cement specification IS:269, 456, manufacturers test
1489, certificates
4031, 8112, 12269 and (MTCS)/laboratory
other relevant standards test results by
TSTRANSCO
9

Sl. Component Operation & Sampling Plan Reference Documents and Testing Agency Remarks Checking
No. Description of Test with Basis Acceptance Norms Authority
B Coarse Aggregates One sample Technical specification IS TSTRANSC Each source will be AEE/EE/
per lot of :383, IS:2386 and IS:2430 O Approved approved by SE
200Cum or & other relevant standards Lab TSTRANSCO
part per each review and
source for acceptance of test
each size` result by TSTransco

(i) Determination of Particle size One sample Technical specification IS Contractor/ Each source to AEE/EE/
(sieve analysis) per lot of :383, IS:2386 and other TSTRANS be approved by SE
200Cum or relevant standards CO TSTRANSCO
part per each approved
source lab
(ii) Flackiness Index DO Technical specification IS Contractor/ DO AEE/EE/
:383, IS:2386 and other TSTRANS SE
relevant standards CO
approved
lab
(iii) Crushing Valve DO Technical specification IS Contractor/ DO AEE/EE/
:383, IS:2386 and other TSTRANS SE
relevant standards CO
approved
lab
(iv) Specific gravity DO DO DO DO DO
v) Bulk Density DO DO DO DO DO
vi) Absorption Value DO DO DO DO DO
vii) Moisture Content DO DO DO DO DO
viii) Presence of DO DO DO DO DO
deleterious materials

C) Fine Aggregates One sample Technical specification IS Contractor/ Each source will AEE/EE/
per lot of :236, TSTRANS be approved by SE
200Cum or 383, 456, 2386, 2430 and CO TSTRANSCO
other relevant standards approved
part per each lab
source

(i) Gradation/ Determination of DO Technical specification IS Contractor/ Each source tol be AEE/EE/
Particle Size (Sieve analysis) :236, TSTRANS by review and SE
383, 456, 2386, 2430, 4031 CO acceptance of test
and other relevant standards approved result by
lab
TSTRANSCO

(ii) Specific gravity and density DO Technical specification IS Contractor/ DO AEE/EE/


:236, TSTRANS SE
383, 456, 2386, 2430, 4031 CO
and other relevant standards approved
lab
iii) Moisture Content DO DO DO DO DO
iv) Absorption Value DO DO DO DO DO

v) Bulk Density DO DO DO DO DO
vi) Presence of DO DO DO DO DO
deleterious materials

D) Water
(i) Suitability (Potable One sample Technical specification IS Contractor Each source to AEE/EE
water is considered for source 456, IS:3025 and other be approved by
suitable for concreting) relevant standards TSTRANSCO

(ii) Cleanliness (Visual Check) 100% DO DO DO AEE/EE

iii) P.H. Value One sample DO Contractor/ DO AEE/EE


per source Min-6 and Max- TSTRANSCO
8 approved test
lab
E) Reinforcement Steel
(i) Identification & Size Random Technical specification Contractor/ Review and AEE/EE/
and approved drawings & TSTRANSCO approval of SE
IS 432, approved test manufacturers test
1139 & 1786 and other lab certificates
relevant standards (MTCS)/laboratory
test results by
TSTRANSCO
10

Sl. Component Operation & Sampling Plan Reference Documents and Testing Agency Remarks Checking
No. Description of Test with Basis Acceptance Norms Authority
(ii) Strength (Tensile test, For steel as per DO Contractor/ DO AEE/EE/
Yield stress/proof stress) IS 1786 under TSTRANS SE
10mm one CO
sample per approved
each
25 MT or part lab
thereof 10mm-
iii) Percentage elongation 16mm one DO DO DO AEE/EE/
sample per SE
each
iv) Bend Rebend Test 35 MT or part Technical specification IS: Contractor/ DO AEE/EE/
thereof. Over 432, TSTRANS SE
16 mm 1 1139, 1786 2502 and CO
sample per other relevant standards approved
each 45 MT lab
or part
v) Reverse bend test for thereof. IS:432, and other Contractor/ DO EE/SE
HDS Wires approved specification TSTRANSCO
approved test
lab
vi) Chemical analysis test One sample IS:432, IS:1139, IS:1786 Contractor/ DO AE/EE/SE
per source and specification TSTRANSCO
approved test
lab

F Earthing material
(i) Visual identification 100% Technical specification IS: Contractor Approval by CE/Const.
5613 and other relevant TSTRANSCO
standards

(ii) Bill of material & installation 100% Technical specification Contractor DO EE/SE
approved drawings & IS
5613
6 Tower Excavation
A) Before Excavation
(a) Checking of pegs condition 100% Every Approved line Contractor Counter check AE/AEE
as per line alignment Location alignment/profiles and approval by
Tech. Specification. IS 4091, TSTRANSCO
5613, CBI & P Publication
No.268 and other
relevant standards
(b) Checking of pit marking as 100% Every Technical specification, Contractor Counter check AE/AEE
per drawing and RI Location IS:4091, 5613 & other and approval by
relevant standards TSTRANSCO
Approved, profile
excavation and foundation
drawings

© Trial Pit DO DO DO DO AE/AEE

(d) Classification of soil DO DO Joint inspection Approval by AEE/ EE/


by TSTRANSCO SE
TSTRANSCO &
contractor
(e) Pit marking DO Contractor Approval by AE/AEE
TSTRANSCO

(f) Pit levels with DO DO DO DO AE/AEE


reference to center peg
levels
(g) Depth of pits as per center DO DO DO DO AE/AEE
peg level (estimate)

(h) Benching (Where required) Where required Technical specification IS Benching Approval by AE/AEE
5613, approved Foundation implement TSTRANSCO
leg contour Profiles and s/
other relevant standards Contractor
B Excavation
(a) Dimensional conformity Each Location Technical specifications Pit excavation Approval by AE/AEE
IS:3764, 408, 4091 &5613, tools/ TSTRANSCO
SP:16 and other relevant contractor
standards Approved
excavation Drgs./
Specification
11

Sl. Component Operation & Sampling Plan Reference Documents and Testing Agency Remarks Checking
No. Description of Test with Basis Acceptance Norms Authority
(b) Verticality & squareness of Each Location Technical specification IS: Joint inspection Approval by AE/AEE
each pit 3764 by TSTRANSCO
TSTRANSCO

© Verification of classification DO DO DO DO AE/AE


of soil type and type of E/
foundation EE/SE

(d) Shoring and Strutting As required Technical specification Steel sheets, Coutner check by AE/AEE/ EE
(Check durability strength & applicable state/ local wooden TS Transco
soundness of staging, fonts body safety regulations planks stuts
adequacy and specific etc/
livels) contractor

(e) Dewatering (Where required) As required Tech. Specification. IS:456 Diesel Coutner check by AE/AEE
and other relevant engine TS Transco
standards pumps. Etc.
contractor
C) Stub & Template
(a) Identification & Assembly 100% Every Technical specification IS: Stub template, Counter check by AE/AEE
Location 5613. Approved drawings water level TSTRANSCO
of stub template and tapes, sand
foundation bags, Jacks
drawing
etc/ Contractor

(b) Stub Setting 100% DO Green concrete DO AE/AEE


every pads,
location adjustable
Jacks, Sand
bags etc.
contractor

© Template levels width & 100% DO DO DO AE/AEE


diagonal every
location
(d) Ground Clearance DO DO DO DO AE/AEE
(e) Stub clearance DO DO DO DO AE/AEE
(f) Tightening of bolts and muts DO DO DO DO AE/AEE
for template, stubs & cleats

D) SHUTTERING 100% All Technical specification IS Joint Counter check AE/AEE


(Form work) Fixing of collapsibl 456 and other relevant inspection and approval by
form boxes check for e location standards approved TSTRANSCO TSTRANSCO
identification dimensions drawings & contractctor
parallisation and
squareness and
equidistance from stubs

E) Concreeting 100% Technical specification IS Joint Counter check AE/AEE


456 and other relevant inspection and approval by
standards & approved TSTRANSCO TSTRANSCO
drawings & contractctor

(a) Control, Concrete mixed Technical specification IS Joint Counter check AE/AEE/
design 456 and other relevant inspection and approval by EE
standards & approved TSTRANSCO TSTRANSCO
drawings & contractctor

(i) Identification of material 100% Technical specification IS Contractor Counter check AE/AEE/ EE
and water supply 383,456 IS:3025, 3550 and approval by
sources and other relevant TSTRANSCO
standards

(ii) Determination of 100% Technical specification IS Contractor/ Counter check of AE/AEE/ EE


characteristics of 269,383,456, 3125, 3550 TSTRANSC test results and
aggregates, cement, water and other relevant O approved approval by
etc. standards test TSTRANSCO
laboratory
12

Sl. Component Operation & Sampling Plan Reference Documents and Testing Agency Remarks Checking
No. Description of Test with Basis Acceptance Norms Authority
(iii) Preperation of mix and 100% Technical specification IS Contractor/ Counter check of AE/AEE/
taking of samples for 456 and other relevant TSTRANSC test results and EE
strength (7days, 14 days & standards O approved approval by
28 days ) and slump report test TSTRANSCO
laboratory

iv) Review of controlled 100% Technical specification IS Contractor/ Approval by AE/AEE/


concrete mix report 456 and other relevant TSTRANSC TSTRANSCO EE
standards O approved
test
laboratory

a) Mixing of concrete 100% Technical specification IS Concrete Mixer, AE/AEE


456 and other relevant water drum, GI
standards sheets, weigh
mixing.
Arrangement
Approved
concrete design
mix report/
contractor

(b) Padding/lean concrete base 100% DO DO DO AE/AEE


and approved drawing

© Reinforcement placing fixing 100% Technical specification DO DO AE/AEE/ EE


as per bar bending IS:2502 and other relevant
schedule standards and approved
2. Check for proper drawing
cover spacers and
chairs.
3. Check whether lapping of
bars are tied properly.

(d) Fixing of form boxes check 100% Technical specification IS DO DO AE/AEE


for identification, dimensions 456 and other relevant
parallisation and squareness standards approved
and equidistance from stubs drawings

(e) Placing of concrete and DO Technical specification IS Poking rods and DO AE/AEE
Ramming 456, IS:5613 and other concrete
relevant standards vibrator.
Approved
concrete design
mix report/
Contractor

(f) Fixing of chimeny colomn DO DO DO DO AE/AEE


width length check square &
parallelism & equidistance
from stub

(g) Placing concrete, poking & DO DO DO Gap between boxes AE/AEE


ramming & reinforcement
rods should be
maintained

F) Box removal check for 100% Technical specification IS TSTRANSCO Reinforcement rods AE/AEE
dimensional conformity 456, and other relevant & Contractor should not be
and workmanship standards appoved Drgs. exposed Boxes
should not be
opened after 24
hours. Approval by
TSTRANSCO
13

Sl. Component Operation & Sampling Plan Reference Documents and Testing Agency Remarks Checking
No. Description of Test with Basis Acceptance Norms Authority
G) Backfilling 100% all Technical Specification/IS: Contractor Boulders of size AE/AEE/
Locations 5613, and other relevant more than 80mm EE
standards Boulder size 80 should not be
mm allowed for
(Max)
backfilling, sufficient
water should be
poured and
rammed for every
200mm layer of
earth, 100mm
height earthen
bund along with
the side of
excavation for
filling water

H) Coping and Curing 100% Technical Specification Contractor At locations in the AE/AEE
IS:5613, and other relevant paddy fields or in
standards the low lying
and approved drawing
areas, the
chimney is to be
extended as per
AP Transco
Approved drawing.
The corner
reinforcement rods
200 mm below the
final chimney level
to
be left un
concerted and the
extensions of
chimney for this
portion and
coping shall be
done after
tower erection.
Curing should be
continued
for minimum 15
days.

I) Laying of Earthing (Pie or 100% all Technical specification IS Joint inspection Earthing type will AE/AEE
Counterpoise type). (Based Locations 3403 by be decided by
on measurement of soil TSTRANSCO & TSTRANSCO
resistivity/ tower contractor
footing resistance)

6 Concrete Cubes Testing 100% one Technical specification. IS contractor/. Cubes mut be AE/AEE/ EE
A) sample for each 456, Approved tested within a week
location (One 516, 1199 and other laboratory by of 20 days curing
sample consists relevant standards TSTRANSC period and tests
of min 4 test O Standard results should be
cubes for 28 Cube Moulds approved before
days strength tower erection by
TSTRANSCO

(i) Strength under compression DO DO DO Approval by EE/SE


TSTRANSCO
14

(ii) Slump test DO DO DOtest Funnel DO AEE/EE


and poking
rod

iii) Unit weight of concrete DO DO DO DO AEE/EE


B) Bricks

a) Ansorption Strength After 24 hours IS:3495 - Contractor / AEE/EE/


immersion in 1966 approved SE
cold water Not more than 20% by testing LAB by
weight TSTRANSCO

Compresive Strength ……..do…….. Not less than ……..do…….. AEE/EE/


b) 40 SE
Kg/Cm
c) Efflorescence ……..do…….. Not more than "Moderate" ……..do…….. AEE/EE/
SE
C) Earth work and
compaction control

a) Degree of compaction 1 test per 2000 IS: 2720 (Par-28) Contractor / Review and SE/EE
Sq.m area approved acceptance of
testing LAB by test results by
TSTRANSCO TSTRANSCO

D) Roads

Water Bound Macadam

a) Aggregate impact value 1 test per 250 IS: 2386 (Part-4) Contractor / Contractor / SE
Cum approved approved testing
testing LAB by LAB by
TSTRANSCO
TSTRANSCO

b) Grading of aggregate 2 tests per 250 IS: 2386 (Part-1) ……..do…….. ……..do…….. SE
and screening Cum

c) Flakiness index and 1 test per 250 IS: 2386 (Part-1) ……..do…….. ……..do…….. SE
elongation index Cum

d) Atterberg limits of 1 test per 50 IS: 2720 (Part-5) ……..do…….. ……..do…….. SE


blinding material Cum
e) Water absorption 1 test per IS: 2386 (Part-30) ……..do…….. ……..do……..
source SE
f) Thickness Regularly ………. ……..do…….. ……..do…….. AE/AEE
.
7 Tower Erection

A) Material Checking

i) Checking of tower members 100& Technical Contractor Approval by AE/AEE/


for damage cleanliness, Specifications TSTRANSCO EE
galvanizing IS:5613 & other
& stacking
relevant standards
and approved
drawings
(ii) Checking of galvanized bolts DO DO DO DO DO
& nuts step bolts d'shackle U
bolts Spring Washer &
accessories
iii) Dimensional check Random DO DO DO DO
15
B) Erection of Super
Structure
(i) Checking of leg Random Technical Joint Before AE/
members/braci Specifications inspection by starting AEE
ng/redun dant IS:5613 & other TS Transco erection of
size & proper relevant & contractor upper
placement standards and section
approved ensure that
drawings. (i) the lower
Tightening of section is
Bolts & Nuts completely
with torque braced and
wrenches all bolts
provided in
accordance
with
approved
drawing (ii)
all plan
diagonally
and
redundants
placed in
position.
Support guys
at main
panels are
used during
erection to
avoid
member
deformations
. Approval
by
TSTRANSC
(ii) Tightness of 100% Technical Joint - do - AE/
bolts each IS:5613 and inspection by AEE
identification location other relevant TS Transco
cleanliness & standards and & contractor
galvanizing other approved
drawings
(iii) Punching of - do - - do- - do - - do- AE/
tightened bolts AEE
(iv) Checking of - do - - do- - do - - do- Vertica
assembly & lity
verticality shall
not
exceed
1: 360
16
(v) Tack Welding 100% Technical Joint Approval byTack
each IS:5613 and inspection by TSTRANSCO weldin
location other relevant TS Transco g dia
standards and & contractor metric
other approved ally
drawings opposit
e,
length
of each
weldin
g at
least
10mm,
2 coats
of Zinc
rich
paint
on
welded
portion
vi) Tower footing - do - - do - Measuremen Approval by AE/
resistance t by 4 TSTRANSCO AEE
measurement electrode
before & after methods by
earthing contractor
vii) Fixing of - do - - do - By Approval by AE/
danger plates, contractor TSTRANSCO AEE
number plates
& phase plates,
circuit plates
(i)Visual Check
(ii)
Dimensional
check

8 Line Stringing
A) Stringing (Sag 100% Technical Contractor Approval by AE/
Tension) chart Specification TSTRANSCO AEE/
IS:5613, Sag EE
Tension
calculations and
stringing chart
approved by
TSTRANSCO
B) Checking of 100% Technical Joint Approval not - do-
insulators Specification inspection by necessary
identification IS:731,5613,IEC TSTRANSCO
cleanliness 383 and other & contractor
packing glazing relevant
cracks & white standards
spots, security approved sag
clips tension
calculation and
approved
stringing chart

C) Measurement 100% Technical TSTRANSCO/ Approval not IR


of IR Value Specification, contractor necessary shall
IS:5613, and be
other relevant more
standards than
approved 50 M
insulator megger Ohms
dbe drawing,

D) Checking of 100% Technical TSTRANSCO/ Approval not


insulators Specification, IS: contractor necessary
hardware 2121,2486,5613
fittings and and other
conductor & relevant
ground wire standards and
accessories approved
drawings
(i) Identification, - do - - do- - do - - do-
Cleanliness &
packing
(ii) Any - do - - do- - do - - do-
mechanical
damage
(iii) Measurement - do - - do- - do - Approval not
of dimensions Hydraulic necessary
before and Compressor,
after making measuring
joint tape and
scale vernier
caliper/contr
actor &
TSTRANSCO
(iv) Checking Random Technical A rigging set Approval not Mech.
mechanical specification IS: up to be necessary Strengt
strength 2121,2486,5613 fabricated in h not
and other the field for to be
relevant testing less
standards and mechanical than
approved strength. 95% of
drawings Contractor UTS of
conduc
tor
18
E) Checking of conductor & Earth wire
(i) Drum schedule 100% Technical Section Counter
approval specification lengths, check and
Approved Tower Drum invoice approval by
schedules, lot TSTRANSCO
wise/contrac
tor
(ii) Identification 100% Technical Joint Approval by
cleanliness & specification and inspection by TSTRANSCO
packing IS:1778,5613 & TSTRANSCO
other relevant & Contractor
standards and
other approved
drawings
(iii) Damage of - do - - do- - do - - do-
conductor &
earthwire
stranding
(iv) Drum rubbing - do - - do- - do - - do-
against ground
& or any metal
part
F) Conductor Entire Technical Joint Approval by Use of
Earthwire Route specification inspection by TSTRANSCO TSE,
Stringing IS:5613 & other TSTRANSCO saggin
relevant & Contractor g
standards and winch
approved SAG & Hydra
Tension charts ulic
dynam
om
eter
and
other
tools
etc.
(i) Initial - do - - do- - do - - do-
conductor
position
(ii) Check for - do - - do- - do - - do- Metal
Temperature enclos
ed
thermo
meter
(iii) Final - do - - do- - do - - do- Consid
conductor ering
position creep
(a) Dimensional - do - - do- - do - - do-
Continuity
19
(b) Joints in - do - - do- - do - - do- No
conductor and bend
Earthwire curve
in the
joint
(iv) Jumpering - do - - do- - do - - do- Minim
(Performed) um
cleara
nce to
be
mainta
ined as
2.10mt
for 220
KV
and
1.54
mt for
132 kv
(v) Tension - do - - do- - do - - do- - do -
Stringing (if
any).
Installation of
pilot string on
DD Tower
9 Final Checking EE/SE
(a) i) Check for 100% Specifications, Join Approval & All
Backfilling IS:5613 and inspection by Acceptance excess
ii) Removing other relevant TSTRANSCO by materi
any stored standards and & contractor TSTRANSC al
material near approved Drgs. O should
to the tower be
iii) Store extra cleared
back fill within away
the base of the as per
tower specifi
iv) Checking cation
of prospective
revetment with
weep holes and
store packing
of weep holes.
(b) Check for ACD Entire - do - - do- - do -
& all tower Route
accessories
(c) Check for - do - - do- - do - - do-
Tightening,
punching and
tack welding of
bolts
20
(d) Check for Final - do - - do- - do - - do-
ground and
electrical
clearances
(e) Check for - do - - do- - do - - do-
effectiveness of
Earthing
(f) Meggering of 100% - do- - do - - do-
the Line
(g) Conductor - do - - do- - do - - do-
continuity Test
(h) Measurement - do - - do- - do - - do-
of line
resistance
(i) Phase - do - - do- - do - - do-
sequence
10 Testing & 100% Technical Testing - do-
Commissioning Specification agency
the Line TSTRANSCO
11 Post
commissioning
checks
a) Check for
visual corona
at insulator,
hardware,
conductor,
accessories
etc.(locations
to be identified
by

Note:
1. Route Plan, approved profiles, approved tower schedule sag
template etc will be made available by the purchaser if the
detailed survey is already carried out by the Purchaser
2. At the time of receipt of material i.e., Tower parts,
Conductors, Hardware fitting accessories, insulators
earthwire etc. TS Transco clearance may be verified by
contractor.
3. TSTRANSCO site office Engineers/Field quality Engineers to
witness/review specified tests.
4. The T & P of the erection contractor shall be inspected at site
by the TSTRANSCO before their use.
GENERAL GUIDE LINES FOR IMPLEMENTATION
22

Section: GENERAL GUIDELINES FOR IMPLEMENTATION

11 CEMENT

11.1 In case supply of cement is in the scope of the contractor, the same shall
be procured from sources approved by TSTRANSCO site and got tested at
site on sample basis for specified acceptance tests as specified in this
FQP at a reputed Third Party Lab approved by TSTRANSCO site.

11.2 The samples of cement for site testing shall be taken within three weeks
of the delivery and all the tests shall be commenced within one week of
sampling.

12. REINFORCEMENT STEEL

12.1 In case supply of reinforcement steel is in the scope of the contractor, the
same shall be procured from the main producers i.e., SAIL, TISCO,
HSCO or Rashtriya Ispat Nigam or the recollers approved by main
procedures. The reinforcement steel shall be got tested at site on sample
basis for specified acceptance tests as specified in this FQP at a reputed
Third Party Lab approved by TSTRANSCO site.

12.2 The result of the testing of cement and reinforcement steel referred to in
13.1 and 14.1 above shall be got approved from TSTRANSCO site before
cement and reinforcement steel are put to use. However, in exceptional
cases due to exigencies of work. TSTRANSCO site may authorize the
contractor to use Cement and Reinforcement Steel even before the test
results are received. However, in all such cases, if the test results
subsequently received are found to be not complying with the specified
acceptance criteria, the contractor shall have to dismantle and recase all
such foundations cast with such non-conforming materials at his own
cost. Confirmation to this effect shall be obtained from the contractor by
the Project authorities beforehand in all such cases.

13. All the testing and measuring equipments used by the contractor for
testing are required to be calibrated. A copy of valid calibration report
shall be retained by TSTRANSCO as records.

14. Calibration certificates to be got verified from TSTRANSCO for tools and
plants and testing equipment before their use.
23
TOWER FOUNDATION

1. CHECK SURVEY

Name of Line: Location No:


Name of Contractor: Type of tower:
i) Approved Detailed Survey Profile Drg. Nos. ………………..
ii) Reference level ………………..

iii) Peg Marked Suspension Locations w.r.t


Detailed Survey Profile O.K./NOT O.K.
iv) Alignment of Loc. w.r.t previous and next loc O.K./NOT O.K.

v) Loc. Of center peg/position of various landmarks


are matching as per profile O.K./NOT O.K.

vi) Any new features on grnd. w.r.t profile


necessitating realignment/shifting of loc. Yes/No

vii) Span on both sides of loc. As per profile Actual


(Mtrs.) (Mtrs.)

a) Preceding span (Loc.No.)


b) Succeeding span (Loc.No.)

viii) Angle of deviation and bisection at tower loc. As per profile Actual

a) Angle of deviation
b) Bisection

Certificate:- Cleared for Pit marking.

FOR CONTRACTOR FOR TSTRANSCO

Signature……………………… Signature…………………………

Name…………………………… Name………………………………

Designation…………………… Designation………………………

Date…………………………….. Date……………………………….
24

2. PIT MARKING

Name of Line: Location No:-

Name of Contractor:- Type of tower:-

i) Approved Pit Marking Drg. Nos. ………………….

ii) Angle of Bisection O.K./NOT O.K.

iii) Position of pegs in line/longitudinal and


transverse direction O.K./NOT O.K.

iv) Position of leg pegs w.r.t center peg of tower O.K./NOT O.K.

v) Position of all four pits are on leveled grnd.and safe Yes/No

vi) Dimensions of pit marking are per drgs. O.K./NOT O.K.

vii) Whether Benching/Revetment required if yes, then Yes/No

a) If contour maps/Revetment drgs. Prepared Yes/No

b) Calculate vol. ………….cu.m.

c) Approved by designated authority Yes/No

Certificate:- Cleared for excavation.

FOR CONTRACTOR FOR TSTRANSCO

Signature……………………… Signature…………………………

Name…………………………… Name………………………………

Designation…………………… Designation………………………

Date…………………………….. Date……………………………….
25
FOUNDATION CLASSIFICATION

Name of Line: Location No:-

Name of Contractor:- Type of tower:-

i) Strata wise pit details

STRATA DEPTH RECEIVING STRATA DEPTH

--------------- -----------------
--------------- -----------------
--------------- -----------------
--------------- -----------------

PIT C/3 PIT B/2


STRATA DEPTH STRATA DEPTH

--------------- -----------------
--------------- -----------------
--------------- -----------------
--------------- SENDING END -----------------

PIT D/4 PIT A/1

NOTE:CLASSIFICATION MAY ALSO BE GIVEN ON ONE PIT EXCAVATION


BASIS FOR NORMAL DRY SOIL FOUNDATION DIMENSION

a) Predominant soil
ii) Sub soil water table details as on date.

PIT A/1 PIT B/2 PIT C/3 PIT D/4

iii) Water table in near by well as on date …………mtrs.

iv) Maxm. Subsoil water table in monsoon season after


through local enquiry ………….mtrs.

v) Surface water table on grnd. In monsoon


season and its duration. ………..mtrs.for……days

vi) Type of cultivation Paddy fields/cultivate land/barren land

Whether encasement of stubs reqd


Due to surface water? Yes/No

If yes, ht. of encasement above grad.level. …………mtrs.


26
vii) Whether soil investigation (SPT) carried out at this Loc.No…………..
loc. or near by loc.
viii) If this loc. strata details are comparable
with above soil investigation report or any
other loc. of this line. Loc. No…………
ix) Details of soil investigation report:-
a) STRATA DEPTH

---------------
---------------
---------------
---------------

b) Subsoil water table. ……….mtrs.

c) Ultimate Bearing capacity. ………..mtrs.

d) Angle of Repose () ……….degrees

x) Foundation classification proposed by contractor.

As per SPT/ Actual


Trial pit

Remarks/Reason:- …………………………….
…………………………….
FOR CONTRACTOR FOR TSTRANSCO

Signature……………………… Signature…………………………

Name…………………………… Name………………………………

Designation…………………… Designation………………………

Date…………………………….. Date……………………………….
Approval

Site visited on…………………………………………………..and details verified


The classification of foundation is approved as…………………………………

FOR TSTRANSCO
Signature…………………………

Name………………………………

Designation………………………

Date……………………………….
27

4. STUB SETTING

Name of Line:- Location No:-

Name of Contractor:- Type of tower:-

i) Approved drg.Nos.

a) Stub setting template ………………………..


b) Pit dimension ………………………..
c) Stub assembly ………………………..

ii) Pit Dimensions.

a) Depth of pits From Ref. Level Ground Level

Pit A
Pit B
Pit C
Pit D

b) Pit dimensions are as per approved foundation


classification Yes/No

c) Excavated soil is kept 2m away from pit edge. Yes/No

d) Under cutting done in case of partially dry,


dry Fissured rocks & mixed dry Yes/No

iii) Alignment of template.

a) Tangent Tower
a.a) In the direction of line Yes/No
b) Angle Tower
b.a) Angle of deviation ….degrees
b.b) Alignment of template on bisection Yes/No
iv) Diagonals of template
AC…….m
BD…….m

=Angle of Deviation.
PQ=Line of Bisection.
(Lines AD and BC are
perpendicular to PQ)
28

STUB SETTING ON BISECTION

v) Level of template checked by dumpy/water level Yes/No

vi) Ht. Of template above ground level. ………….Cms.

vii) Clearance between lowest part of stub and P.C.C.


(not less than 15 cm in dry and 20 cm in wet
foundation or as specified in the drg.)
Leg A……….cm.
Leg B……….cm.
Leg C……….cm.
Leg D……….cm.

viii) Jacks placed on firm ground Yes/No

ix) Template supports/jacks positioning causing any


danger to collapse of pit. Yes/No

x) Green concrete blocks placed below stubs to avoid


displacement of stub. (only for Prop setting) Yes /No

xi) All members of template are fixed as per drg.


and fully tightened Yes /No

xii) Checking of stubs

a) Stub dimensions are as per type of tower Yes /No

b) All plates/cleats fixed with reqd.no.of Nut/bolts


and are fully Yes /No

c) Is earth flat fixed (for tower earthing) Yes /No

Certificate: Stub Setting Approved.

FOR CONTRACTOR FOR TSTRANSCO

Signature……………………… Signature…………………………

Name…………………………… Name………………………………

Designation…………………… Designation………………………

Date…………………………….. Date……………………………….
29

Availability check of :

i) leveling instruments
ii) Theodo …………
iii) sieves 0.15, 0.3, 0.6, 1.18, 2.36, 4.75, 10,12,20 mm
iv) screw gauge
v) slump cone
vi) No. of cubes cost

5. CONSTRUCTION OF MATERIALS
Name of Line:- Location No.:-
Name of Contractor:- Type of tower:-
i) Quality /Qty. of Cement as per approved Drgs./Specifications/
Agreement /Booklet on Guidelines on Implementation of QAP

Quantity Quantity Available Approved Quality (Ok/Not


Required at Location Source Ok)
1) Stacking
2) Organic/foreign
material
3) Lumps

ii) Quality /Qty. of Sand/Fine Aggregate as per approved Drgs./


Specifications / Agreement / Booklet on Guidelines on Implementation of
QAP
Quantity Quantity Available Approved Quality (Ok/Not
Required Source Ok)
1) Stacking
2) Organic/foreign
material
3) Lumps
4) Fine Sand Silt
and if no
5) Sieves quotable.
iii) Quality/Qty. of Metal/Coarse Aggregate as per approved drgs. And
specifications.
Size Quantity Quantity Approved Quality (Ok/Not Ok)
Required Avail Source
40mm(P.C.C) i) Stacking
20 mm ii) Organic/Profile
(Slabs& material
Chimney) iii) Flackiness, soft
10 mm (15 to hammer shaper
20% of 20 mm)

iv) Dimensions of the measuring Box. OK/NOT OK


(30 cm x 30 cm x 39 cm Height)
30

v) Proportions of concrete Mix. by volume derived from controlled design


mix by weight.

Grade of Qty. of Qty.of fine Qty. of Cement Qty. of Water


Concrete Coarse Aggregate
Aggregate
M-15 6 Boxes 3 Boxes 1 Bag 34.1 litres
M-20 4 Boxes 2 Boxes 1 Bag 28 Ltrs.

* Volume proportioning of material by boxes to be verified & conformed


after finalisation of Controlled Design Mix by weight.

vi) Quality & Qty. of water as per specns. OK/ NOT OK

vii) Reinforcement steel.


a) Qty. & Quality as per Apprd. Drg./specns.

Dia.(MT) Qty. Qty. Avail Apprd. Source Quality (Ok


Reqd.(MT) /Not Ok)
6 mm
8 mm
12 mm
16 mm
22 mm
32 mm
…mm
…mm

viii) From Boxes.


a) Dimensions are as per Apprd. Drgs. OK /NOT OK
b) Oiling of inner wall of form boxes OK /NOT OK

Certificate:- Material & T &P cleared for lean concreting

ix) Lean concreting:-

a) Pits are free from all Foreign Materials Yes/No


b) Pits are free from standing water (Dewatering continued
in advance by Pumps / Buckets) Yes/No
c) Mix ratio 1:3:6 with 40 mm metal Yes/No
d) Concrete mixing by mixer as per specn. Yes/No
e) Mixture running time (mixing Time 2 ½ mins.) Yes/No
f) De-watering done. Yes/No
g) Lean concreting done upto specified level and in all the
four pits. Yes/No
h) No. of cement bags consumed As per design Actual
31

x) In case of excess excavation filling is done by lean


concrete & no loose soil is permitted for filling.

Vol. of excess lean concrete.

Certificate:- Pits are cleared for installation of reinforcement and form


boxes.

FOR CONTRACTOR FOR TSTRANSCO

Signature……………………… Signature…………………………

Name…………………………… Name………………………………

Designation…………………… Designation………………………

Date…………………………….. Date……………………………….
32

6. INSTALLATION OF REINFORCEMENT STEEL & FORM BOXES

Name of Line:- Location No.:-

Name of Contractor:- Type of tower:-

i) Apprd.Drg.Nos. ----------------------------

----------------------------

ii) Reinforcement steel

a) Quality/Qty. as per specification Yes/No


b) Bending /Placing as per approved drg. Yes/No
c) Required no. of chairs approved Yes/No
(Min Dia-12 mm, Max. spacing-500mm)
d) Binding done as per specifications. Yes/No
e) Any undue stress or bending of steel bars Yes/No
f) Steel is clean and free from loose rust or any
other foreign matls Yes/No
g) Position of bars w.r.t stub as per drg. OK /NOT OK

iii) Form Boxes:-

a) Dimensions as per approved drg. OK /NOT OK


b) Placing w.r.t stub as per approved drg. OK /NOT OK

iv) Clear cover of 50 mm (or as per specification available) Yes/No

Certificate:- Cleared for foundation casting.

FOR CONTRACTOR FOR TSTRANSCO

Signature……………………… Signature…………………………

Name…………………………… Name………………………………

Designation…………………… Designation………………………

Date…………………………….. Date……………………………….
33

7. MIXING, PLACING AND COMPACTION OF CONCRETE

Name of Line:- Location No.:-

Name of Contractor:- Type of tower:-

i) Apprd.Drg.Nos. ----------------------------

ii) Mix Ratio ----------------------------

a) For Pyramid/base with 20 mm metal with specified ratio Yes/No


b) For chimney with 20 mm metal with specified ratio Yes/No
c) Water to cement ratio as per specification Yes/No

iii) Mixing done by

Mixer (Running time 2 ½ mins.)


iv) Use of poking rod for compacting Yes/No
v) Use of vibrator for compacting Yes/No
vi) Checking of templates levels & its
diagonals at regular intervals OK /NOT OK
viii) Casting of legs done in continuity Yes/No
ix) No. of cement bags consumed As per drg. Actual
x) Removal of stub template, shoring &
shuttering and stripping of form work
after 24 hours of concreting, observe
the damage and make rectification Yes/No

xi) Back filling and compaction of backfilled


as per specification Yes/No

xii) Curing of backfilled earth & chimney carried


out for period as per specn. Yes /No
(Minimum period of curing 14 days after concreting)

a) Availability of water pump with storing


arrangement for curing purpose ------------------

b) Date of start of curing ------------------

c) Date of completion of curing -----------------

xiii) Cubes, last sent for testing as per approved FQP Yes/No

xiv) All the surplus materials removed from site Yes/No

Certificate:-Foundation is cleared for tower erection subject to fulfillment of


Part (I) before tower erection and Part (II) in due course as follows.
34

Part-I Setting period (28 days) is allowed as per specification

Part-II (i) Revetment benching proposal status…………………………….

(ii) Revetment benching likely execution date……………………..

FOR CONTRACTOR FOR TSTRANSCO

Signature……………………… Signature…………………………

Name…………………………… Name………………………………

Designation…………………… Designation………………………

Date…………………………….. Date……………………………….
35

CONCRETE CUBE TEST REPORT

Name of work :

Agreement No. :

Sample No. :

Identification Mark :

Portion of Work or Qty. represented sample:

Date & Time of casting :

Proportion of Mix :

Duration of Curing at site and


Site temperature before
Transportation to test Lab
and Temperature

7 days 28 days

1. Due date of test ……………….. ……………

2. Actual date of testing ……………….. ……………

3. Delay in testing ……………….. ……………

4. Actual Average compressive strength ……………….. …………….

5. Is average comp. Strength equal to or Yes/No Yes/No


more than specified comp.strength

(Signature of Executing Agency) (Signature of TSTRANSCO


Official)

Date…………………………. Date………………………….
36

CHECKING OF FOUNDATION MATERIAL

(A) CEMENT

i) Approved brand of cement (Ramco/Pennar/Raasi) OK/NOT OK

ii) Stacking of cement bags OK/NOT OK

a) Protective covering found OK/NOT OK

iii) Condition of cement bags Damaged/Undamaged

iv) No. of cement bags leaking ------------

(Signature of Executing Agency) (Signature of TSTRANSCO


Official)

Date…………………………. Date………………………….

(B) COARSE & FINE AGGREGARE

i) Stacking of aggregates OK/ NOT OK

ii) Size of aggregated


Coarse aggregate 20 mm (80 to 85%)
10 mm (15 to 20%)

Fine aggregate /sand 4.75 mm conforming to Grade Zone – I sand.

iii) Organic material and foreign material and if yes


ensure cleaning Yes/No

iv) Coarse aggregate-Flake ness, soft slice and laminar shape Yes/No

v) Fine aggregate/Sand-Lumps and silt and if yes Yes/No


sieve available for cleaning Yes/No

(Signature of Executing Agency) (Signature of TSTRANSCO


Official)

Date…………………………. Date………………………….
37

(C) REINFORCEMENT STEEL

i) Approved reinforcement bending schedule Drawing No………………….

ii) Dimensions and nos of the reinforcement bars and rigs Yes/No

iii) Cleanliness of reinforcement bars from rust, mill deposit etc.,Yes/No

iv) Binding wire availability Yes/No

v) adequate fabricated chairs and gitties for supporting


of reinforce bars availability Yes/No

(Signature of Erection Agency) (Signature of TSTRANSCO


Official)

Date…………………………. Date………………………….
38

FORMAT FOR TEST REPORT OF WATER

Name of line…………………………….. Source of water supply…………….

Sample Indent Mark………………..

Name of Executing Agency…………….. Date…………………….

Name & address of Test Lab ………………………………………………


………………………………………………
………………………………………………
………………………………………………

Test Report Ref. No…………………………………………..

Sl.No. Description Requireme Permissible limits (Max.)


nt/Tested
as per
1 Water Potable ---
2 Naturalization 100 ml IS: 3025 5ml 0.02 Normal Na oH
H20
* Using Phenolphthalein
as indicator
* Using Mixed indicator
25ml 0.02 Normal Na oH
3 PH Value IS:456 Not less than 6
4 Solids
a) Organic IS:3025 200 mg/l
b) In Organic IS:3025 3000 mg/l
c) Sulphate (SO3) IS:3025 4000 mg/l
d) Chlorides IS:3025 2000 mg/l (for non-
reinforced concrete)
e) Suspended Matter IS:3025 500 mg/l (for reinforced
concrete)
5 Compressor strength IS: 516 90%
(20 days) for three 150
mm concrete cubes made
with proposed water Vis-
a Vis similar cubes made
with distilled water
39

6 No. Description Requireme Permissible limits (Max.)


nt/ Tested
as per
7 a) Initial setting time for IS: 4031 Not less than 30 months
test cube made with
proposed water
b) Variation in initial 30 months
setting time for test cube
made with proposed
water and distilled water

Note: Latest values may be seen by referring the latest IS code as


amended as per Relevant standards (IS 3025, 456, 516, 4031) and
TSTRANSCO Technical Specification.

(SIGNATURE OF LOCAL OFFICIAL) SIGNATURE OF ERECTION


AGENCY

DATE. DATE……………….

SAMPLE IS APPROVED FOR CONCRETING

(SIGNATURE OF TSTRANSCO OFFICIAL)

DATE…………………..
CEMENT REGISTER
41

CHECKING OF FOUNDATION MATERIAL

(A) CEMENT

Records of cement testing as


Per approved SFQP
(a) Details of samples
per 200 MT from each source are
maintained as per SFQP --------------------------
(b) All the tests as per approved SFQP are
carried out and details maintained --------------------------
(c ) Joint reports for collection of samples
in case of site testing are available --------------------------

(Signature of Erection Agency) (Signature of TSTRANSCO


Official)

Date…………………………. Date………………………….
COARSE/FINE AGGREGATE REGISTER
43

CEMENT RECEIPT & TEST FREQUENCY RECORD

Name of Line……………………………….. Location of ……………………

Name of Erection Agency………………… Source of supply………………

Qty. Received Bags/MT

Test Results are as per


TSTRANSCO Approved
Certificate No. & Date

Lab test Report No. &


Manufacturer’s Test
Cum Qty. Received
Batch No./Lot No.

Approved SFQP
Date of Receipt

Signature
Bags/MT
Sl.No

Date

Note: (1) MTC shall be available for every 200 MT or part thereof
(2) Lab Test Report shall be available for every 200 MT or part thereof
44

FORMAT FOR JOINT SAMPLING OF CEMENT

We have collected the sample of Cement as per following details joined:

1. Location of stores it:

2. Source of supply :

3. Type and Grade of cement:


(OPC/PPC, grade 33.43.53)

4. Batch No. /Lot No. of cement

5. No. & Quantity of sample

6. Name & Address of Lab where


samples are being sent for testing
(vide letter No. & date)

The samples have been sealed and one identification mark slip duly signed her
been placed inside the bag & another slip duly signed has been placed on the
bag.

(Signature of Erection Agency) Signature of TSTRANSCO


Official

Date………………………………… Date…………………………………
45

FORMAT FOR TEST REPORT OF CEMENT

Name of line Source of Supply


Name of Executing Agency Sample Ident. Mark
Test Report Ref. No. Date:
Name & Address of Test Lab

Sl.No Particulars Requirement as per As per


IS 269 33 Grade IS 8112 43 Grade IS 12269 53 IS 1489-I & 3rd
OPC OPC Grade OPC II, Fly Ash or party Approved
Clay based Lab. Test
Result
A. Chemical Properties --
1. Cao-0.7 SO3 0.66 to 1.02 0.66 to 1.02 0.8 to 1.02
2. 2.8SiO2+1.2A12O3+0.65Fc2O3
3. 203% Fc203 0.66 MIN 0.66 MIN 0.66 MIN --
4. Insoluble Residue 4.0 MAX 2.0 MAX 2.0 MAX 13.6 to 2.8**
(%by mass)

5. Magnesia(%by 6.0 MAX 6.0 MAX 6.0 MAX 6.0 MAX


mass)
6. Sulphuric 3.0 MAX 3.0 MAX 3.0 MAX 3.0 MAX
Anhydrite(% by
mass)
7. Total loss of 5.0 MAX 5.0 MAX 5.0 MAX 5.0 MAX
ignition(%)
8. Chloride(%) 0.05 MAX 0.05 MAX 0.05 MAX --
B. Physical Properties
1. Fineness 225 MIN 225 MIN 225 MIN 300 MIN
(SQM/Kg.)
2. Setting time (minutes)
i) initial 30 MIN 30 MIN 30 MIN 30 MIN
ii) final 600 MAX 600 MAX 600 MAX 600 MAX
3. Soundness
a) Le-chat
Expansion(MM)
i) Unacrated 10.0 MAX 10.0 MAX 10.0 MAX 10.0 MAX
cement
ii) After 7 days 5.0 MAX 5.0 MAX 5.0 MAX 5.0 MAX
Acration
b) Auto clave expansion (%)
i) Uncrated 0.8 MAX 0.8 MAX 0.8 MAX 0.8 MAX
cement
ii) After 7 days 0.6 MAX 0.6 MAX 0.6 MAX 0.6 MAX
Aeration
4. Compressive Strength (Mpa)
a) 72+/- 1 hour 16 MIN 22 MIN 27 MIN 16 MIN
b) 168 +/-2 22 MIN 33 MIN 37 MIN 22 MIN
hours
c) 672+ /-4 hours 33 MIN 43 MIN 53 MIN 33 MIN
** X+4.0(100-X)/100 Where X is the declared 1% of pozzolona in the given Portland pozzolona
cement. X Ranger from 10 to 25%.

Note: Latest values may be seen by referring the latest IS code as amended.
46

COARSE & FINE AGGREGATE

Record of Coarse Aggregates testing as per approved SFQP

a) Details of samples per 200 cum from


Each source for each size (40mm, 20mm)
And fine aggregate are maintained as per SFQP ----------------------

b) All tests as per approved SFQP


are carried out and details
maintenanced ----------------------

c) Joint Report for collection of


Samples for testing at TSTRANSCO
Approved lab is available ----------------------

(Signature of Erection Agency) Signature of TSTRANSCO Official

Date………………………………… Date…………………………………
47

COARSE & FINE AGGREGATE CONSUMED & TEST FREQUENCY


……………………..

Name of Line --------------------------------- 40 mm metal------------


20 mm metal
Name of Erection Agency --------------------
Foundation
Casting

Loc No.

Type of
Date of
Sl No

40 mm metal 20 mm metal Sand Signature

Commutative

Commutative

Commutative

TSTRANSCO
Consumed

Consumed

Consumed

Erection
Agency
MT

MT

MT

Note: One sample per lot of 200 MT or part there of (each for 40 mm, 20 mm
metal and sand)………………………………Date of sampling and test report
reference to be recorded in this format.
48

FORMAT FOR JOINT SAMPLING OF COARSE & FINE AGGREGATE

The sample of coarse line aggregate as per the following details have been
collect ………………………..

(1) Location of sit

(2) Source of supply

Size of Aggregate Source

40 mm ………………

20 mm ………………

Fine Aggregate ………………

(3) No. & Quantity of Samples taken

(4) Name & address of


Lab where samples are
Being sent for testing
(vide letter No. & date)

The samples have been sealed and identification mark slip duly signed has
been placed inside the bag & another slip duly signed has been pasted on the
bags.

(Signature of Erection Agency) Signature of TSTRANSCO


Official

Date………………………………… Date…………………………………
49

FORMAT FOR TEST REPORT OF FINE AGGREGATES

Name of Line Source of Supply

Name of Executing Agency Sample Ident.Mark

Name & address of Test lab Date

Test Report Ref.No.

Sl Description of test Acceptable Limits As per IS 383 Test Remarks


No Results
Percentage of Passing Zone wise
Zone-I Zone-II Zone-III Zone-IV
1. Sieve Analysis
10 mm 100 100 100 100
4.75 mm 90-100 90-100 90-100 95-100
2.36 mm 60-95 75-100 85-100 95-100
1.18 mm 30-70 55-90 75-100 90-100
600 micron 15-34 35-59 60-79 80-100
300 micron 5-20 8-30 12-40 15-50
150 micron 0-10 0-10 0-10 0-15
2. Silt content 8% Max. 8% Max. 8% Max. 8% Max.
3. Deleterious 5% Max. 5% Max. 5% Max. 5% Max.
Materials

Note: Latest values may be seen by referring the latest IS code as amended.

Certificate: It is certified that test results meet all the requirements as


per IS383 and TSTRANSCO Technical specifications.

(Signature of the Lab Official) (Signature of Erection Agency)

Date:…………………….. Date……………………….

Sample is approved for concreting/masonary mortar/plastering

(Signature of Powergrid Official)

Date:…………………………..
REINFORCEMENT STEEL REGISTER
51
REINFORCEMENT STEEL

Record of reinforcement steel


As per approved SFQP.

(a) Details of sample:


from each source
for each size are
maintained as per
approved SFQP

(b) All tests as per


approved SFQP are
carried out and
details maintained

(c ) Joint Reports for


collection of samples
for testing at powergrid
approved lab is available.

(Signature of Erection Agency) Signature of TSTRANSCO


Official

Date………………………………… Date…………………………………
52

REINFORCEMENT STEEL RECEIPT & TEST FREQUENCY RECORD

Name of Line…………………….. Location of store………………………..

Name of Erection Agency……………… Source of supply……………………….

S.No. Date of Grade/ty Diamet Quantity received Manufactur TSTRANSCO Test Signa
Receipt pe & Lot er er’s Test Approved Lab Results ture
No. Qty. Cum Certificate test Report are As per
Regd.in Qty.MT No. & date No. & date Approved
Lot SFQP
(MT)

Note: MTC and TSTRANSCO approved lab test report shall be available as per
approved SMQP.
53

FORMAT FOR JOINT SAMPLING OF REINFORCEMENT STEEL

The samples of reinforcement steel as per the following details have been
collected jointly by us:

(1) Location of store/site

(2) Source of Supply

(3) Diameters of rods

(4) Length of rods

(5) Lot No.(s)

(6) No. of samples taken

(7) Name & Address of lab


where samples are
being sent for testing
(vide letter No. & date)

The samples have been wrapped together & placed inside the bag. One
identification mark slip duly signed the bag & another slip duly signed has
been pasted on the bag.

(Signature of Erection Agency) Signature of TSTRANSCO Official

Date………………………………… Date…………………………………
54

FORMAT FOR TEST REPORT OF REINGORCEMENT STEEL

Name of Line Source of Supply

Name of Executing Agency Sample Ident.Mark

Name & address of Test lab Date

Test Report Ref.No.

Sl Description of test Acceptable Limits As per Test Results Remarks


No
IS 432 MS IS 1786 Manufac. Specn.
Grade I Fc 415 TMT 415
Above 20
mm dia
1. Chemical Analysis 0.23+/-0.02 0.30+/-0.02 0.25 +/-0.02 Max
Max. Max
a) Carbon (C) % 0.055+/- 0.06 +/- 0.05+/-0.005
0.005 Max 0.005 Max Max
b) Sulphur (S) % 0.055+/- 0.06 +/- 0.05+/-0.005
0.005 Max 0.005 Max Max
c) Phosphorous(P) 0.055+/- 0.06+/- 0.05+/- 0.005
% 0.005 Max 0.005 Max Max
d) Sulphur and % 0.11+/-0.01 0.11+/-0.01 0.10 +/- 0.01
Phosphorous Max Max Max
2. Mechanical Properties
a) 0.2% proof 250 Min 415 Min. 415 Min
stress N/SQ.MM
b) Ultimate Tensile 410 Min 485 Min 500 Min
Stress N/SQ MM
c) Elongation 23 Min 14.5 Min 22 Min
d) Bend Test No No No
crack/Fract crack/Fract crack/Fracture at
ure at Bend ure at Bend Bend visible
visible visible
e) Rebend Test No No No
crack/Fract crack/Fract crack/Fracture at
ure at Bend ure at Bend Bend visible
visible visible

Note: Latest value may be seen by referring the latest IS code as amended.

Certificate: It is certified that test results meet all the requirements as


per IS and TSTRANSCO Technical specifications.

(Signature of the Lab Official) (Signature of Erection Agency)

Date:…………………….. Date……………………….
Sample is approved

(Signature of Powergrid Official)


Date…………………………………
CONCRETE CUBE TESTS REGISTER
56

CONCRETE CUBE TEST REPORT

Name of work :

Agreement No. :

Sample No. :

Identification Mark :

Portion of Work or Qty represented sample:

Date & Time of casting :

Proportion of Mix :

Duration of Curing at site and


Site temperature before
Transportation to test Lab
And Temperature

7 days 28 days

1. Due date of test ………………………………………………

2. Actual date of testing ………………………………………………

3. Delay in testing ……………………………………………..

4. Actual Average compressive strength ……………………………..

5. Is average comp. Strength equal or


more than specified comp. Strength Yes/No Yes/No

(Signature of Executing Agency) (Signature of TSTRANSCO

Official) Date…………………………………..

Date……………………………………..
57

TOWER ERECTION

Name of the Line:- Location No:-

Name of Contractor:- Type of tower:-

Approved Drg.No:-

Approved Bill of Material:-

Items Checked Results Observations

1. Setting period of foundation is allowed


for atleast 14 days (preferably 28 days)
as per specification Yes/No

2. All tested tools and plants and safety


equipments in working conditions are
available at site Yes/No

3. All tower members, Nuts,/bolts are


available at site without any damage, bent
or rusting and kept on ground serially
according to erection sequence Yes/No

4. Benching /revetment, if nay, completed.


If not, then program of completion Yes/No

5. Shutdown of power line, if required,


is arranged Yes/No

6. Required no.of safety helmets, safety belts


& safety shoes are being used. Yes/No

7. First section is completely braced and all


plane diagonals are place in proper position Yes/No

8. Guying of tower provided as per


approved drawings and norms.
Guying to be terminated on firm ground. Yes/No

9. All nuts/bolts, flat/spring washers are


provided as per approved drawings Yes/No

10. All bolts to have the nuts facing outside for


horizontal or near horizontal bolt connections
and downwards for vertical bolt connections
(Cl.2.27.5.1.1 of the Technical Specification) Yes/No

11. All the inner contact surfaces at joints painted


with zinc rice paint (Cl.2.28.3 of the Technical
Specification) Yes/No
58

12. Subsequent section are erected only after


complete erection and bracing of previous
section Yes/No

13. Any undue stress, bending or damage of


member during erection noticed Yes/No

14. Filling of holes or cutting of members during


erection observed Yes/No

15. Any heavy hammering of bolt causing


damage of threads noticed Yes/No

16. Any substitute of tower member erected,


if, yes, member nos. Yes/No

17. Tightening is done progressively from


top to bottom Yes/No

18. All bolts at same level on all the four faces


tightened simultaneously staring from leg
to face on right side by four individuals Yes/No

19. Slipping/running over nuts/bolts are


replaced by new ones Yes/No

20. Threaded portion of bolts projected outside


of nut is not less than 3 mm and not more Yes/No
than 8 mm

21. Punching of threads projected outside is


done at three positions on dia Yes/No

22. Half round Tack welding of bolts nuts at two


diametrically opposite places upto the bottom Yes/No
cross arm and each weld length at least 10mm

22 a) Zinc rich (at least 90% zinc content) on the


tack welds on the nuts Yes/No

23. Verticality of tower (1 in 360) is checked with


help of Theodolite for both longitudinal &
transverse direction. This is within specified Yes/No
limits

24. Details of missing member, nut, bolts, etc. Yes/No


25. Mention the tower taking resistance value: Yes/No

Certificate: Tower erection is complete in all respects and footing resistance is within
permissible limit.

FOR CONTRACTOR FOR TSTRANSCO


Signature……………………… Signature…………………………

Name…………………………… Name………………………………

Designation…………………… Designation………………………
Date…………………………….. Date……………………………….
59

TOWER ACCESSORIES

Name of the Line:- Location No:-

Name of Contractor:- Type of tower:-

Approved Drg.No:-

Items Checked Results Observations

1. GI bolts and nuts fully tightened and


placed as per approved drawing.

a) Number Plate Yes/No


b) Phase Plates(set of 3 per circuit) Yes/No
c) Danger Plates Yes/No
d) Circuit Plate (2 Nos.) Yes/No
e) Name plate Yes/No
f) Bird guards (Suspension tower only) Yes/No
g) Earthing bond (One on suspension
tower and two on tension towers) Yes/No
(37/7/0.417 mm Stranded Tinned Copper)
h) Step bolts with spring washers 450 mm
spaced on diagonally opposite leg
provided 3.5m above the ground Yes/No
level to top of the tower
i) Step bolt holes available upto 3.5m Yes/No
above ground level.

2. Anti-climbing device including barbed


wire, cleats, Barbed wire fixing Galvanized
MS member with fully tightened bolts. Yes/No

3. Aviation signals/Paints as per


requirement/specification provided
where required. Yes/No

Certificate: All Tower accessories provided satisfactorily

FOR CONTRACTOR FOR TSTRANSCO

Signature……………………… Signature…………………………

Name…………………………… Name………………………………

Designation…………………… Designation………………………

Date…………………………….. Date……………………………….
60

PIPE TYPE EARTHING

Name of the Line:- Location No:-

Name of Contractor:- Type of tower:-

Approved Drg.No:-

Items Checked Results Observations

1) Earthing on leg A/1 Yes/No


2) GI Pipe (25mm dia, 3m long) Flat
(50x6 mm, 5m Long) with nuts and bolts Yes/No
fully tightened and placed as per
approved drawing.
3) Placement of Flat along with stub and
bending of flat inside the form box as Yes/No
per approved drg.
4) Burying of Flat 650mm below ground Yes/No
5) Bore hole (300 mm dia) and depth
(3000 mm) Yes/No
6) Gap (150 mm) between the GI pipe
bottom end and bottom of the bore hole Yes/No
7) Finely broken coke (grain size not more
than 25 mm) and salt (proportion 10:1) Yes/No
filled in bore hole around the pipe.
8) Mix of Bentonite powder in 1:6 ratio Yes/No
9) Back filling done Yes/No
10) Earthing resistance measurement
(less than 10 Ohm) and if not so, then Yes/No
11) Additional earthing pipe installed. Yes/No
12) Repeat earthing resistance measurement
(less than 10 ohm) Yes/No

Certificate: Footing resistance within permissible limits.

FOR CONTRACTOR FOR TSTRANSCO

Signature……………………… Signature…………………………

Name…………………………… Name………………………………

Designation…………………… Designation………………………

Date………………………….. Date……………………………….
61

COUNTER POISE EARTHING

Name of the Line:- Location No:-

Name of Contractor:- Type of tower:-

Approved Drg.No:-

Items Checked Results Observations

1) Earthing provided on all the four legs Yes/No

2) GSS earth wire 7/3.15, 25m long),


MS rod (20 mm dia, 6mtrs long) with
nuts and bolts fully tightened and Yes/No
placed as per approved drg.

3) Burying of GSS earthwire


1000 mm below ground OK/NOT OK

4) MS rod (20mm dia, 600 mm length)


at the end of earthwire. Yes/No

5) Back filling done Yes/No

6) Earthing resistance measurement


(not less than 10 ohm) Yes/No

7) Additional counter poise installed Yes/No

8) Repeat earthing resistance


measurement ( less than 10 ohm) Yes/No

Certificate: Footing resistance within permissible limits.

FOR CONTRACTOR FOR TSTRANSCO

Signature……………………… Signature…………………………

Name…………………………… Name………………………………

Designation…………………… Designation………………………

Date………………………….. Date……………………………….
62

STRINGING

Name of the Line:- section: Loc.No……to Loc. No:-

Name of Contractor:- Type of tower:-

Approved Tension Stringing Chart:-

Approved Drum Schedule:-

Items Checked Results Observations

1) Back filling of soil and revetment/


benching wherever required is done. Yes/No

2) Towers are tightened properly and all the


members, nut/bolts are provided. Yes/No

3) Tress in the ROW removed to facilitate


smooth stringing Yes/No

4) All line materials, tested and calibrated


T &P safety equipments and relevant
drawings available for stringing. Yes/No

5) Shutdown of Power line/Railway


block if required, is arranged. Yes/No

6) Necessary Protection/scaffolding /
warning signals provided for Railway/ Yes/No
Power line/P&T line/Road crossing.

7) Towers vulnerable for one side load


is guyed properly. Yes/No

8) Tower footing resistance is within


permissible limit of 10 Ohms. Yes/No
63

B) Paving Out of Earthwire.

1) Work is being carried out with


fully safety measures. Yes/No
2) All pulleys fixed on towers for paving
out are moving freely. Yes/No
3) Effective communication exists
through walkie-talkie and through Yes/No
persons with red flags on towers.
4) Earthwire is being constantly checked
as it is unwound, Damaged portion, if any,
is removed. Yes/No
5) Necessary arrangement have been
provided to avoid rubbing of earthwire
against hard ground. Yes/No
6) Necessary details of earthwire,
M.S.Joints Recorded as per Annex Yes/No
CFI & CF II

C) Paving Out of Conductor

1) Work is being carried out with full


safety measures Yes/No
2) Conductor drums are placed
properly to avoid bird caging. Yes/No
3) Sequence of paving out is such
that to avoid unbalancing of
load on tower Yes/No
4) Details of insulators and fitting are
recorded. As per Annex CF III and Yes/No
Annex CF IV.
5) Travelers fixed on towers are
moving freely Yes/No
6) Effective communication exists through
Walkie-Talkie and through persons with
red flags on towers. Yes/No
7) Conductors is checked continuously as
it is unwound from drum. Damaged
portion if any, is removed/repaired. Yes/No
8) Travelers fixed on towers are
moving freely Yes/No
9) Effective communication exists through
walkie-talkie and through persons with
red flags on towers. Yes/No
10) Conductors is checked continuously as
it is unwound from drum. Damaged
portion if any, is removed/repaired. Yes/No
64

11) Proper arrangements made to avoid


rubbing of conductor on ground/hard Yes/No
surfaces.
12) Details of conductor M.S.J. /repair
sleeve are recorded as per Annex CF II Yes/No
and Annex CF II.

D) Final Sagging & Tensioning of Earthwire & Conductor

1) Sag Board is fixed correctly after


taking into account length of suspension Yes/No
clamp/fittings in case of Earthwire and
Suspension insulator string in case of
conductor.
2) Sag/Tension is measured correctly at
prevailing temperature. Details recorded Yes/No
as per Annex CF V.
3) Minimum Ground Clearance, clearance
over Power line/Railway Line/River Yes/No
crossing/Telecom/Road are as per
specification.

E) Dead Ending

1) Subsequent to final sagging, dead end


work is done marking the length of
conductor corresponding to single/double
tension string for conductor and dead end Yes/No
clamp for ground wire.
2) Corresponding to dead end clamp drawing,
the aluminum strands over the steel core
are cut and steel portion and aluminum
portion of dead end clamp is compressed
as applicable to conductor and only steel
clamps for ground wire. Yes/No
3) Clipping offsets marked with felt tip
marker and not with sharp instruments
denting conductor stands. Yes/No
65

4) For power line crossing section


precautions taken before clipping. Yes/No
i) The existing power line conductors are grounded.
ii) No person in series with the potential electric circuit.
5) Prior to installation/removing dead
end jumper on structure earthing done
on both sides of the work and Yes/No
connected to structure.
6) Suspension clamps and dampers installed with in
36 hours after final connected to structure Yes/No
7) Center of the body (cushioned) and clamp
body of AGS clamp coincides with the Yes/No
armor rods, marked point on the conductor.
8) No difference in length between the longest Yes/No
and shortest rod when applied not to
exceed 13 mm.
F) Conductor Fittings and Attachments
1) Spacers and dampers fixed immediately
but with in 24 hours of conductor
clamping as per manufactures recommendations. Yes/No

2)a) Whether spacer cars/cycles are fixed with meter


counters for measuring intra-spacing of spacers/
spacer dampers during placement and if no. Yes/No

b) How the distance between spacers/spacer


damper in measured. Yes/No

3) Vibration dampers for ground wire installed as


per manufactures recommendations immediately
but within 24 hours of clipping. Yes/No

4) Span marker on ground wire, if required,


installed on ground wire after clamping and
fixing of vibration dampers on the ground wire. Yes/No
66

G) Tower Hardware

1) Tower Hardware viz phase plates, number


plates, circuit plates, copper earthing bond,
phase plates and danger plate fixed Yes/No
as per approved drawing.

2) Anti-climbing devices fixed as per approved drg. Yes/No

3) Step bolts with 2 Nos. nuts and one spring Yes/No


washer fixed as per approved drawing.

Certificate: Stringing is completed in all respects.

FOR CONTRACTOR FOR TSTRANSCO

Signature……………………… Signature…………………………

Name…………………………… Name………………………………

Designation…………………… Designation………………………

Date………………………….. Date……………………………….
67

ANNEXURE CF I

DETAILS OF EARTHWIRE/CONDUCTOR

1) Make

2) Batch No.

3) Quantity and Location as per approved drum schedule.

Sl. Drum Length Length Pay Out Between Phase Wire No.
No No. Marked Pay From To Loc. No.
on Drum Out Loc.No.
(Km) (Km)

4) There is no damage to earthwire/conductor before or during stringing


standards are in perfect position.

FOR CONTRACTOR FOR TSTRANSCO

Signature……………………… Signature…………………………

Name…………………………… Name………………………………

Designation…………………… Designation………………………

Date………………………….. Date……………………………….
68

ANNEXURE CF II

DETAILS OF COMPRESSION TYPE MID SPAN JOINT FOR EARTHWIRE/


CONDUCTOR AND REPAIR SLEEVE FOR CONDUCTOR

1) Make

2) Batch No.

3) Quantity and Location as per approved drum schedule.

Sl. Between Loc No. Phase Wire No.


No

4) Dimension Recorded as per Annex………….

5) M.S. Joint has been provided at least 50 feet away from tower.

6) There is no M.S. Joint over Railway/River/Main Road crossing.

7) Not more than one M.S.Joint provided in one span for each
earthwire/conductor

8) Repair sleeve shall be used if number of damaged strands is not more


than 2 strands in outer layer of the conductor. No repair sleeve shall be
used in case of ground wire. If damage is in more than the permissible
strands, the damaged portion shall be removed and M.S. Joint provided.

FOR CONTRACTOR FOR TSTRANSCO

Signature……………………… Signature…………………………

Name…………………………… Name………………………………

Designation…………………… Designation………………………

Date………………………….. Date……………………………….
69

ANNEXURE CF III

RECORDS OF INSULATORS

1) Type Glass/porcelain, Suspension /Tension/Pilot.

2) Make

3) Batch No. and Month of Manufacture.

4) With/without zinc sleeve.

5) Electro Mechanical Strength.

6) Quantity and Location

Sl. Loc. Qty. Qty. in Ckt I Qty. in Ckt Ckt I Ckt II


No. No. as per II
specifi Phase Phase Jumper Jumper
cation (Conductor) (Conductor)
R Y B R Y B R Y B R Y B

7) Insulator Meggered at site with 5 KV Megger and results of


measurement.
8) Insulators are cleaned with soft cloth. Glazaing is proper. There is no
crack, scratch or white spot on its surface.
9) ‘R’ clips in insulators are fitted properly.

10) While hoisting, no damage caused to insulators.

FOR CONTRACTOR FOR TSTRANSCO

Signature……………………… Signature…………………………

Name…………………………… Name………………………………

Designation…………………… Designation………………………

Date………………………….. Date……………………………….
70
ANNEXURE CF IV

DETAILS OF HARDWARE FITTING

1) Make

2) Batch No.

3) Type of fitting-I/V Single/Double, Suspension/Tension.

4) Quantity and Location

Sl. Loc. No. of Fittings Ckt I Ckt II


No. No. Phase Phase Jumper Jumper
Ckt. I Ckt II
R Y B R Y B R Y B R Y B

5) All nuts/bolts properly tightened. Yes/No


6) All Components of fittings have been
provided as per approved drawings. Yes/No
Dimensions and galvanizing are OK.
Fitting is cleaned and there is no
damage to any component.
7) All spilt pins properly provided. Yes/No

8) In case of Tension fittings, dimensions


before and after compression recorded as
per Annex………… Yes/No

FOR CONTRACTOR FOR TSTRANSCO

Signature……………………… Signature…………………………

Name…………………………… Name………………………………

Designation…………………… Designation………………………

Date………………………….. Date……………………………….
71
ANNEXURE CF V

SAG MEASUREMENT FOR CONDUCTOR

1) Sag Board/dynamometer fixed between Loc No. and

2) Temperature ………………..oC

3) Measurement of Sag/Tension.

Item Phase/Wire As per Sag/Tension Actual Sag /Tension


No. Chart
Initial Final Initial Final
Sagging Sagging Sagging Sagging

Sag

Tension

4) During paying out/rough sagging, tension in conductor was as per


technical specifications (50% of sagging tension).

5) Calibration certification for dynamometer checked. Yes/No

6) Vertical clearance between top conductor and earth wire at minimum


clearance point along the span is indicated as---------------------------

FOR CONTRACTOR FOR TSTRANSCO

Signature……………………… Signature…………………………

Name…………………………… Name………………………………

Designation…………………… Designation………………………

Date………………………….. Date……………………………….
72
ANNEXURE CF VI

SUSPENSION/TENSION CLAMPS FOR EARTHWIRE

1) Make

2) Batch No.

3) Quantity and Location

Sl. No. Wire No. Loc.No. Remarks

4) All components of clamps have been provided as per approved drawings.


Dimensions and galvanizing are OK. Clamp is cleaned and there is not
damage to any component.

5) All Nuts & bolts have been properly tightened, to 5 Kg m torque.

6) Split pins have been properly fixed.

7) In case of tension clamp, dimensions before and after compression


recorded as per Annex…………….

FOR CONTRACTOR FOR TSTRANSCO

Signature……………………… Signature…………………………

Name…………………………… Name………………………………

Designation…………………… Designation………………………

Date………………………….. Date……………………………….
73

ANNEXURE CF VII

RECORDS OF V.D. FOR EARTHWIRE AND CONDUCTOR

1) Make

2) Batch No.

3) Quantity and Location

Sl. No. Fixed on Fixed on Loc.No. Phase/Wire No. of V.D.


Loc.No. (Right (Left side) No.
side)

4) All components of V.D. have been provided as per approved drawings.


Dimensions and galvanizing are OK. Clamp is cleaned and there is not
damage to any component including messenger wire.

5) All Nuts & bolts have been properly tightened, to 4 Kg m torque.

6) V.D. Fixed as per approved placement chart.

FOR CONTRACTOR FOR TSTRANSCO

Signature……………………… Signature…………………………

Name…………………………… Name………………………………

Designation…………………… Designation………………………

Date………………………….. Date……………………………….
74

ANNEXURE CF VIII

RECORDS OF LINE SPACER/SPACER DAMPER/JUMPER SPACER

1) Make

2) Batch No.

3) Quantity and Location

Sl. No. Span/Loc.No. Phase No.of spacer

4) All components of V.D. have been provided as per approved drawings.


Dimensions and galvanizing are OK. Clamp is cleaned and there is not
damage to any component including messenger wire.

5) All Nuts & bolts have been properly tightened, to 4 Kg m torque.

6) Spacer/Spacer damper Fixed as per approved placement chart.


(Copy enclosed.)

FOR CONTRACTOR FOR TSTRANSCO

Signature……………………… Signature…………………………

Name…………………………… Name………………………………

Designation…………………… Designation………………………

Date………………………….. Date……………………………….
75

ANNEXURE CF IX (1)

The Dimensions of Tension Clamp suitable for (Zebra) Moose (AAAC


Panther, ACSR Panther, AAAC Moose)

1) Loc.No.

2) Span……………………….Loc Nos…………………..to………………..

3) Approved Drg.No. EMI/DE/710LT4-31.77

4) Details of Dimensions

Steel Aluminum
Portion Portion
As per Drg. Actual As per Drg. Actual
Before Comp. After Comp. After Comp. Before After Comp. After Comp.
Comp
Outer C-C F-F Leng C-C F-F Leng Oute Le C-C F-F Lengt C-C F-F
Length dia th th r dia ngt h
h

Dead 30 21 ± 1 -- 20.2± 17.5 610 54± 64 53± 46±


End 0 0.5 ± 5 1 0 0.5 0.5
m 230 54± 53± 46±
Jumpe m 0.5 -- 0.5 0.5
r

C-C : Corner to Corner Distance


F-F : Face to Face Distance
For Jumper leg the dimensions before and after compression may be obtained
from the supplier and checked.
76

5) Bores in the sleeves are perfectly clean.

6) The following may be checked as per approved drawing.

a) Marking and cutting


b) Correct sizes of dies
c) Centering & fixing of sleeves
d) Fixing of all the components i.e., Aluminium end pipes, hole plugs
etc.
e) Compression of sleeves at specified pressure.

7) All the sharp edges have been filled after compression.

8) There is no crack, bend or any damage to joint after compression.

FOR CONTRACTOR FOR TSTRANSCO

Signature……………………… Signature…………………………

Name…………………………… Name………………………………

Designation…………………… Designation………………………

Date………………………….. Date……………………………….
77

ANNEXURE CF IX (2)

Dimensions for 7/3.66 mm GSS Earthwire Tension Clamp

1) Loc.No.

2) Span……………………….Loc Nos…………………..to………………..

3) Approved Drg.No. EMI/EWTA-27510 0-98


4) Details of Dimensions

Steel Aluminum
Portion Portion
As per Drg. Actual As per Drg. Actual
Before Comp. After Comp. After Comp. Before After Comp. After Comp.
Comp

Length Outer Leng C-C F-F Leng C-C F- Leng Oute Leng C-C F-F Lengt C-C F-F
dia th th F th r dia th h

Tensio 22 21 ± -- 20.2 ± 17.5 225 32± 250 29.4 25±


n 5 0.5 0.5 ± 0.5 ± 0.5
Clamp m 0.5 0.5
s m 21 ± 20.2± 17.5
0.5 0.5 ± 80 32± -- 29.4 25±
Jumpe 80 0.5 0.5 ± 0.5
r m 0.5

C-C : Corner to Corner Distance


F-F : Face to Face Distance
For Jumper leg the dimensions before and after compression may be obtained
from the supplier and checked.
78

5) Bores in the sleeves are perfectly clean.

6) The following may be checked as per approved drawing.

a) Marking and cutting


b) Correct sizes of dies
c) Centering & fixing of sleeves
d) Fixing of all the components i.e., Aluminium end pipes, hole plugs
etc.
e) Compression of sleeves at specified pressure.

7) All the sharp edges have been filled after compression.

8) There is no crack, bend or any damage to joint after compression.

FOR CONTRACTOR FOR TSTRANSCO

Signature……………………… Signature…………………………

Name…………………………… Name………………………………

Designation…………………… Designation………………………

Date………………………….. Date……………………………….
79

ANNEXURE CF IX (3)

The Dimensions of Mid Span Joints for Moose Conductors

1) Loc.No.

2) Span……………………….Loc Nos…………………..to………………..

3) Approved Drg.No. EMI/MCJC – 73531.77


4) Details of Dimensions

Steel Aluminum
Portion Portion
As per Drg. Actual As per Drg. Actual
Before Comp. After Comp. After Comp. Before After Comp. After Comp.
Comp
Outer Leng C-C F-F Leng C-C F- Leng Oute Leng C-C F-F Lengt C-C F-F
Length dia th th F th r dia th h

250 ± 5 21 ± 1 285 20.2 ± 17.5 735 54 ± 785 53 ± 46 ±


(ap 0.5 ± ±5 1 (ap 0.5 0.5
p 0.5 p
rox) rox)

C-C : Corner to Corner Distance


F-F : Face to Face Distance
For Jumper leg the dimensions before and after compression may be obtained
from the supplier and checked.
80

5) Bores in the sleeves are perfectly clean.

6) The following may be checked as per approved drawing.

a) Marking and cutting


b) Correct sizes of dies
c) Centering & fixing of sleeves
d) Fixing of all the components i.e., Aluminium end pipes, hole plugs
etc.
e) Compression of sleeves at specified pressure.

7) All the sharp edges have been filled after compression.

8) There is no crack, bend or any damage to joint after compression.

FOR CONTRACTOR FOR TSTRANSCO

Signature……………………… Signature…………………………

Name…………………………… Name………………………………

Designation…………………… Designation………………………

Date………………………….. Date……………………………….
81

ANNEXURE CF IX (4)

Dimensions for Repair sleeves for ACSR Moose Conductor

1) Loc.No.

2) Span……………………….Loc Nos…………………..to………………..

3) Approved Drg.No. EMI/RS – 30531.77

4) Details of Dimensions

As per Drg. Actual


Before Comp. After Comp. After Comp.
Length Outer Length C-C F-F Length C-C F-F
dia

C-C: Corner to Corner Distance


F-F: Face to Face Distance
82

5) Bores in the sleeves are perfectly clean.

6) The following may be checked as per approved drawing.


a) Marking and cutting
b) Correct sizes of dies
c) Centering & fixing of sleeves
d) Fixing of all the components i.e., Aluminium end pipes, hole plugs
etc.
e) Compression of sleeves at specified pressure.

7) All the sharp edges have been filled after compression.

8) There is no crack, bend or any damage to joint after compression.

FOR CONTRACTOR FOR TSTRANSCO

Signature……………………… Signature…………………………

Name…………………………… Name………………………………

Designation…………………… Designation………………………

Date………………………….. Date……………………………….
83

ANNEXURE CF IX (5)

Dimensions for Mid Span Joints for 7/3.15 mm GSS Earthwire

1) Loc.No.

2) Span……………………….Loc Nos…………………..to………………..

3) Approved Drg.No.

4) Details of Dimensions

Steel Aluminum
Portion Portion
As per Drg. Actual As per Drg. Actual
Before Comp. After Comp. After Comp. Before After Comp. After Comp.
Comp
Outer Leng C-C F-F Leng C-C F- Leng Oute Leng C-C F-F Lengt C-C F-F
Length dia th th F th r dia th h

C-C : Corner to Corner Distance


F-F : Face to Face Distance
84

5) Bores in the sleeves are perfectly clean.

6) The following may be checked as per approved drawing.

a) Marking and cutting


b) Correct sizes of dies
c) Centering & fixing of sleeves
d) Fixing of all the components i.e., Aluminium end pipes, hole plugs
etc.
e) Compression of sleeves at specified pressure.

7) All the sharp edges have been filled after compression.

8) There is no crack, bend or any damage to joint after compression.

FOR CONTRACTOR FOR TSTRANSCO

Signature……………………… Signature…………………………

Name…………………………… Name………………………………

Designation…………………… Designation………………………

Date………………………….. Date……………………………….
85

NAME OF THE DRUM SCHEDULE ERECTION UNIT DATE


CONTRACTOR (CONDUCTOR) SHEET NO.
(SHEET 1-A)
NAME OF THE LINE

SECTION From……………to………………

SECTIONAL LENGTH………………………

LOC.NO.
T.TYPE
SPAN

PHASE 0 0 0 0 0 0 0

0 0 0 0 0 0 0

0 0 0 0 0 0 0

0 0 0 0 0 0 0

0 0 0 0 0 0 0

0 0 0 0 0 0 0

0 0 0 0 0 0 0

SITE ENGINEER/TSTRANSCO SITE INCHARGE/SUPERVISOR


Sl.No.

Drum No.

Make
CONTRACTOR
NAME OF THE

NAME OF THE LINE

Length
(Mtrs.)

Phase
86

Paying out
between
(SHEET 1-A)

Locs
(CONDUCTOR)
DRUM SCHEDULE

Quantity
Consumed

Balance Bit
Length

Bit to be
used at
SHEET NO.

Remarks
ERECTION UNIT DATE
87

NAME OF THE DRUM SCHEDULE ERECTION UNIT DATE


CONTRACTOR (CONDUCTOR) SHEET NO.
(SHEET 1-A)
NAME OF THE LINE

SECTION From……………to………………

SECTIONAL LENGTH………………………

LOC.NO.
T.TYPE
SPAN

PHASE 0 0 0 0 0 0 0

0 0 0 0 0 0 0

Balance Bit
Consumed
Paying out
Drum No.

Remarks
Quantity

Bit to be
between

used at
Length

Length
(Mtrs.)
Sl.No.

Phase
Make

Locs

SITE ENGINEER/TSTRANSCO SITE INCHARGE/SUPERVISOR