Quality Assurance Plan
Quality Assurance Plan
Quality Assurance Plan
TELANGANA LIMITED
&
CHECK FORMATS
SUBSTATIONS CONSTRUCTION
INDEX
1. PREAMBLE 1
2. CLSSIFICATION OF FOUNDATIONS 3
5. REGISTERS
PREAMBLE
1. Check Survey
i) Verification of line deviation angle and bisection for proper location
of towers.
ii) Verification of meeting statutory clearances.
iii) Check spans on either side of the tower location.
iv) Mark distances and angles from angle point at 3 conspicuous
places to identify the angle point location in case of displacement
of angle point peg.
v) At peg marks GPS marking should be done. This ensures correct
position of peg even if it is removed, as the longitudes and latitudes
are recorded.
2. Soil Investigation
i) Identify 75 locations for performing SPT.
ii) SPT to be performed at all angle points, at locations where soil
strata changes, railway and national/state road crossings, power
line crossings and special locations limiting to the 75 locations as
provided in the contract.
iii) Instead of identify 75 locations, it is better to perform soil
investigation for every KM of soil. Investigation is done by way of
ERM method, time is saved and soil investigation can be done
without disturbing standing crops.
3. Pit Marking
i) Mark position of all the four pits on the ground as per pit marking
drawing for standard type of foundation and note levels of the
center of each leg pit w.r.t center peg of the tower.
ii) Assess volume of bench cutting or use of hill side extension
revetment if required and take approval of the Superintending
Engineer /Chief Engineer.
4. Foundation Classification
i) One of the foundation pit to be used as a trial pit and excavated as
per normal soil dry type foundation.
ii) Observe following for classification
- Type of cultivation surrounding tower and whether
encasement of stub required due to surface water.
- Type of strata and depth of each layer.
- Water table/level.
- Maximum water table in the near by village well.
(b) Where Hard rock is encountered form 1.5 m to 2.5 m below Ground Level
though Top layer is of normal soil
(c) Where chiseling, drilling and blasting is required for excavation.
Note – 3 While classifying foundation of Wet, Partially Submerged / Partially Black Cotton, Fully
Submerged / Black Cotton foundations mentioned above, the worst conditions may be considered
and not necessarily the conditions prevailing at the time of inspection. For instance, there are areas
where sub-soil water rises when canal water is let-out in the field raising sub-soil water to a
considerable degree. Similarly the effect of monsoon or when the nearby reservoirs are full should
be considered and not the conditions prevailing in open season or summer when work is carried
out normally. In all such cases, the Chief Engineer (Civil) shall personally inspect and certify the
requirement of higher classification on case to case basis.
4
Note – 4 For critical locations of cut-point / Angle Towers, the classification of Tower
Foundations may be at next higher type for ensuring safety of the transmission
line as likely to be subjected to variable forces from time to time on account of
change in season and climatic conditions. This shall be decided by the
concerned Superintending Engineer (Civil) on case to case basis on personal
inspection.
Note – 5 In case of highly collapsible & loose soils and river crossings, special design for
foundations are to be made by Civil Engineering Wing for adoption on case to
case basis.
Note –6 At locations subjected to water logging, particularly in paddy fields, ponds,
marshy areas, etc., the chimney of all stubs to be raised to 600 mm over the
normal chimney being adopted in other cases. This shall be done after complete
erection of towers as a separate item for identified locations.
5. Form Work
i) Recheck the depth of the pits w.r.t center peg level and pit
dimensions as per approved foundation classification.
ii) Check under cutting as per approved drawing.
iii) Position fully assembled and bolt tightened stub setting template
with supporting jacks placed on firm ground and level the
template.
iv) Check placing a green concrete block of thickness equal to the
clearance between the stub end and concrete to mitigate settling of
template.
v) Check height of template above the center peg level.
7. Reinforcement
9. Placing of Concrete
Ensure stripping formwork after about 24 hrs and check for any damage,
honey combing and do necessary rectification.
11. Back Filling
12. Curing
14. Formats & QAP is revised with reference to the discussions and the
revised formats & QAP are enclosed herewith. The Superintending
Engineers should get the formats printed and bounded as registers and
to ensure, they are distributed to Section Officer level.
15. All the foundation drawings, and other instructions shall be distributed
upto Section Officer level.
6
Category III : Use of improper grade / quality of raw material like H.B.G.
metal, water and sand for concreting, using clogged and / or lump / clotted
cement for concreting, not ensuring proper curing for foundation concrete, not
ensuring that all the members of the tower are placed in position and firmly fixed
with bolts and nuts immediately after erection of tower, not ensuring that Half
round seam welding of the nuts before stringing of the line.
(b) Check for profile levels and 100% DO Contractor Counter check and AEE/EE/
electrical clearances approval by SE
TSTRANSCO for
approval
© Check for span marking and 100% Technical specs IS:5613 Contractor Counter check and EE/SE
lengths and other relevant standards approval by
Apprd. Profile drgs. Tower TSTRANSCO
schedule, tower spotting
data.
(d) Check for tower type& 100% DO Contractor Counter check and EE/SE
position as per site condition approval by
TSTRANSCO
(e) Estimation of benching 100% Technical specification Contractor Counter check and Benching
&Revtment volumes (as per IS:5613 and other relevant approval by by EE/Field
site conditions) standards Apprd. Tower leg CE/400KV/L&SS/ Revetment
location counters, approved TSTRANSCO by SE
profile
(f) Final Profile & tower 100% Modified profile drawing and Contractor Counter check and EE/SE/CE
schedule amended tower schedule approval by
TSTRANSCO
8
Sl. Component Sampling Reference Documents Testing Agency Remarks Checking
No Operation & Plan with and Authority
. Description of Test Basis Acceptance
3 Soil Investigation
A At Normal Locations
(i) Borelog/Trial Pit for obtaining At locations Technical specification Contractor/ Counter check and AEE/EE/ SE
details/types of soil as indicated IS:1498, TSTRANSCO approval by
encountered. Including by 1892, 2720, 4464, 6935, SP- approved TSTRANSCO The
TSTRANSC 36 Agency
gradation of samples at O locations are to be
specified levels, ground water & and other relevant identified and
standards
levels etc. (at center of tower) approved by
TSTRANSCO
before carrying out
soil investigation
B Soil Resistivity One Location in IS:2131, IS 2720 and Contractor Counter check EE/SE
a stretch of 2 to Technical TSTRANSCO and approval by
3 Specifications approved TSTRANSCO
Km or at agency
locations
approved
by
TSTRANS
CO
C Test on Soil and Rock Approval by
Samples TSTRANSCO
C1 Test on soil samples
i Visual and DO Technical specification AEE/EE/
Engineering IS:5613, IS:1498 and other SE
classifications relevant specifications
5 Checking of Foundation
Materials
A Cement Supply source to
be approved by
TS Transco
(i) Fineness For each TSTRANSCO Technical Manufacturer Review and AEE/EE/ SE
source MTC specification IS:269, 456, works/ approval of
shall be 1489, TSTRANSCO manufacturers test
furnished for 4031, 8112, 12269 and approved test certificates
every lot of other relevant standards lab/ contractor (MTCS)/laboratory
200 test results by
MTs and TSTRANSCO
part thereof
Sl. Component Operation & Sampling Plan Reference Documents and Testing Agency Remarks Checking
No. Description of Test with Basis Acceptance Norms Authority
B Coarse Aggregates One sample Technical specification IS TSTRANSC Each source will be AEE/EE/
per lot of :383, IS:2386 and IS:2430 O Approved approved by SE
200Cum or & other relevant standards Lab TSTRANSCO
part per each review and
source for acceptance of test
each size` result by TSTransco
(i) Determination of Particle size One sample Technical specification IS Contractor/ Each source to AEE/EE/
(sieve analysis) per lot of :383, IS:2386 and other TSTRANS be approved by SE
200Cum or relevant standards CO TSTRANSCO
part per each approved
source lab
(ii) Flackiness Index DO Technical specification IS Contractor/ DO AEE/EE/
:383, IS:2386 and other TSTRANS SE
relevant standards CO
approved
lab
(iii) Crushing Valve DO Technical specification IS Contractor/ DO AEE/EE/
:383, IS:2386 and other TSTRANS SE
relevant standards CO
approved
lab
(iv) Specific gravity DO DO DO DO DO
v) Bulk Density DO DO DO DO DO
vi) Absorption Value DO DO DO DO DO
vii) Moisture Content DO DO DO DO DO
viii) Presence of DO DO DO DO DO
deleterious materials
C) Fine Aggregates One sample Technical specification IS Contractor/ Each source will AEE/EE/
per lot of :236, TSTRANS be approved by SE
200Cum or 383, 456, 2386, 2430 and CO TSTRANSCO
other relevant standards approved
part per each lab
source
(i) Gradation/ Determination of DO Technical specification IS Contractor/ Each source tol be AEE/EE/
Particle Size (Sieve analysis) :236, TSTRANS by review and SE
383, 456, 2386, 2430, 4031 CO acceptance of test
and other relevant standards approved result by
lab
TSTRANSCO
v) Bulk Density DO DO DO DO DO
vi) Presence of DO DO DO DO DO
deleterious materials
D) Water
(i) Suitability (Potable One sample Technical specification IS Contractor Each source to AEE/EE
water is considered for source 456, IS:3025 and other be approved by
suitable for concreting) relevant standards TSTRANSCO
Sl. Component Operation & Sampling Plan Reference Documents and Testing Agency Remarks Checking
No. Description of Test with Basis Acceptance Norms Authority
(ii) Strength (Tensile test, For steel as per DO Contractor/ DO AEE/EE/
Yield stress/proof stress) IS 1786 under TSTRANS SE
10mm one CO
sample per approved
each
25 MT or part lab
thereof 10mm-
iii) Percentage elongation 16mm one DO DO DO AEE/EE/
sample per SE
each
iv) Bend Rebend Test 35 MT or part Technical specification IS: Contractor/ DO AEE/EE/
thereof. Over 432, TSTRANS SE
16 mm 1 1139, 1786 2502 and CO
sample per other relevant standards approved
each 45 MT lab
or part
v) Reverse bend test for thereof. IS:432, and other Contractor/ DO EE/SE
HDS Wires approved specification TSTRANSCO
approved test
lab
vi) Chemical analysis test One sample IS:432, IS:1139, IS:1786 Contractor/ DO AE/EE/SE
per source and specification TSTRANSCO
approved test
lab
F Earthing material
(i) Visual identification 100% Technical specification IS: Contractor Approval by CE/Const.
5613 and other relevant TSTRANSCO
standards
(ii) Bill of material & installation 100% Technical specification Contractor DO EE/SE
approved drawings & IS
5613
6 Tower Excavation
A) Before Excavation
(a) Checking of pegs condition 100% Every Approved line Contractor Counter check AE/AEE
as per line alignment Location alignment/profiles and approval by
Tech. Specification. IS 4091, TSTRANSCO
5613, CBI & P Publication
No.268 and other
relevant standards
(b) Checking of pit marking as 100% Every Technical specification, Contractor Counter check AE/AEE
per drawing and RI Location IS:4091, 5613 & other and approval by
relevant standards TSTRANSCO
Approved, profile
excavation and foundation
drawings
(h) Benching (Where required) Where required Technical specification IS Benching Approval by AE/AEE
5613, approved Foundation implement TSTRANSCO
leg contour Profiles and s/
other relevant standards Contractor
B Excavation
(a) Dimensional conformity Each Location Technical specifications Pit excavation Approval by AE/AEE
IS:3764, 408, 4091 &5613, tools/ TSTRANSCO
SP:16 and other relevant contractor
standards Approved
excavation Drgs./
Specification
11
Sl. Component Operation & Sampling Plan Reference Documents and Testing Agency Remarks Checking
No. Description of Test with Basis Acceptance Norms Authority
(b) Verticality & squareness of Each Location Technical specification IS: Joint inspection Approval by AE/AEE
each pit 3764 by TSTRANSCO
TSTRANSCO
(d) Shoring and Strutting As required Technical specification Steel sheets, Coutner check by AE/AEE/ EE
(Check durability strength & applicable state/ local wooden TS Transco
soundness of staging, fonts body safety regulations planks stuts
adequacy and specific etc/
livels) contractor
(e) Dewatering (Where required) As required Tech. Specification. IS:456 Diesel Coutner check by AE/AEE
and other relevant engine TS Transco
standards pumps. Etc.
contractor
C) Stub & Template
(a) Identification & Assembly 100% Every Technical specification IS: Stub template, Counter check by AE/AEE
Location 5613. Approved drawings water level TSTRANSCO
of stub template and tapes, sand
foundation bags, Jacks
drawing
etc/ Contractor
(a) Control, Concrete mixed Technical specification IS Joint Counter check AE/AEE/
design 456 and other relevant inspection and approval by EE
standards & approved TSTRANSCO TSTRANSCO
drawings & contractctor
(i) Identification of material 100% Technical specification IS Contractor Counter check AE/AEE/ EE
and water supply 383,456 IS:3025, 3550 and approval by
sources and other relevant TSTRANSCO
standards
Sl. Component Operation & Sampling Plan Reference Documents and Testing Agency Remarks Checking
No. Description of Test with Basis Acceptance Norms Authority
(iii) Preperation of mix and 100% Technical specification IS Contractor/ Counter check of AE/AEE/
taking of samples for 456 and other relevant TSTRANSC test results and EE
strength (7days, 14 days & standards O approved approval by
28 days ) and slump report test TSTRANSCO
laboratory
(e) Placing of concrete and DO Technical specification IS Poking rods and DO AE/AEE
Ramming 456, IS:5613 and other concrete
relevant standards vibrator.
Approved
concrete design
mix report/
Contractor
F) Box removal check for 100% Technical specification IS TSTRANSCO Reinforcement rods AE/AEE
dimensional conformity 456, and other relevant & Contractor should not be
and workmanship standards appoved Drgs. exposed Boxes
should not be
opened after 24
hours. Approval by
TSTRANSCO
13
Sl. Component Operation & Sampling Plan Reference Documents and Testing Agency Remarks Checking
No. Description of Test with Basis Acceptance Norms Authority
G) Backfilling 100% all Technical Specification/IS: Contractor Boulders of size AE/AEE/
Locations 5613, and other relevant more than 80mm EE
standards Boulder size 80 should not be
mm allowed for
(Max)
backfilling, sufficient
water should be
poured and
rammed for every
200mm layer of
earth, 100mm
height earthen
bund along with
the side of
excavation for
filling water
H) Coping and Curing 100% Technical Specification Contractor At locations in the AE/AEE
IS:5613, and other relevant paddy fields or in
standards the low lying
and approved drawing
areas, the
chimney is to be
extended as per
AP Transco
Approved drawing.
The corner
reinforcement rods
200 mm below the
final chimney level
to
be left un
concerted and the
extensions of
chimney for this
portion and
coping shall be
done after
tower erection.
Curing should be
continued
for minimum 15
days.
I) Laying of Earthing (Pie or 100% all Technical specification IS Joint inspection Earthing type will AE/AEE
Counterpoise type). (Based Locations 3403 by be decided by
on measurement of soil TSTRANSCO & TSTRANSCO
resistivity/ tower contractor
footing resistance)
6 Concrete Cubes Testing 100% one Technical specification. IS contractor/. Cubes mut be AE/AEE/ EE
A) sample for each 456, Approved tested within a week
location (One 516, 1199 and other laboratory by of 20 days curing
sample consists relevant standards TSTRANSC period and tests
of min 4 test O Standard results should be
cubes for 28 Cube Moulds approved before
days strength tower erection by
TSTRANSCO
a) Degree of compaction 1 test per 2000 IS: 2720 (Par-28) Contractor / Review and SE/EE
Sq.m area approved acceptance of
testing LAB by test results by
TSTRANSCO TSTRANSCO
D) Roads
a) Aggregate impact value 1 test per 250 IS: 2386 (Part-4) Contractor / Contractor / SE
Cum approved approved testing
testing LAB by LAB by
TSTRANSCO
TSTRANSCO
b) Grading of aggregate 2 tests per 250 IS: 2386 (Part-1) ……..do…….. ……..do…….. SE
and screening Cum
c) Flakiness index and 1 test per 250 IS: 2386 (Part-1) ……..do…….. ……..do…….. SE
elongation index Cum
A) Material Checking
8 Line Stringing
A) Stringing (Sag 100% Technical Contractor Approval by AE/
Tension) chart Specification TSTRANSCO AEE/
IS:5613, Sag EE
Tension
calculations and
stringing chart
approved by
TSTRANSCO
B) Checking of 100% Technical Joint Approval not - do-
insulators Specification inspection by necessary
identification IS:731,5613,IEC TSTRANSCO
cleanliness 383 and other & contractor
packing glazing relevant
cracks & white standards
spots, security approved sag
clips tension
calculation and
approved
stringing chart
Note:
1. Route Plan, approved profiles, approved tower schedule sag
template etc will be made available by the purchaser if the
detailed survey is already carried out by the Purchaser
2. At the time of receipt of material i.e., Tower parts,
Conductors, Hardware fitting accessories, insulators
earthwire etc. TS Transco clearance may be verified by
contractor.
3. TSTRANSCO site office Engineers/Field quality Engineers to
witness/review specified tests.
4. The T & P of the erection contractor shall be inspected at site
by the TSTRANSCO before their use.
GENERAL GUIDE LINES FOR IMPLEMENTATION
22
11 CEMENT
11.1 In case supply of cement is in the scope of the contractor, the same shall
be procured from sources approved by TSTRANSCO site and got tested at
site on sample basis for specified acceptance tests as specified in this
FQP at a reputed Third Party Lab approved by TSTRANSCO site.
11.2 The samples of cement for site testing shall be taken within three weeks
of the delivery and all the tests shall be commenced within one week of
sampling.
12.1 In case supply of reinforcement steel is in the scope of the contractor, the
same shall be procured from the main producers i.e., SAIL, TISCO,
HSCO or Rashtriya Ispat Nigam or the recollers approved by main
procedures. The reinforcement steel shall be got tested at site on sample
basis for specified acceptance tests as specified in this FQP at a reputed
Third Party Lab approved by TSTRANSCO site.
12.2 The result of the testing of cement and reinforcement steel referred to in
13.1 and 14.1 above shall be got approved from TSTRANSCO site before
cement and reinforcement steel are put to use. However, in exceptional
cases due to exigencies of work. TSTRANSCO site may authorize the
contractor to use Cement and Reinforcement Steel even before the test
results are received. However, in all such cases, if the test results
subsequently received are found to be not complying with the specified
acceptance criteria, the contractor shall have to dismantle and recase all
such foundations cast with such non-conforming materials at his own
cost. Confirmation to this effect shall be obtained from the contractor by
the Project authorities beforehand in all such cases.
13. All the testing and measuring equipments used by the contractor for
testing are required to be calibrated. A copy of valid calibration report
shall be retained by TSTRANSCO as records.
14. Calibration certificates to be got verified from TSTRANSCO for tools and
plants and testing equipment before their use.
23
TOWER FOUNDATION
1. CHECK SURVEY
viii) Angle of deviation and bisection at tower loc. As per profile Actual
a) Angle of deviation
b) Bisection
Signature……………………… Signature…………………………
Name…………………………… Name………………………………
Designation…………………… Designation………………………
Date…………………………….. Date……………………………….
24
2. PIT MARKING
iv) Position of leg pegs w.r.t center peg of tower O.K./NOT O.K.
Signature……………………… Signature…………………………
Name…………………………… Name………………………………
Designation…………………… Designation………………………
Date…………………………….. Date……………………………….
25
FOUNDATION CLASSIFICATION
--------------- -----------------
--------------- -----------------
--------------- -----------------
--------------- -----------------
--------------- -----------------
--------------- -----------------
--------------- -----------------
--------------- SENDING END -----------------
a) Predominant soil
ii) Sub soil water table details as on date.
---------------
---------------
---------------
---------------
Remarks/Reason:- …………………………….
…………………………….
FOR CONTRACTOR FOR TSTRANSCO
Signature……………………… Signature…………………………
Name…………………………… Name………………………………
Designation…………………… Designation………………………
Date…………………………….. Date……………………………….
Approval
FOR TSTRANSCO
Signature…………………………
Name………………………………
Designation………………………
Date……………………………….
27
4. STUB SETTING
i) Approved drg.Nos.
Pit A
Pit B
Pit C
Pit D
a) Tangent Tower
a.a) In the direction of line Yes/No
b) Angle Tower
b.a) Angle of deviation ….degrees
b.b) Alignment of template on bisection Yes/No
iv) Diagonals of template
AC…….m
BD…….m
=Angle of Deviation.
PQ=Line of Bisection.
(Lines AD and BC are
perpendicular to PQ)
28
Signature……………………… Signature…………………………
Name…………………………… Name………………………………
Designation…………………… Designation………………………
Date…………………………….. Date……………………………….
29
Availability check of :
i) leveling instruments
ii) Theodo …………
iii) sieves 0.15, 0.3, 0.6, 1.18, 2.36, 4.75, 10,12,20 mm
iv) screw gauge
v) slump cone
vi) No. of cubes cost
5. CONSTRUCTION OF MATERIALS
Name of Line:- Location No.:-
Name of Contractor:- Type of tower:-
i) Quality /Qty. of Cement as per approved Drgs./Specifications/
Agreement /Booklet on Guidelines on Implementation of QAP
Signature……………………… Signature…………………………
Name…………………………… Name………………………………
Designation…………………… Designation………………………
Date…………………………….. Date……………………………….
32
i) Apprd.Drg.Nos. ----------------------------
----------------------------
Signature……………………… Signature…………………………
Name…………………………… Name………………………………
Designation…………………… Designation………………………
Date…………………………….. Date……………………………….
33
i) Apprd.Drg.Nos. ----------------------------
xiii) Cubes, last sent for testing as per approved FQP Yes/No
Signature……………………… Signature…………………………
Name…………………………… Name………………………………
Designation…………………… Designation………………………
Date…………………………….. Date……………………………….
35
Name of work :
Agreement No. :
Sample No. :
Identification Mark :
Proportion of Mix :
7 days 28 days
Date…………………………. Date………………………….
36
(A) CEMENT
Date…………………………. Date………………………….
iv) Coarse aggregate-Flake ness, soft slice and laminar shape Yes/No
Date…………………………. Date………………………….
37
ii) Dimensions and nos of the reinforcement bars and rigs Yes/No
Date…………………………. Date………………………….
38
DATE. DATE……………….
DATE…………………..
CEMENT REGISTER
41
(A) CEMENT
Date…………………………. Date………………………….
COARSE/FINE AGGREGATE REGISTER
43
Approved SFQP
Date of Receipt
Signature
Bags/MT
Sl.No
Date
Note: (1) MTC shall be available for every 200 MT or part thereof
(2) Lab Test Report shall be available for every 200 MT or part thereof
44
2. Source of supply :
The samples have been sealed and one identification mark slip duly signed her
been placed inside the bag & another slip duly signed has been placed on the
bag.
Date………………………………… Date…………………………………
45
Note: Latest values may be seen by referring the latest IS code as amended.
46
Date………………………………… Date…………………………………
47
Loc No.
Type of
Date of
Sl No
Commutative
Commutative
Commutative
TSTRANSCO
Consumed
Consumed
Consumed
Erection
Agency
MT
MT
MT
Note: One sample per lot of 200 MT or part there of (each for 40 mm, 20 mm
metal and sand)………………………………Date of sampling and test report
reference to be recorded in this format.
48
The sample of coarse line aggregate as per the following details have been
collect ………………………..
40 mm ………………
20 mm ………………
The samples have been sealed and identification mark slip duly signed has
been placed inside the bag & another slip duly signed has been pasted on the
bags.
Date………………………………… Date…………………………………
49
Note: Latest values may be seen by referring the latest IS code as amended.
Date:…………………….. Date……………………….
Date:…………………………..
REINFORCEMENT STEEL REGISTER
51
REINFORCEMENT STEEL
Date………………………………… Date…………………………………
52
S.No. Date of Grade/ty Diamet Quantity received Manufactur TSTRANSCO Test Signa
Receipt pe & Lot er er’s Test Approved Lab Results ture
No. Qty. Cum Certificate test Report are As per
Regd.in Qty.MT No. & date No. & date Approved
Lot SFQP
(MT)
Note: MTC and TSTRANSCO approved lab test report shall be available as per
approved SMQP.
53
The samples of reinforcement steel as per the following details have been
collected jointly by us:
The samples have been wrapped together & placed inside the bag. One
identification mark slip duly signed the bag & another slip duly signed has
been pasted on the bag.
Date………………………………… Date…………………………………
54
Note: Latest value may be seen by referring the latest IS code as amended.
Date:…………………….. Date……………………….
Sample is approved
Name of work :
Agreement No. :
Sample No. :
Identification Mark :
Proportion of Mix :
7 days 28 days
Official) Date…………………………………..
Date……………………………………..
57
TOWER ERECTION
Approved Drg.No:-
Certificate: Tower erection is complete in all respects and footing resistance is within
permissible limit.
Name…………………………… Name………………………………
Designation…………………… Designation………………………
Date…………………………….. Date……………………………….
59
TOWER ACCESSORIES
Approved Drg.No:-
Signature……………………… Signature…………………………
Name…………………………… Name………………………………
Designation…………………… Designation………………………
Date…………………………….. Date……………………………….
60
Approved Drg.No:-
Signature……………………… Signature…………………………
Name…………………………… Name………………………………
Designation…………………… Designation………………………
Date………………………….. Date……………………………….
61
Approved Drg.No:-
Signature……………………… Signature…………………………
Name…………………………… Name………………………………
Designation…………………… Designation………………………
Date………………………….. Date……………………………….
62
STRINGING
6) Necessary Protection/scaffolding /
warning signals provided for Railway/ Yes/No
Power line/P&T line/Road crossing.
E) Dead Ending
G) Tower Hardware
Signature……………………… Signature…………………………
Name…………………………… Name………………………………
Designation…………………… Designation………………………
Date………………………….. Date……………………………….
67
ANNEXURE CF I
DETAILS OF EARTHWIRE/CONDUCTOR
1) Make
2) Batch No.
Sl. Drum Length Length Pay Out Between Phase Wire No.
No No. Marked Pay From To Loc. No.
on Drum Out Loc.No.
(Km) (Km)
Signature……………………… Signature…………………………
Name…………………………… Name………………………………
Designation…………………… Designation………………………
Date………………………….. Date……………………………….
68
ANNEXURE CF II
1) Make
2) Batch No.
5) M.S. Joint has been provided at least 50 feet away from tower.
7) Not more than one M.S.Joint provided in one span for each
earthwire/conductor
Signature……………………… Signature…………………………
Name…………………………… Name………………………………
Designation…………………… Designation………………………
Date………………………….. Date……………………………….
69
ANNEXURE CF III
RECORDS OF INSULATORS
2) Make
Signature……………………… Signature…………………………
Name…………………………… Name………………………………
Designation…………………… Designation………………………
Date………………………….. Date……………………………….
70
ANNEXURE CF IV
1) Make
2) Batch No.
Signature……………………… Signature…………………………
Name…………………………… Name………………………………
Designation…………………… Designation………………………
Date………………………….. Date……………………………….
71
ANNEXURE CF V
2) Temperature ………………..oC
3) Measurement of Sag/Tension.
Sag
Tension
Signature……………………… Signature…………………………
Name…………………………… Name………………………………
Designation…………………… Designation………………………
Date………………………….. Date……………………………….
72
ANNEXURE CF VI
1) Make
2) Batch No.
Signature……………………… Signature…………………………
Name…………………………… Name………………………………
Designation…………………… Designation………………………
Date………………………….. Date……………………………….
73
ANNEXURE CF VII
1) Make
2) Batch No.
Signature……………………… Signature…………………………
Name…………………………… Name………………………………
Designation…………………… Designation………………………
Date………………………….. Date……………………………….
74
ANNEXURE CF VIII
1) Make
2) Batch No.
Signature……………………… Signature…………………………
Name…………………………… Name………………………………
Designation…………………… Designation………………………
Date………………………….. Date……………………………….
75
ANNEXURE CF IX (1)
1) Loc.No.
2) Span……………………….Loc Nos…………………..to………………..
4) Details of Dimensions
Steel Aluminum
Portion Portion
As per Drg. Actual As per Drg. Actual
Before Comp. After Comp. After Comp. Before After Comp. After Comp.
Comp
Outer C-C F-F Leng C-C F-F Leng Oute Le C-C F-F Lengt C-C F-F
Length dia th th r dia ngt h
h
Signature……………………… Signature…………………………
Name…………………………… Name………………………………
Designation…………………… Designation………………………
Date………………………….. Date……………………………….
77
ANNEXURE CF IX (2)
1) Loc.No.
2) Span……………………….Loc Nos…………………..to………………..
Steel Aluminum
Portion Portion
As per Drg. Actual As per Drg. Actual
Before Comp. After Comp. After Comp. Before After Comp. After Comp.
Comp
Length Outer Leng C-C F-F Leng C-C F- Leng Oute Leng C-C F-F Lengt C-C F-F
dia th th F th r dia th h
Signature……………………… Signature…………………………
Name…………………………… Name………………………………
Designation…………………… Designation………………………
Date………………………….. Date……………………………….
79
ANNEXURE CF IX (3)
1) Loc.No.
2) Span……………………….Loc Nos…………………..to………………..
Steel Aluminum
Portion Portion
As per Drg. Actual As per Drg. Actual
Before Comp. After Comp. After Comp. Before After Comp. After Comp.
Comp
Outer Leng C-C F-F Leng C-C F- Leng Oute Leng C-C F-F Lengt C-C F-F
Length dia th th F th r dia th h
Signature……………………… Signature…………………………
Name…………………………… Name………………………………
Designation…………………… Designation………………………
Date………………………….. Date……………………………….
81
ANNEXURE CF IX (4)
1) Loc.No.
2) Span……………………….Loc Nos…………………..to………………..
4) Details of Dimensions
Signature……………………… Signature…………………………
Name…………………………… Name………………………………
Designation…………………… Designation………………………
Date………………………….. Date……………………………….
83
ANNEXURE CF IX (5)
1) Loc.No.
2) Span……………………….Loc Nos…………………..to………………..
3) Approved Drg.No.
4) Details of Dimensions
Steel Aluminum
Portion Portion
As per Drg. Actual As per Drg. Actual
Before Comp. After Comp. After Comp. Before After Comp. After Comp.
Comp
Outer Leng C-C F-F Leng C-C F- Leng Oute Leng C-C F-F Lengt C-C F-F
Length dia th th F th r dia th h
Signature……………………… Signature…………………………
Name…………………………… Name………………………………
Designation…………………… Designation………………………
Date………………………….. Date……………………………….
85
SECTION From……………to………………
SECTIONAL LENGTH………………………
LOC.NO.
T.TYPE
SPAN
PHASE 0 0 0 0 0 0 0
0 0 0 0 0 0 0
0 0 0 0 0 0 0
0 0 0 0 0 0 0
0 0 0 0 0 0 0
0 0 0 0 0 0 0
0 0 0 0 0 0 0
Drum No.
Make
CONTRACTOR
NAME OF THE
Length
(Mtrs.)
Phase
86
Paying out
between
(SHEET 1-A)
Locs
(CONDUCTOR)
DRUM SCHEDULE
Quantity
Consumed
Balance Bit
Length
Bit to be
used at
SHEET NO.
Remarks
ERECTION UNIT DATE
87
SECTION From……………to………………
SECTIONAL LENGTH………………………
LOC.NO.
T.TYPE
SPAN
PHASE 0 0 0 0 0 0 0
0 0 0 0 0 0 0
Balance Bit
Consumed
Paying out
Drum No.
Remarks
Quantity
Bit to be
between
used at
Length
Length
(Mtrs.)
Sl.No.
Phase
Make
Locs