Center Line Plan
Center Line Plan
Center Line Plan
37'-3"
1
32'-52"
COLUMN CENTER LINE
26'-6"
A B C D E F
15'-9"
1 16'-6" 15'-7"
4' 22" 1
10'-62" 5'-11" 4'-10" 10'-9"
1 1
4'
C1 C1
C1
GENERAL NOTES:-
C3
1- READ ALL STRUCTURAL DRAWINGS IN CONJUNCTION WITH
12'
12'
ARCHITECTURAL & SERVICES DRAWINGS.
16'-9"
2- ALL FOUNDATION SHALL REST ON FIRM AND VIRGIN SOIL.
C2 POCKETS OF LOOSE SOIL IF ENCOUNTERED SHALL BE
REMOVED AND REPLACED WITH SUITABLE SOIL.
C1
3- ALL STRUCTURE CONCRETE IN FOUNDATION, COLUMN
2 2
26'-4"
UNDER GROUND WATER TANKS SHALL BE WITH MINIMUM
4'-9"
4'-9"
22"
1
CYLENDRICAL STRENGTH OF 4000psi AT 28 DAYS
C1 4- ALL CONCRETE OTHER THAN MENTIONED ABOVE IN NOTE 3 SHALL
34'-6"
3 3
BE WITH MIN. 28 DAYS CYLENDRICAL STRENGTH STRENGTH
14'-4"
OF 3.000 psi.
22"
1
C2 5- FOUNDATION DESIGN IS BASED ON SAFE ALLOWABLE
42'-32"
1
1
9'-7"
44'-8"
6- SULPHATE RESISTANT CEMENT SHALL BE USED IN ALL
C2 CONCRETE WORKS UPTO PLINTH.
17'-9"
C1
7- ALL REINFORCING BARS SPECIFIED BY .NO.(#) SHALL BE
55'-02"
4 4
1
COLD WORKED RIBBED TOR STEEL OR DEFORMED BARS
WITH MIN. YEILD STRENGTH OF 60,000 PSI.
2"
22"
1 8- ALL REINFORCING BARS SPECIFIED BY DIAMETER (Ø) SHALL
8'-2"
C3
BE PLAIN MILD STEEL WITH MIN. YEILD STRENGTH
C1 OF 36,000 PSI.
15'-112"
1
22"
1
C2 FOUNDATION: 3" TO MAIN REINF.
7'-92"
1
10'-2"
WALLS : 1½" TO MAIN REINF. AT EARTH SIDE
1" TO MAIN REINF. AT INNER SIDE
C2 C2
SLABS/STAIRCASES: 3/4" TO MAIN REINF.
6 6
BEAMS: 1½" TO STIRRUPS AT TOP & BOTTOM
7 7
10'-42"2'-42"
1
C2 C2
10'-2"
1
22"
1
A B C D E F T : TOP
B : BOTTOM
26'-6" EF : EACH FACE
1 NSE : NOT SHOWN IN ELEVATION
32'-52"
NSP : NOT SHOWN IN PLAN
37'-3" BL : BOTTOM LEVEL OF FOUNDATION
48'