ANNEX C. Storey BLK Classroom Structural and Architectural Drawings
ANNEX C. Storey BLK Classroom Structural and Architectural Drawings
ANNEX C. Storey BLK Classroom Structural and Architectural Drawings
03 LEGEND:
A. BRC MESH REF. A142
38,900 B. 150mm THK. GROUND FLOOR
C. CONCRETE SLAB 1000g POLYTHENE D.P.M. D.
0.200 8,250 0.200 8,250 0.200 4.700 0.200 8,250 0.200 8,250 0.200
50mm THK. QUARRY DUST BLINDING
E. MINIMUM 200mm THICK HARDCORE
F. SELECTED BACKFILL MATERIAL
G. 50mm THK. CONCRETE BLINDING. H.
20mm MASTIC ASPHALT TANKING
I. 100mm THK BLOCKWORK SKIN WALL C.J.
0.
CONTRACTION JOINT
E.J. EXPANSION JOINT
9
6
ISOLATION JOINT
5 D.O.S DETERMINE ON SITE.
Elevation
East
West
1.800
0.
RAMP
CLIENTS SIGNATURE
ARCHITECT
STRUCTURALCIVIL ENGINEERS
0
0
FLOOR PLANS
DRG TITLE
JOB No DRG No
DRAWN S.O A D
01
CHECKED B E
FIRST FLOOR PLAN
LEGEND:
A. BRC MESH REF. A142
B. 150mm THK. GROUND FLOOR
C. CONCRETE SLAB 1000g POLYTHENE D.P.M. D.
50mm THK. QUARRY DUST BLINDING
E. MINIMUM 200mm THICK HARDCORE
F. SELECTED BACKFILL MATERIAL
G. 50mm THK. CONCRETE BLINDING. H.
20mm MASTIC ASPHALT TANKING
I. 100mm THK BLOCKWORK SKIN WALL C.J.
CONTRACTION JOINT
E.J. EXPANSION JOINT
RWDP RAIN WATER DOWN PIPE I.J.
ELEVATION 01 ISOLATION JOINT
D.O.S DETERMINE ON SITE.
ELEVATION 02 ELEVATION 03
2.
0.
PROJECT: PROPOSED STOREY BLD CLASSROOM BLOCKS
3.
0.
CLIENT: UNHCR RWANDAMIDIMAR
2.
0.
ELEVATION 03 CLIENTS SIGNATURE
ARCHITECT
STRUCTURALCIVIL ENGINEERS
GROUND FLOOR
DRG TITLE
ELEVATIONSROOF PLAN
0
0
JOB No DRG No
DRAWN S.O A D
CHECKED B E
ROOF PLAN
SCALE DATE: Oct 2017
1:100 C F
01
NOTE:
CONTRACTOR TO PROPOSE CONSTRUCTION JOINT LAYOUT FOR
ENGINEERS APPROVAL, MAXIMUM SPACING IN EACH DIRECTION TO BE
4.5m
A B C D E F G H I J
LEGEND:
A. BRC MESH REF. A142
B. 150mm THK. GROUND FLOOR
C. CONCRETE SLAB 1000g POLYTHENE D.P.M.
D. 50mm THK. QUARRY DUST BLINDING
E. MINIMUM 200mm THICK HARDCORE
4,225 4,225 4,225 4,225 4900 4,225 4,225 4,225 4,225
F. SELECTED BACKFILL MATERIAL
G. 50mm THK. CONCRETE BLINDING.
H. 20mm MASTIC ASPHALT TANKING
I. 100mm THK BLOCKWORK SKIN WALL
C.J. CONTRACTION JOINT
E.J. EXPANSION JOINT
RWDP RAIN WATER DOWN PIPE
I.J. ISOLATION JOINT
D.O.S DETERMINE ON SITE.
3
7
5
3
7
5
2
0
0
1
6
6
CLIENTS SIGNATURE
ARCHITECT
A C C C C C
70Y8-01-150
6
0
0
01 01
6
0
0
6
0
0
70(01) 33(01) 70(01) 70(01)
4(02)
4(02)
1 4Y32-02 4Y32-02 2 SEC 1-1 SEC 2-2
Beam 02
DRG TITLE
GROUND FLOOR
General Arrangement Layout & Sectional Details
A B C C C C C C C C
3Y16-03
1
3Y16-03 200
2 3(03)
200
1
3
0
3(03)
6
0
0
35Y8-01-150
6
0
0
6
0
0
01 01
35(01) 35(01) 35(01) 33(01) 35(01) 35(01) 35(01) 35(01)
1 3Y16-03 3Y16-03
2 SEC 1-1 SEC 2- JOB No DRG No
2
Beam 01 , Beam 3 and other beam have
similar reinforcement x-section
DRAWN S.O A D
A B C D
3750 3750 2000
2Y12-04 5
200
2(02)
200
2(02)
CHECKED B E
4
6
0
0
32Y8-05-150
14Y8-05-150 05
3
0
0
32(05)
6
0
0
LEGEND:
A. BRC MESH REF. A142
B. 150mm THK. GROUND FLOOR
C. CONCRETE SLAB 1000g POLYTHENE D.P.M. D.
50mm THK. QUARRY DUST BLINDING
E. MINIMUM 200mm THICK HARDCORE
F. SELECTED BACKFILL MATERIAL
G. 50mm THK. CONCRETE BLINDING. H.
20mm MASTIC ASPHALT TANKING
I. 100mm THK BLOCKWORK SKIN WALL C.J.
CONTRACTION JOINT
E.J. EXPANSION JOINT
RWDP RAIN WATER DOWN PIPE I.J.
A B C D E F G H I J ISOLATION JOINT
D.O.S DETERMINE ON SITE.
109Y10-02-200B2 103Y10-02-200B2
3
7
5
3Y8-06-200T2
58Y12-01-
58Y12-01-
3Y8-06-200T2
109Y08-02-200T1
103Y08-02-200T1
4
4
58Y10-08-
4
4
58Y10-08-
58Y10-08-
58Y10-08-
34Y10-09-
58Y10-08-
58Y10-08-
58Y10-08-
58Y12-03-
58Y12-03-
3
7
5
4(06) 4(06) 4(06) 4(06) 4(06) 4(06) 4(06) 4(06) 4(10) 4(06) 4(06) 4(06) 4(06) 4(06) 4(06) 4(06) PROJECT: PROPOSED STOREY BLD FOR CLASSROOM BLK
34Y12-
24Y10-04-200B2
4
4
103Y08-02-200T1
109Y08-02-200T1
4
4
3Y8-07-
1
6
6
CLIENTS SIGNATURE
ARCHITECT
STRUCTURALCIVIL ENGINEERS
JOB No DRG No
DRAWN S.O A D
CHECKED N.N B E
LEGEND:
A. BRC MESH REF. A142
B. 150mm THK. GROUND FLOOR
4225 4225 4225 4225 4900 4225 4225 4225 4225 C. CONCRETE SLAB 1000g POLYTHENE D.P.M. D.
50mm THK. QUARRY DUST BLINDING
E. MINIMUM 200mm THICK HARDCORE
F. SELECTED BACKFILL MATERIAL
G. 50mm THK. CONCRETE BLINDING. H.
20mm MASTIC ASPHALT TANKING
I. 100mm THK BLOCKWORK SKIN WALL C.J.
CONTRACTION JOINT
E.J. EXPANSION JOINT
RWDP RAIN WATER DOWN PIPE I.J.
ISOLATION JOINT
D.O.S DETERMINE ON SITE.
3
7
5
3
7
5
2
0
0
1
6
6
CLIENTS SIGNATURE
ARCHITECT
STRUCTURALCIVIL ENGINEERS
≥
≥
FOUNDATION DETAILS
DRG TITLE
JOB No DRG No
DRAWN S.O A D
CHECKED B E
3
CONTRACTOR TO PROPOSE CONSTRUCTION JOINT LAYOUT FOR
ENGINEERS APPROVAL, MAXIMUM SPACING IN EACH DIRECTION TO BE
4.5m
LEGEND:
6
A. BRC MESH REF. A142
75mm
B. 150mm THK. GROUND FLOOR
6
02 02 01 01 C. CONCRETE SLAB 1000g POLYTHENE
75mm
kicker
D. 50mm THK. QUARRY DUST BLINDING
2
03 D.P.M.
11Y8-03-150
03
01 01 E. MINIMUM 200mm THICK HARDCORE
02 02 1 1
11Y8-03-150
1500mm
DOS ≤
200
1 1 G. 50mm THK. CONCRETE BLINDING.
1500mm
SEC 1-1
DOS ≤
4Y16-02 H. 20mm MASTIC ASPHALT
C.J. CONTRACTION JOINTTANKING
3
I.E.J. 100mm THK BLOCKWORK
JOINT SKIN WALL
33
01 0 01 EXPANSION
2
8 1 800 RWDP RAIN WATER DOWN PIPE
01 01 0 200
I.J. ISOLATION JOINT
18Y8-05-150
01 1800
2
500 200 500 D.O.S DETERMINE ON SITE.
12
SEC A-A
SCALE 1:25
200 SEC A-A
SCALE 1:25
800
BASE TYPE B(1800 x 1800): col 1
500
(9 NO)
KICKER 75
SCALE 1:25
7Y16-01-
1200
200
1800
200
7Y16-01-
A A A A
500
7(01)
7(01)
800
500 200 500
1200
1
1800
6
21Y8-04-150
CLIENTS SIGNATURE
ARCHITECT
200
8
3
6
7
BASES
DRG
, STAIR CASE, COLUMN, RC LAYOUT
General Arrangement Layout & Sectional Details
JOB No DRG No
DRAWN
S.O A D
CHECKED B E