Status of Arbitration Cases Challenged/Filed in Court during the period 01.04.2022 to 30.06.

2022

Name of Arbitrators Amount of Amount of Award


Name of the Date of panel of
SN PIU Name of Work / Cause Presiding Contractor RVNL Amount of Claim Counter Claim Date of Award Remarks
Agency Arbitrators Claimant RVNL
Arbitrator Nominee Nominee by RVNL
C/o Roadbed, Major & Minor Bridges, track (excl. supply of rails, sleepers
and TWS), S&T and Gen. Electrical Worksfor doubling between Harlapur Partly accepted for Rs. 9.48 crore & paid.
(excl) to Hebsur (incl) – Km 74.00 to Km 18.97 and Hubli (incl) to Dharwad RVNL has challenged Award partly for
G.P. Garg Madan Lal,
Railone-Tarmat- J.L.N Murthy 07.09.2018 & Rs.9,96,64,288 plus interest in DHC.Last
1 BANGALORE (incl) – Km 469.00 to Km 489.09 on Hubli Division of SW Railway 12.07.2017 Retd CCRS, Retd Dir, 723,354,642 499,102,527 199,758,763 14,536,752
Durga (JV) Advocate 09.10.2018 hearing was held on 29.04.2022 and the
IRSE IRCON
case has been adjourned to december
2022.

Supply and installation of track, signaling and yard lighting work for HCIL-ARSS- JV has challenged the Award in Delhi
2 BBS-IV 08.10.2009 B.S. Kalsi J.S. Mahrok Meenu Dang 340,432,481 6,356,312 28.03.2017 NIL 8,660,124
construction of Keonjhar – Tomka new B.G Line Kalindee High Court.
C/o roadbed, 4 major bridges, minor bridges, track linking, S&T and
BHUBANESWA B.S Kapur
OHE & General Electrical works for doubling between Jaroli (Incl.) and NCCL-VNR- S.P. S Jain M.S Khan Payment released on 26.12.2018
3 R 03.01.2017 Retd. MD, 950,049,604 15.10.2018 3,532,323 Nil
Jakhapura (Incl.) (170.903Km) BCEPL (JV) Retd ME Retd. AM/B JV has challenged the Award in DHC
CPM-III IRCON
Pkg-2 between Basantpur (excl) and Km 136.00 (63.00Km)
(i) Proposed doubling Track between Dindigul and Villupuram – Execution of
major and precast minor bridges between Villupuram to Ariyalur and Valadi
to Dindigul in Southern Railway.
(ii) Proposed doubling Track between Dindigul and Villupuram Execution of
Earthwork in formation, major and minor bridges, station building, staff
Ankush
quarters, General electrical works, overhead electrification works, permanent Theme Engineering S.P.S. Jain Shyam Kumar, Theme Engg has challenged the AT
4 CHENNAI 26.08.2013 Krishan, 10,565,752 17.05.2016 NIL NIL
way works, signaling and telecommunication works between Ariyalur and Services Pvt. Ltd Retd ME Ex GM/E.Rly Award in Patiala House.
Ex MD/IRCON
Valadi in Southern Railway.
(iii) Proposed provision of 4th line between Tiruvallur and Arakkonam –
Construction of roadbed, bridges, supply of ballast, installation of track
(excluding supply of rails and thick web switches), Electrical, Signaling and
Telecommunication works in Southern Railway.
Prposed new Rail connectivity from Idapalli to Vallarpadam for ICTT for
works of elevated structure, major and minor bridges and earthwork in
AFCONS has challenged the Award in
5 CHENNAI Trivandrum Division of S.Railway - Reimbursement of uncompensated AFCONS 06.07.2009 M. Ravindra S.M. Singla P.S. Sridharan 69,787,924 12.05.2011 NIL NIL
Madras HC
additional amount incurred on account of unforeseen/unprecedented
increase in steel prices (Claim no.1 )
"Claim for the payments of additional sums on account of extended stay /
prolongation of contract period" for the work of rail connectivity from Idappalli AFCONS has challenged the Award in
6 CHENNAI AFCONS 06.07.2009 M. Ravindra S. M. Singla P.S. Sridharan 382,786,914 24.11.2017 NIL NIL
to ICTT, Vallarpadam, major & minor bridges and earthwork (Claim No. 4) Madras HC

Execution of Construction of Two Tunnels at Chainages 18660 to 19600 and


23370 to 29990 with ballast less track and construction of Roadbed from KM
17/0 to 35/0 including Earthwork in Formation, Major and Minor Bridges for The JV has challenged the AT Award in
7 CHENNAI DIPL - IL & FS (JV) 24.10.2014 P.K. Singh Rajiv Datt P.K. Jain, 589,986,290 1,740,100,000 16.10.2017 Nil Nil
New Broad Gauge Railway Line (Obulavaripalle to Venkatachalam) in Delhi HC.
Kadapa and Nellore Districts of the State of Andhra Pradesh in South
Central Railway, India
O.P. Agarwal
DELHI Roadbed, Bridges, installation of track and electrical work (RE and general Kanwarjit Singh RVNL has challenged the Award in Delhi
8 IRCON-GDCL 15.12.2009 S.P. Mehta Retd AM, Rly 162,704,684 26.05.2011 61,998,239 Nil
ED-WORKS electrification) for 3rd Line on Aligarh - Ghaziabad section. Retd ME High Court.Next d.o.h 31.08.2022.
Bd
Flust Butt Welding of 52 Kg/60Kg rail at site using Mobile Butt Welding Plant RVNL has challenged the Award in
DELHI Royal Forgings (P) Ashok A.K. Tyagi D.C. Pandey
9 for different Construction Projects under RVNl of Indian Railway. 30.06.2010 4,050,000 05.10.2018 4,050,000 Nil Patiala House Court, Delhi.Next d.o.h
ED-WORKS Ltd. Kumar GGM/RVNL PED/RVNL
27.08.22.
Manufacture and supply of PSC mono-block sleepers for various rail road ICON Sleepers / ICON has challenged the AT Award in
DELHI
10 projects in different regions of India Vaman 30.06.2011 B.S. Kalsi S.K. Agarwal P.K. Singh 7,900,000 23.08.2019 NIL NIL Patiala House in Dec 2019.Next d.o.h
ED-WORKS
Prestressing 03.08.2022.
Design and Construct of PSC Viaduct, Embankment & Stations incl. E&M RVNL has challanged AT Award in Delhi
works in connection with extn of Metro Rail Line Noapara (Excl. Baranagar- R.K. High Court, in July 2019.The present
KOLKATA Dakshineswar) CCCL-SAM India Agrawal Shivaji Rakshit, P.K. Jain proceedings are stayed till the conclusion
11 26.06.2014 1,156,788,270 1,864,560,323 24.04.2019 500,335,231 Nil
CPM-MJT (JV) retd Ex. Secy, RB ED/NCRTC of the proceedings before
PCE/SER NCLT,CHENNAI.Matter to be listd on
02.02.2023.

1/2
Status of Arbitration Cases Challenged/Filed in Court during the period 01.04.2022 to 30.06.2022

Name of Arbitrators Amount of Amount of Award


Name of the Date of panel of
SN PIU Name of Work / Cause Presiding Contractor RVNL Amount of Claim Counter Claim Date of Award Remarks
Agency Arbitrators Claimant RVNL
Arbitrator Nominee Nominee by RVNL
Construction of CBD1 to Rabindra Tirtha metro viaduct-ANV4 L&T has challenged AT award in Delhi
KOLKATA CLAIM 1 to 5 HC.Written Synopsis file by the
12 L&T Ltd 22.01.2014 Arun Kumar Vinay Singh Dinesh Kumar 92,226,640 31.03.2017 2,218,863 Nil
CPM-Rajarhat respondent on 19.08.2019.Likely to be
listed on 22.09.2022 in court no.45.
C/o Roadbed, Major & Minor Bridges, trackwork (excl. supply of rails, thick
RAIPUR web switches, weldable CMS crossings and line sleepers), Signaling and ERA-Patel- Deepak Arya Bhusan
13 01.12.2016 R.L. Malik 993,996,577 880,350,235 05.02.2020 232,849,714 117,070,334 RVNL has challanged AT Award.
CPM-II Electrical (RE & Gen.) Work of 3rd line in Bhatapara – Urkura Section Advance-Kiran (JV) Krishan Shukla
(58.7Kms) in Chhattisgarh

RVNL filed a petition in madras high


14 CHENNAI Reconstruction of rob 380A Between Srirangan and Tiruchchirappali. court challenging the award .However
it is learnt that the case is disposed
K.S. & CO. off.Order of the court is awaited.