DO - 044 - S2012 Project Duration
DO - 044 - S2012 Project Duration
DO - 044 - S2012 Project Duration
J I>AJ 1/
. '.
Ge-110 L. SINGSON
. Secretary
111\ 1~1111111111\\I\~\11
WIN2W01503
STANDARD PROJECT DURATION OF DPWH PROJECTS Department Order No. -----'EL
Series of 2012
ANNEXA
Project Duration by Project Cost (Calendar Days)
Project Category ILevel of Improvement
5 Million 20 Million 50 Million 100 Million 150 Million
A. Roads
1 Paved (Concrete) To Paved (Concrete) 36 117 173 228 259
2 Paved (Asphalt) To Paved (Concrete) 32 101 148 196 222
3 Paved (Asphalt) To Paved (Asphalt) 25 72 105 138 157
4 Gravel To Asphalt 20 55 80 104 119
5 Gravel To Concrete 27 80 118 155 176
6 Asphalt Overlay 21 56 81 106 122
7 Concrete Reblocking, 30% of existing PCCP 24 71 104 136 155
8 Concrete Reblocking, 50% of existing PCCP 26 79 116 152 173
9 Re-Gravelling 32 102 151 199 226 \
10 New Road Opening, Concrete, Assume Embankment, H = 1.00m 28 87 128 169 192
11 New Road Opening, Concrete, Assume Road Cut, H = 1.00m 37 121 179 237 269
12 Widening Paved 32 102 150 198 225
B. Bridges
1 RCDG on RC. Pile Foundation 125 160 201 255 274
2 PSCG on RC. Pile Foundation 140 162 180 207 225
3 RCDG on Bored Pile Foundation 105 156 192 265 294
4 PSCG on Bored Pile Foundation 105 131 168 214 243
5 Retrofitting/ Rehabilitation/ Strengthening 62 90 162 266 318
1 of 2
STANDARD PROJECT DURATION OF DPWH PROJECTS Department Order No. ~
Series of 2012
ANNEXA
Project Duration by Project Cost (Calendar Days)
Project Category ILevel of Improvement
5 Million 20 Million 50 Million 100 Million 150 Million
C. Flood Control And Drainage
a. Dikes
1 Earthdikes 28 85 194 234 291
2 Gabion Spur Dike, Type I 84 163 205 247 307
3 Boulder Spur Dike, Type II 143 174 219 290 347
b. RevetmentiRiverwalis
1 Grouted Riprap resting on Concrete with Steel Sheet Pile Foundation 49 171 214 297 321
2 Reinforced Concrete, Type I 76 147 185 223 278
3 Rubble Concrete, Type I 75 145 182 219 273
4 Gravity Wall, Type I 107 170 213 257 320
c. Drainage and Slope Protection
1 Grouted Riprap 157 309 387
2 Stone Masonry 107 208 261
3 RCPC Drainage with Manhole/Catch Basin 147 289 363
D. School Buildings
a. School Buildings
1 7x7 m. Classroom, One (1) Unit 45
2 7x9 m. Classroom, One (1) Unit 60
Note:
1. To calculate the project duration when the cost falls between the values in the above table, the following formula shall be used.
Calendar Days = [(given reference amount x reference duration per km. of road) + estimated amount per km. of road] + [duration of mob./demob. on the given reference amount]
2. Assumptions:
a. Duration includes MobilizationlDemobilization: Up to P5 Million - 10 c.d.; Above P5 Million up to P20 Million - 15 c.d.; Above P20 Million up to P50 Million - 20 c.d.; Above P50
Million up to P100 Million - 25 c.d. & Above P100 Million up to P150 Million - 30 c.d.;
b. Duration excludes Sundays, Holidays and Pre-determined Unworkable Days.
( 3. No standard duration was established for projects costing more than P150 Million. Computation shall be based on the PERT/CPM schedule, considering the use of optimum
2of2
additional resources.
DERIVATION OF STANDARD PROJECT DURATION Department Order No. ~
Series of 2012
ANNEX B
A. Roads
Paved (Concrete) To Paved (Concrete]- Pavement Width = 6.70m, Shoulder Width = 2.00m & Pavement Thickness = O.23m
(Calendar Days)
5450 2534 10136 253.40 50679 760.19
Reference duration/Proportionate fo the given amount
Length 1 OOKm 041 Km 163 Km. 409 Km 8.17 Km. 1226 Km.
Reference/Given amount 12234.91412 5000,00000 20000.00000 50000.00000 100,00000000 150.00000000
(Calendar Days)
5200 21.50 85.50 213.00 425.50 638.00
Reference duration/Proportionate to the given amount
Say 32 c.d Say 101 c.d Say 148 c.d "i, 13t: :-".,;
Paved (Asphalt) To Paved (Asphalt) - Pavement Width = 6.70m, Shoulder Width = 2.00m & Pavement Thickness = 100mm
(Calendar Days)
4000 14.50 56.50 140.50 28100 42100
Reference duration/Proportionate to the given amount
: ."
duration due to additional set of crew of manpower & 2450 71 50 10450 ""'-'
equipment
'Duration reduction factor IS applied due to intuslon of additional resources as the scope of work becomes bigger
1 of 9
DERIVATION OF STANDARD PROJECT DURATION Department Order No. Ifef
Series of 2012
ANNEX B
Gravel To Asphalt- Pavement Width = 6.70m, Shoulder Width = 2.00m & Pavement Thickness = 100mm
(Calendar Days)
3100 1000 3950 9850 19650 29450
Reference duration/Proportionate to the given amount
Gravel To Concrete
(Calendar Days)
38.50 1650 65.00 16200 32350 48550
Reference duration/Proportionate to the given amount
Asphalt Overlay - Pavement Width = 6.70m, Shoulder Width = 2.00m & Pavement Thickness = 50mm
(Calendar Days)
1400 1050 4050 10150 202.50 304.00
Reference duration/Proportionate to the given amount
2 of 9
DERIVATION OF STANDARD PROJECT DURATION Department Order No, ~
Series of 2012
ANNEX B
Concrete Reblocking, 30% of existing PCCP
(Calendar Days)
2550 1400 5550 13850 277.00 41500
Reference duratiorrl'ropo-tonate fa the given amount
(Calendar Days)
36.00 1600 6350 15850 31650 47500
Reference duration/Proportionate to the given amount
Re-Gravelling
(Calendar Days)
1000 2200 8700 217.50 43500 65250
Reference duranon.Proporuonate to the given amount
3 of 9
DERIVATION OF STANDARD PROJECT DURATION Department Order No, ~
Series of 2012
ANNEX B
10 New Road Opening, Concrete, Assume Embankment Height = 1.00m
(Calendar Days)
8330 1800 7200 18000 36000 54000
Reference duration/Proportionate to the given amount
(Calendar Days)
8000 2650 10600 26500 52950 79400
Reference duration/Proportionate to the given amount
(Calendar Days)
2750 22.00 8650 21600 431.50 64700
Reference duration/Proportionate to the given amount
v 4 of 9
DERIVATION OF STANDARD PROJECT DURATION Department Order No. !iL
Series of 2012
ANNEX B
B. Bridge (Based on Typical Standard Design)
ReVised Duration (Calendar Days) •...•.. !, 'C),\) (i;) )/) ,U,,· !U.; ;'4'>;
'CC ,; ,;" '>; 1'\'." .;,.; /,;,; ,) "'/'e! ',,;; ,Ace!
2, PSCG on R,C, Pile Foundation 151m 481m 120 l.rn 240lm 360lm
Length
@ 1 Span of 151.m @ 2 Spans of 241m @ 5 Spans of 241m @ 10 Spans of 241m @ 15 Spans of 241m.
Amount 5000.00000 20000,00000 50.000,00000 100,000,00000 150.00000000
Calendar Days 14000 18000 22500 29500 375.00
Duration Reduction Factor' . ,,'0 " ,;c cuc cn ',""
Revised Duration (Calendar Days) 1'\"",' 0; ;),,' '!',; CC ),':!, ). ;;',CO
'.2; "1' c" ,); );'),0 ;)"i '80;) '''! (i,: c.zi ')"'1 ,j',,, u.
3. RCDG on Bored Pile Foundation 151 m 121m 1681.m 3121m 4561m
Length
@ 1 Span of 151m @ 3 Spans of 241m. @ 7 Spans of 241m @ 13 Spans of 241m @ 19 Spans of 241m
Amount 5.00000000 20000,00000 50.000.00000 100,000.00000 150000,00000
Calendar Days 105.00 19500 32000 530.00 73500
Duration Reduction Factor' \ziG ",.!, .'" , GO ) ,j.,
Revised Duration (Calendar Days) "", O· 15·/)) 1',,' CC U'S'; ." ;';c CC
)" 1'/' ,.(1 ").)'1 ";:), J ;;,!i ;9;;, '<) ,I .')"y /y, u.
4. PSCG on Bored Pile Foundation 151m 481m 120lm 2401.m 3601.m
Length
@ 1 Span of 151m @ 2 Spans of 24 I m @ 5 Spans of 241m @ 10 Spans of 24 1m @ 15 Spans of 241.m
Amount 5.00000000 20000.00000 50.000.00000 100.000.00000 150.000,00000
Calendar Days 105.00 14500 21000 305.00 40500
Duration Reduction Factor' )CC • 'C, Cj • «r: ,'"
Revised Duration (Calendar Days) 1/" CC '::J ",.' CC ) 3 ,;, "Ui/1
',<,j 'D, c. .•.,,'1 ;, '; ))?\ 'SS 'i ,'" .';) c;J >, ;4;).; U
5. Retro/itti ng/Rehabilitation/Strengthening 1451m 45.75 1m 18250lm 456 00 1m 912001.m 1367751m
Length @ 2 Spans of 46 32 I m
Amount 15903,33186 5,00000000 20.000,00000 50,000.00000 100.000.00000 150,000.00000
Calendar Days 165.00 6200 22275 53900 1,06275 1.586.50
Duration Reduction Factor' C ,<1, C., ,,'). ;,,,
5 of 9
DERIVATION OF STANDARD PROJECT DURATION Department Order No. ~
Series of 2012
ANNEX B
C. Flood Control and Drainage
a. Dikes
Earthdikes
Say 28 c.d Say 85 c.d Say 194 cd Say 234 cd Say 291 c.d
Say 84 cd Say 163 c.d Say 205 c.d Say 247 c.d Say 307 c.d
6 of 9
DERIVATION OF STANDARD PROJECT DURATION Department Order No. ~
Series of 2012
b. Revetment/Riverwalis ANNEX B
Grouted Riprap resting on Concrete wi Steel Sheet Pile foundation
7 of 9
DERIVATION OF STANDARD PROJECT DURATION Department Order No. ~
Series of 2012
Grouted Riprap
Stone Masonry
8 of 9
DERIVATION OF STANDARD PROJECT DURATION Department Order No. --.1L
Series of 2012
ANNEX B
D. Buildings And School Buildings
7x7 m. Classroom
Duration Factor
Amount 544,92216
7x9 m. Classroom
Duration Factor
Amount 794.315.42