Nothing Special   »   [go: up one dir, main page]

Training Plan Computer System Servicing NC Ii

Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 10

TRAINING PLAN

COMPUTER SYSTEM SERVICING NC II


_
Trainees’
Training Mode of Facilities/Tools Assessment Date and
Training Staff Venue
Activity/Task Training and Equipment Method Time
Requirements

LO1. Assemble OJT Teacher/  Screwdriver PLDT  Demonstr June 6,


AND computer (standard) Telecommuni ation 2018
INSTALL Trainer/
hardware  Screwdriver cation  Observati
CONFIGURE Facilitator:
(Philips) on
COMPUTER 1.1 Unit Marichu C.  Long nose  Interviews (8 am-12
SYSTEMS assembly is Briones pliers Vigan City, / pm)
planned and
 Mechanical Ilocos Sur questioni
prepared to
pliers ng
ensure (1 pm – 5
 Allen wrench
OH&S  Third pm)
Training  Crimping
policies and party
Coordinator tools
procedures report
Michelle M.  Soldering
are followed  Assessme
Peralta iron
in nt of
 Solder sucker
accordance output
 Wire stripper
with product
 Portable
systems  Portfolio
electric hand
requirement  Computer
drill
s based
 Drill bit assessme
1.2 Materials  Precision
necessary to Training nt
screw drivers
complete the Supervisor:  Anti-static  Written/
work are
identified Ralph devices Oral
and Nicole A.  Flash examinati
obtained in Sevilla light/Head on
accordance mounted
with light
established
procedures
and checked
against
systems
requirement
s
1.3 Tools,
equipment
and testing
devices
needed to
carry out the
installation
work are
obtained in
accordance
with
established
procedures
and checked
for correct
operation
and safety
1.4 Computer
hardware is
assembled
in
accordance
with
established
procedures
and systems
requirement
s
1.5. Basic-input-
output-system
(BIOS)
configuration is
performed in
accordance with
hardware
requirements.

LO2. Prepare
installer OJT Teacher/  Screwdriver PLDT June 6,
 Demonstr
1.1 Portable (standard) Telecommuni ation 2018
Trainer/
bootable devices  Screwdriver cation  Observati
Facilitator:
are created in (Philips) on
accordance with Marichu C.  Long nose (8 am-12
 Interviews
software Briones pliers Vigan City, pm)
/
manufacturer  Mechanical Ilocos Sur
questioni
instruction pliers ng
 Allen wrench (1 pm – 5
1.2  Third
Training  Crimping party pm)
Customized Coordinator tools report
installers are Michelle M.  Soldering  Assessme
prepared in Peralta iron nt of
accordance with  Solder sucker output
software  Wire stripper product
utilization guide  Portable  Portfolio
and end user electric hand  Computer
agreement. drill based
 Drill bit assessme
1.3
Training  Precision nt
screw drivers
Installation of Supervisor:  Written/
 Anti-static
portable Oral
Ralph devices
applications are examinati
Nicole A.
carried out in Flash light/Head on
Sevilla
accordance with mounted light
software user
guide and
software license
Teacher/  Demonstr
OJT  Screwdriver PLDT ation
Trainer/ (standard) Telecommuni  Observati
LO3. Install Facilitator: June 6,
 Screwdriver cation on
operating 2018
Marichu C. (Philips)  Interviews
system and
Briones  Long nose /
drivers for pliers Vigan City, questioni
peripherals/ (8 am-12
 Mechanical Ilocos Sur ng
devices pm)
pliers
 Third
 Allen wrench
Training party
 Crimping (1 pm – 5
Coordinator report
tools
Michelle M.  Soldering  Assessme pm)
Peralta iron nt of
3.1 Operating
 Solder sucker output
system (OS) is
 Wire stripper product
installed in
 Portable  Portfolio
accordance with
electric hand  Computer
established
drill based
installation
 Drill bit assessme
procedures and
Training  Precision nt
to comply with
screw drivers
end-user Supervisor:  Written/
 Anti-static
requirements Oral
Ralph devices examinati
3.2 Nicole A.
Flash light/Head on
Sevilla
mounted light
Peripherals/devi
ces drivers are
installed and
configured in
accordance with
manufacturer’s
instructions
and/or OS
installation
procedures.
3.3 OS and
drivers
updates/patches
are accessed and
installed in
accordance with
manufacturer’s
recommendation
s and
requirements
3.4 On-going
checks of the
quality of the
work are
undertaken in
accordance with
established
procedures OJT Teacher/  Screwdriver  Demonstr
(standard) ation
Trainer/ PLDT
 Screwdriver  Observati
Facilitator: Telecommuni
LO4. Install (Philips) on June 6,
cation
application Marichu C.  Long nose  Interviews 2018
software Briones pliers /
 Mechanical Vigan City, questioni
pliers ng (8 am-12
Ilocos Sur
4.1. Applicatio  Allen wrench pm)
n  Third
Training  Crimping
software party
Coordinator tools
are report (1 pm – 5
Michelle M.  Soldering
installed  Assessme pm)
Peralta iron
based on nt of
 Solder sucker
software output
 Wire stripper
installatio product
 Portable
n guides,  Portfolio
electric hand
end-user  Computer
drill
requireme based
 Drill bit
nts and assessme
software Training  Precision nt
license screw drivers
Supervisor:  Written/
agreement  Anti-static Oral
4.2. Variation Ralph devices examinati
to Nicole A.  Flash on
application Sevilla light/Head
software mounted
installatio light
n is
carried out
in
accordanc
e to
customer/
client
requireme
nts
4.3. Software
updates
are
accessed
and
installed in
accordanc
e with
manufactu
rer’s
recommen
dations
and
requireme
nts

Teacher/
Trainer/  Screwdriver  Demonstr
LO5. Install Facilitator: (standard) ation
application  Screwdriver  Observati
Marichu C.
software. (Philips) on
Briones
OJT  Long nose PLDT  Interviews
pliers Telecommuni /
5.1. Devices /  Mechanical June 6,
cation questioni
systems pliers 2018
ng
and/or Training  Allen wrench
installatio Coordinator  Third
 Crimping Vigan City,
n is tested Michelle M. party (8 am-12
tools Ilocos Sur
to Peralta report pm)
 Soldering
determine  Assessme
iron
whether it nt of
 Solder sucker (1 pm – 5
conforms output
 Wire stripper pm)
to product
 Portable
requireme  Portfolio
electric hand
nts  Computer
drill
Training based
5.2. Stress  Drill bit
assessme
test is Supervisor:  Precision
nt
conducted screw drivers
to ensure Ralph  Anti-static  Written/
reliability Nicole A. devices Oral
of Sevilla examinati
Flash light/Head
equipment on
mounted light
in
accordanc
e with
manufactu
rer’s
instruction
s and
system
requireme
nts
5.3. 5S and
3Rs are
followed
according
to
environme
ntal
policies
5.4. Document
ation in
relation to
the test is
forwarded
to
appropriat
e
personnel
and/or
authority
in
accordanc
e with
requireme
nts

PREPARED BY:

MARICHU C. BRIONES MARIA CHERRY P. NAVIDA


Bread and Pastry Production- Trainer School Head

RALPH NICOLE A. SEVILLA


Manager

You might also like