Plant Parameters Form Net Metering
Plant Parameters Form Net Metering
Plant Parameters Form Net Metering
Contact Person:
Mailing Address:
Telephone:
Fax:
E-mail:
Plant Parameter for DIS Net Metering Application July 31, 2013 Page 1 of 2
10. Renewable Energy Technology:
Site plan with approximate line routings for connection to nearby MERALCO facilities.
The Site Plan include roads (with street names) and lot numbers and nearby power lines.
Plant Parameter for DIS Net Metering Application July 31, 2013 Page 2 of 2
Annex A
(For Solar Panels and Wind Turbines equipped with Power Converter)
Provide a SLD of the customer loads and generating facilities including the customer’s
point of connection to MERALCO’S Distribution System.
Note: The diagram/drawing shall indicate the quantities, ratings, and operating
parameters of equipment and cables.
Plant Parameter for DIS Net Metering Application July 31, 2013 Annex A 1 of 5
2. Load Information : Customer and Generating Facility
a. Updated Load Schedule (Please attach additional sheets for the information.)
b. Total Connected Load: 1-phase ______ kVA ______ kW
3-phase ______ kVA ______ kW
c. Maximum continuous load: 1-phase ______ kVA ______ kW
3-phase ______ kVA ______ kW
d. Maximum start up load: 1-phase ______ kVA ______ kW
3-phase ______ kVA ______ kW
e. Largest motor size that would be started: _______ HP _______ kW
f. Maximum inrush current of the motor (multiple of full load current): _____ p.u.
i) Manufacturer : _______________
ii) Technology : _______________
iii) Model No. : _______________
Plant Parameter for DIS Net Metering Application July 31, 2013 Annex A 2 of 5
iv) Total Plant Capacity : _____________ kWp DC
v) Rated Output : _______________
vi) Operating Current : ___________Amp
vii) Open Circuit Voltage : ___________volts
viii) Short Circuit Current : ___________Amp
ix) Number of Units : _______________
x) Total PV Array Area : _______________
xi) Is there lightning protection system available?
Yes No
xii) Grounding
System Equipment
e. Inverter / SPC units: (Please provide additional sheets for multiple models.)
Plant Parameter for DIS Net Metering Application July 31, 2013 Annex A 3 of 5
xix) Inverter power factor adjustments range, if applicable (specify lag or lead)
from: __________ p.u. to __________ p.u.
xx) Are power factor correction capacitors used?
xxi) If yes, total power correction installed : ________ VAR
xxii) Number of capacitors steps : _______
xxiii) Grounding
System Equipment
xxiv) Are power factor correction capacitors automatically switched off when
inverter breaker opens?
Yes No
xxv) Does the inverter have surge protection available?
Yes No
xxvi) Does the inverter have short circuit shutdown capability?
Yes No
xxvii) Does the inverter have anti-islanding protection?
Yes No
xxviii) Is the inverter paralleling equipment and/or design pre-certified?
Yes No
xxix) If yes, to which standard(s), e.g. UL-1741, CSA c22.2 No. 107.1-01,
IEEE 1547: _________
xxx) Maximum inrush current upon inverter start-up (multiple of full-load
current): ________ p.u.
xxxi) Is the inverter test certified?
Yes No
If yes, please attach the test certificate.
Plant Parameter for DIS Net Metering Application July 31, 2013 Annex A 4 of 5
5. Interface Transformer Characteristics (if applicable)
Plant Parameter for DIS Net Metering Application July 31, 2013 Annex A 5 of 5
Annex B
(For Biomass, Biogas and Wind Induction RE Technologies)
Provide a SLD of the customer loads and generating facilities including the customer’s
point of connection to MERALCO’S Distribution System.
• Riser Diagram (Loads and Generators)
• System Block Diagram
• AC System
• AC Grounding System
• Protection System
• Synchronization Equipment
• Equipment (e.g. Generating Unit, transformer, circuit breaker, etc.)
• Electrical circuits
• Switching facilities
• Phasing arrangements
Note: The diagram/drawing shall indicate the quantities, ratings, and operating
parameters of equipment and cables.
Plant Parameter for DIS Net Metering Application July 31, 2013 Annex B 1 of 6
2. Load Information : Customer and Generating Facility
a. Updated Load Schedule (Please attach additional sheets for the information.)
b. Total Connected Load: 1-phase ______ kVA ______ kW
3-phase ______ kVA ______ kW
c. Maximum continuous load: 1-phase ______ kVA ______ kW
3-phase ______ kVA ______ kW
d. Maximum start up load: 1-phase ______ kVA ______ kW
3-phase ______ kVA ______ kW
e. Largest motor size that would be started: _______ HP _______ kW
f. Maximum inrush current of the motor (multiple of full load current): _____ p.u.
c. For Synchronous Units: (Please provide additional sheets for multiple models.)
i) Manufacturer / Model: ___________
ii) Generation facility voltage: _______ Volts
Plant Parameter for DIS Net Metering Application July 31, 2013 Annex B 2 of 6
iii) Rated Current: _____ A
iv) Rated Power Factor of generating unit(s): ____ p.u.
v) Power factor operating range if applicable (specify Lag or Lead):
__________p.u to __________p.u.
vi) Sequence Impedances
Positive sequence : ___ (r) + j ___ (x) p.u. ;
___ (r) + j ___ (x) ohms
Negative sequence : ___ (r) + j ___ (x) p.u. ;
___ (r) + j ___ (x) ohms
Zero sequence : ___ (r) + j ___ (x) p.u. ;
___ (r) + j ___ (x) ohms
Unsaturated reactances on: ____ kVA base, _____ V base
Direct axis synchronous Reactance, Xd ____ p.u. ____ohms
Direct axis transient Reactance, Xd’ ____ p.u. _____ohms
Direct axis subtransient Reactance, Xd” ____p.u. ____ohms
Quadrature synchronous Reactance, Xq _____ p.u. _____ ohms
Quadrature transient Reactance, Xq’ ____ p.u. _____ohms
Quadrature subtransient Reactance, Xq” ____ p.u. _____ohms
vii) Time Constants:
Direct axis open circuit transient, T’do ___ second
Direct axis open circuit subtransient, T”do ___ second
Quadrature open circuit transient, T’qo ___ second
Quadrature open circuit subtransient, T”qo ___ second
viii) Exciter PT Ratio ________
ix) Earth Resistivity ________ ohms-meters
x) Leakage reactance, xl ___ p.u. ___ohms
xi) Armature resistance, ra ___ p.u. ___ohms
xii) Provide a plot of generator capability curve (kW output vs. kVAR)
xiii) Generator Inertia constant (on machine base)
H = _____ seconds (generator only)
H = _____ seconds (generator and turbine)
xiv) Grounding
System Equipment
Plant Parameter for DIS Net Metering Application July 31, 2013 Annex B 3 of 6
d. For Induction Units: (Please provide additional sheets for multiple models.)
i) Manufacturer / Model: ___________
ii) Generation Facility Voltage: _______ Volts
iii) Rated Current: _____ A
iv) Rated Design power factor: ______ p.u.
v) Power factor operating range if applicable (specify Lag or Lead):
__________p.u to __________p.u.
vi) Unsaturated reactances on:_______ kVA base, ________ V base
Direct Axis synchronous Reactance, Xd ____ p.u.
Direct Axis transient Reactance, Xd’ _____ p.u.
Direct Axis subtransient reactance, Xd” _____ p.u.
vii) Time constants:
Direct axis open circuit transient, T’ _____ second
Direct axis open circuit subtransient, T” _____ second
viii) Actual Power factor at point of connection (after p.f. correction):
• Full Output: _________ p.u.
• No Output: _________ p.u.
ix) Generator full reactive power requirements:
• Full Output: _________ kVAR
• No Output: _________ kVAR
x) Total power correction installed: ________ VAR
• Number of regulating steps: _______
• Power factor correction switched per step: ________ VAR
• Power factor correction capacitors are automatically switched off
when generator breaker opens: __________
xi) Maximum starting inrush current (multiple of full load current): ____ p.u.
xii) Generator inertia constant (on machine base).
H = _____ seconds (generator only)
H = _____ seconds (generator and turbine)
xiii) Grounding
System Equipment
Plant Parameter for DIS Net Metering Application July 31, 2013 Annex B 4 of 6
e. Characteristics (Please attach additional sheets to provide the information.)
a. Capability curve
b. Short circuit curve
c. Open circuit saturation curve
d. V curves
Plant Parameter for DIS Net Metering Application July 31, 2013 Annex B 5 of 6
6. Operation Information:
Plant Parameter for DIS Net Metering Application July 31, 2013 Annex B 6 of 6