Bill of Quantity (Boq) : DMHDP
Bill of Quantity (Boq) : DMHDP
Bill of Quantity (Boq) : DMHDP
DMHDP
A. SUBSTRUCTURE
1.EXCAVATION AND EARTH WORK
m2 461 45.44
1.2 Bulk excavation to reduce and
level the natural ground level to a
depth not exceeding 150cm.
m3 195 100.06
1.3 Excavation for pit or isolated
footing in ordinary soil from
reduced level to 200cm depth. 493 119.44
m3
1.5 Trench Excavation for stone
masonry wall to retain fill. m3 493 78.00
1.6 Backfill around isolated footings
and with selected excavated
material and well compacted in
layers not exceeding 200mm.
m3 410 53.75
1.7 Backfill around treanch masnory
and with selected excavated
material and well compacted in
layers not exceeding 1600mm.
m3 11 53.75
1.9 Cartaway surplus excavated
material and deposit at a suitable
tipping site outside the compound.
m3 390 31.64
Carried to Summary
2. CONCRETE WORK
2.1 5cm thick lean concrete C-5, 150kg
cement per meter cube of concrete
under
5. MASONRY WORKS
5.1 50cm thick equivalent stone
approved by the consultant
masonry foundation well below
NGL, bedded and jointed in cement
and sand mortar, 1:4.
m3 19 1345.36
Carried to Summary
6. HARD CORE
6.10 25cm thick of hard core m2 273 334.05
Carried to Summary
B. SUPERSTRUCTURE
1 REINFORCMENT BAR
2 CONCRETE WORK
2.1 a) In elevation columns. m3 23 2,407.29
2.2 b) In beams m3 57 2,407.29
2.3 c) mesh concrete slab m2 66 2,407.29
2.4 e) In staircase. m3 12 2,407.29
2.5 f) precast beam pcs 87
2.6 g) precast beam m³ 64 745.50
Carried to summery
3.Provide, cut and fix in position
sawn wooden formwork or
equivalent.
m2 357 386.94
Carried to Summary
6 .Ceiling Work
6.1 20mm thick cheapood ceilling or
equivalent suspended ceiling fixed
to main Tee runner and Cross Tee
runner. Price shall includes all
necessary supports and suspends.
m2 260 330.54
Carried to summery
7. Glazing work
7.1
Glazing with the tihckness of 4mm m2 128.49 363.85
Carried to Summary
9. Metal WORK
9.1 A steair case
balustrade with 40*40*2.5mm
around staircase.(handrail with
40*40*2.5mm) kg 18 76.55
Supply and fix metal thin hand rail
with 25*25*2.5mm around
staircase. kg 5 80.48
Carried to Summary
11 .Wall finishing
11.1 Apply two coats of plaster in
cement sand mortar 1:3 to external
& internal HCB wall m2 4310 168.54
painting of internal and
externalwall including beam and
column m² 4570 49.95
Carried to summery
12.1 12 floor finishing
12.2 plastering of floor celing with
including of beam (plastering for
ceilling or soffit) m2 1220 208.94
12.40 the uper surface of slab in cement-
sand screed 1:3. m² 66 83.62
window sill 248x28x3 m 132 507.00
Carried to summery
13.1 13.SANITARY EQUIPMENT
(FIXTURES)
diameter 40 mm pvc waste water
pipe
13.2 diameter 40 mm cold water supply
m 17 76.57
13.3 diameter 75mm pvc waste water
pipe m 16 72.73
13.4 diameter 110mm pvc waste water
pipe m 61 177.71
diameter 50mm pipe for waste
water drainage
m 120 81.09
Diameter 25mm pipe for cold
water supply m 51 269.48
13.5 sammary of sanitary instalation
Plumbing Water Supply System
b) Dia 20 mm m 53 269.48
c) Dia 15 mm m 378 333.44
a) Gate valve pcs
Carried to Summary
Amount
20,940.22
19,528.58
58,892.08
38,457.90
22,017.61
608.99
12,328.18
172,773.56
87,731.65
56,391.47
177,622.84
321,745.96
190,730.28
33,728.36
582,968.05
807,426.69
69,203.28
35,971.14
79,044.96
184,219.37
53,132.36
13,247.37
68,276.46
66,749.97
20,084.93
81,911.31
303,402.41
25,413.90
91,045.49
11,243.68
101,635.11
6,545.60
55,316.56
35,890.85
80,240.06
87,954.31
378,826.17
55,464.00
137,613.41
159,747.88
27,937.22
47,651.58
428,414.10
310,115.35
443,941.08
754,056.42
633,800.93
44,544.25
116,402.28
1,738,800.00
2,533,547.47
138,014.53
85,974.67
46,752.69
4,103.37
3,663.72
7,767.08
1,367.11
416.90
1,784.02
62,505.94
39,824.27
14,855.95
129,428.09
6,490.60
253,104.85
726,324.04
228,246.16
954,570.20
254,911.60
5,549.26
66,700.92
327,161.77
1,286.38
1,175.24
10,783.34
9,731.25
13,716.28
36,692.48
14,352.24
126,119.40
177,164.12
25,200.24
18,870.72
15,912.00
23,837.76
10,279.92
28,264.32
9,227.52
35,526.17
86,953.31
254,071.96
Description Unit Qty
A. SUBSTRUCTURE
1. EXCAVATION AND EARTH WORK
1.1,Clear of the site to remove top soil to an average depth of 20cm. m2 461
1.2,Bulk excavation to reduce and level the natural ground level to a depth not exceeding
150cm. m3 195
1.3, Excavation for pit or isolated footing in ordinary soil from reduced level to 200cm depth. m 3
493
1.4, Trench Excavation for stone masonry wall to retain fill. m3 30
1.5, Backfill around isolated footings and with selected excavated material and well compacted
in layers not exceeding 200mm. m3 410
1.6 Backfill around treanch masnory and with selected excavated material and well compacted
in layers not exceeding 1600mm. m3 11
1.7,Cartaway surplus excavated material and deposit at a suitable tipping site outside the
compound. m3 390
2. CONCRETE WORK
2 lean concrete C-5
2.1 Footing pads m2 135
2.2 Grade beams m2 87
2.3 Lean concrete under GFS m2 273
Concrete C-25
2.4 In footing pad.and footing column m3 83
2.5 In ground level beams.or grade beam m 3
15
2.6 In 10 cm thick ground floor slab m2 255
3 Masonry work m3 19
4 Hard core m 2
273
5 Form work
5.1 In footing pad. m2 133
5.2 In foundation column. m2 65
5.3 In ground level beams. m2 155
6 Steel reinforcements bar
6.1 Dia.. 6 mm deformed bar. kg 833
6.2 Dia.. 8 mm deformed bar. kg 226
6.3 Dia.. 12 mm deformed bar. kg 1110
6.4 Dia.. 14 mm deformed bar. kg 1105
6.5 Dia.. 16 mm deformed bar. kg 352
6.6 Dia… 20 mm deformed bar kg 1449
B. SUPERSTRUCTURE
1 CONCRETE WORK
1.1 In elevation columns. m3 23
1.2 In beams m3 57
1.3 mesh concrete slab m 2
66
1.4 In staircase. m3 12
1.5 precast beam pcs 87
1.6 precast beam m³ 64
2 REINFORCMENT BAR
2.1 Dia.. 6 mm deformed bar. kg 176
2.2 Dia.. 8 mm deformed bar. kg 1731
2.3 Dia.. 10 mm deformed bar. kg 102
2.4 Dia.. 12 mm deformed bar. kg 900
2.5 Dia.. 14 mm deformed bar. kg 594
2.6 Dia.. 16 mm deformed bar. kg 1407
2.7 Dia… 20 mm deformed bar kg 1556
3.Provide, cut and fix in position sawn wooden formwork or equivalent.
a) In elevation columns. m2 409
b) In beams &stair up m2 871
4. BLOCK WORK
4.1 construct 20 cm HCB for wall m2 1290
4.2 construct 15 cm HCB for partion m2 92
4.3Construct10 cm HCB for toilet m² 249
4.4 60*20*20 HCB forribbed slab m2 5760
5 Finishing work
5.1 EGA 500 roof cover having a thickness of 0.5mm m2 357
5.2 Gutter m
5.3 Down pipe m
5.4 skirting m
5.5 Floor finish m2 #REF!
5.6 Plastering wall including beam and column m 2
#REF!
5.7 painting wall including beam ,column &ceilling m2 #REF!
6 metal work
6.1 Door LTZ frame pcs 28
6.2 window LTZ frame pcs 25
6.3 A steair case m³
6.4 truss work kg
7 WINDOW AND DOOR WORKING
7.1 window ceilling m 132
7.2 glazing work for window & Door pcs 53
8 sanitariy instalation
diameter 40 mm cold water supply m 17
diameter 75mm pvc waste water pipe m 16
diameter 110mm pvc waste water pipe m 61
diameter 50mm pipe for waste water drainage m 120
Diameter 25mm pipe for cold water supply m 51
sammary of sanitary instalation
Plumbing Water Supply System
b) Dia 20 mm m 53
c) Dia 15 mm m 378
a) Gate valve pcs
Carried to Summary
9 ELICTRICAL INSTALATION WORK
Main distribution board pcs 13
Lightning
surface mounted single Flourecent fitting pcs 44
surface mounted double Flourecent fitting pcs 25
Switches
Recessed mounted double switch pcs 124
Recessed mounted single switch pcs 58
Socket
Recessed mounted single socket outlet pcs 168
Recessed mounted double secket outlet pcs 48
Electric Cable for Socket outlet and Ligthning
Supply and fix coper condute of 3×2.5mm 2 for all socket outlet lines. m 1296
diameter 6mm wire m 3609
sammery of electrical instalation