Check List For Siding Plans
Check List For Siding Plans
Check List For Siding Plans
The proposed ESP of sidings should be in conformity with latest provisions of Schedule of
Dimensions and IRPWM. The salient points in this regard are as below to be checked and
compliance/Reasons for non- compliance shall be given while submitting the proposals
Sr .Manager (Track)
5. Curve 5) Length of circular curve Complied
6) The desirable minimum straight length of 50 mComplied
should be provided between reverse curves for
resultant Degree of lead curve within the
allowable limit.
Sr .Manager (Track)
5) Existing Railway land boundary Black chain Complied
dotted.
16 Miscellane- 1) Speed of route. Complied
ous items 2) Direction of train movement i.e. UP & DN Complied
should be clearly indicated at appropriate
locations. Each line along with other yard lines
shall be shown separately in single firm line.
3) Proposed track structure in tabular form Complied
Sr .Manager (Track)
16. Miscellane-
ous items
Additional Items for L- section
1. Scale of plan (the detailed plans and sections should be drawn Complied
to a horizontal scale of 50 meter :1 cm. and vertical scale 5
meters : lcm)
Locations of All L.C. Gates, Bridges, Stations etc. to be Complied
2.
shown with their chainages.
3. Show complete curve details. Complied
4. Ruling gradient with curve compensation details. Complied
Complied
5. L-section related reference yard plan number if approved.
6. Notes & Legend for colour code. Complied
7. There should not be any level difference between existing NA
formation and proposed formation at obligatory points like LC
gates and yards in case of doubling projects.
8. On the plan should be shown in detail all features of the country Complied
within a distance of 100 meters on each side of the centre line of
Railway. The boundaries of different kinds of land use like
cultivation, forest, pasture, waste etc., should be marked on the
plan. In the alignment plan the centre line of the proposed line
should be indicated by full red line 0.8 mm thickness (para 453 of
Engg. Code)
Sr .Manager (Track)
10 On the section, the formation level should be shown by a red Complied
line, the ground line being
Black. If practicable, throughout each sheet the ground line and
formation should be
continuous i.e. without steps, or changes of datum, for long
length of steep ruling gradient it is advisable to incline and "step" Complied
the datum line (Para 458 of Engg. Code).
11 Longitudinal section and cross sections of the proposal siding Complied
should be shown to the scale on the proposal. In L- section,
details such as nomenclature of lines, cutting, filling, existing
and proposed formation levels and rail levels should be
indicated.
12 In case of proposals involving regarding of yard lines, separate Complied
plan with 'L' section of existing and proposed track shall be
prepared and will not be a part of ESP. However, reference to
the `L' section drawing shall be recorded in the ESP.
Sr .Manager (Track)