CMN.18.477 Smart Plant Documentation Ruwais NGL Train 3: From El.93 800 To Above LP Flare Piping Ga Plan Area TD Zone 736
CMN.18.477 Smart Plant Documentation Ruwais NGL Train 3: From El.93 800 To Above LP Flare Piping Ga Plan Area TD Zone 736
CMN.18.477 Smart Plant Documentation Ruwais NGL Train 3: From El.93 800 To Above LP Flare Piping Ga Plan Area TD Zone 736
NOTES
1 - ALL DIMENSIONS ARE IN MILLIMETERS
2 - ALL ELEVATIONS ARE IN METERS
3 - ALL COORDINATES ARE IN METERS
A 4 - DENOTE PLANT LIMIT A
PREVAILING WIND 5 - DENOTE ZONE LIMIT
6 - T.L. DENOTE TANGENT LINE EQUIPMENT
7 - T.O.C. DENOTE TOP OF CONCRETE
FGL-704372-1"-PA0BY-V
FGL-704355-1"-PA0BY-V
FGL-704356-1"-PA0BY-V
FGL-704346-1"-PA0BY-V
FGL-704345-1"-PA0BY-V
FGL-704371-1"-PA0BY-V
FGL-704370-1"-PA0BY-V
FGL-704369-1"-PA0BY-V
FL-704902-60"-EA1BY-V
FL-704901-60"-EA1BY-V
8 - T.O.S. DENOTE TOP OF STEEL
DISCLAIMER: THIS DOCUMENT IS THE PROPERTY OF ADNOC Gas Processing AND CONTAINS CONFIDENTIAL AND PROPRIETARY INFORMATION, THAT CANNOT BE COPIED OR REPRODUCED OR LENT, IN WHOLE OR IN PART, FOR ANY PURPOSE OTHER THAN THAT FOR WHICH IT IS SUPPLIED,
0.211% SLOPE
0.315% SLOPE
0.367% SLOPE
0.367% SLOPE
0.367% SLOPE
0.367% SLOPE
0.366% SLOPE
0.366% SLOPE
0.365% SLOPE
0.365% SLOPE
9 - T.O.G. DENOTE TOP OF THE GRATING
10 - B.O.E. DENOTE BOTTOM OF EQUIPMENT
11 - B.O.P. DENOTE BOTTOM OF PIPE
12 - C.L. DENOTE CENTER LINE (FOR SLOPED LINE)
13 - DENOTE GENERAL ELEVATION
14 - H.P.P. ELEVATION EL.100.000 IS EQUAL TO EL.10.800
JEBEL DHANNA CHART DATUM
15 - FOR ABBREVIATION. SYMBOLS. APPLICABLE STANDARDS
B B
CONSTRUCTION DETAILS REFER TO DRG 5229-00-SD-3360 sh. 1
87 127
102 134
111
108
137
478 13820 1224 3172 16 - FOR BARE STAINLESS STEEL PIPE PUT A STAINLESS
STEEL BAND ON THE BEAMS. REFER TO PAR. 7.1
OF SPEC. 5229-00-LA-3130
MATCHLINE N. 2670222000 FOR CONTINUATION SEE DWG. 5229-07-LD-3862 SH-4 MATCHLINE N. 2670222000 FOR CONTINUATION SEE DWG. 5229-07-LD-3862 SH-3 17 - FOR SUPPORT ON PIPE RACK SECONDARY BEAM (ALL
LINES WITH A NSD< 4" AND ALL INSULATED STAINLESS
STEEL LINES WITH A NSD< 6") SEE PAR 7.2 OF SPEC.5229-00-LA-3130
10511
10571
10570
10513
10509 10572
MATCHLINE E. 675198000 FOR CONTINUATION SEE DWG. 5229-07-LD-3861 SH-2
D D
10553
10576 DRAWING NUMBER TITLE
10579 10578
5229-07-LD-3860-1 PIPING GA KEYPLAN AREA TD
10575 10580 LP FLARE ZONE 735-736
13650
E E
MATCHLINE E. 675217500
10506 KEYPLAN
10561
16303
10553 10510
10512 10549
10501
10502 10508
10557
F F
70
FO
3062B
10527
10524 10523
G G
WITHOUT THE EXPRESSED AUTHORITY OF ADNOC Gas Processing, P. O. BOX 665, ABU DHABI, UAE.
THIS DRAWING
10532 10536 10522 10554 10562
N. 2670208350
2
70
PG
3068 FGL-701015-2"-EA1BY-V
1263
10525 10526 BOP 94989
70
10583 1 0 1 2 3 4 5
FO
10539
3062A 10545 10541 10563 10543 10547 10555
N. 2670206850
237
1:50 METRES
1
10538 10528 10534 10558 10559
10582
H
10564
1850
5 06-JAN-22 CMN 18.477 SP CONV. PROJ ST NR SMS
H
FGL-704353-2"-EA1BY-V
4 07-DEC-09 AS BUILT GB BM BM
BOP 94987
697
I
PROJECT TITLE I
N-701033-2"-CA1BY-V
FGL-701016-2"-EA1BY-V
FL-662039-60"-EA1BY-V
IA-705466-2"-PA0BY-V
0.200% SLOPE
E. 675202900
E. 675208100
E. 675213300
BOP 96530
BOP 97430
0.200% SLOPE
CMN.18.477
Smart Plant Documentation Ruwais NGL Train 3
DRAWING TITLE
B C D PIPING GA PLAN AREA TD ZONE 736
FROM EL.93 800 TO ABOVE LP FLARE
J
UNIT: 70 J
PLANT: NGL TRAIN 3