THIS CONSTRUCTION AGREEMENT is executed at ______ on this ______ day of ______ 2007
BETWEEN
A s/o B resident of ______ (hereinafter referred to as “the Owner”, which expression shall unless
repugnant to the context or meaning thereof, be deemed to include his heirs, legal
representatives, executors and administrators) of the ONE PART
AND
M/s XYZ Constructions, a registered Partnership firm having its registered office at ______
(hereinafter referred to as “the Contractors” which expression shall, unless repugnant to the
context or meaning thereof, be deemed to include its successors and assigns) of the OTHER PART.
WHEREAS the Owner is desirous of constructing Plot and its vacant land bearing Plot No.
______. Survey No. ______ Khasra No. ______ situate, lying and being at ______ Tehsil and District
______ (hereinafter referred to as “the said property”) and the contractors have offered to construct
the same and also prepare the site layout plans, preliminary sketch designs, architectural drawings,
structural drawings, service drawings and all other detailed plans and drawings as may be
necessary for the proper construction and completion of the said works and also obtain necessary
permissions from the Municipal Corporation ______ and other local authorities for executing and
completing the said works as hereinafter specified upon and subject to the terms and conditions
set forth herein and the conditions set forth in the special conditions hereto annexed and marked
as Annexure 1 (all of which are collectively hereinafter referred to as “the said works”) at the rate of
Rs ______ per sq. ft. of the built up area of the buildings (hereinafter referred to as “the said
contract amount”).
AND WHEREAS The Owner has agreed to appoint the contractors for the said works; and
AND WHEREAS the contractors have requested the Owner to execute these presents which he
has agreed to do so.
Now this agreement witnesseth as follows:
1. In consideration of the said contract amount to be paid at the times and in the manner set
forth in the Schedule of Payments hereto annexed, the contractors shall on and subject to
the said conditions, execute and complete the said works more particularly described in
Schedule 1 annexed hereto and shown on the said drawings, strictly in accordance with the
general specifications annexed hereto and marked as Annexure III.
2. The Owner shall pay the contractors the said contract amount or such other sum as shall
become payable at the times and in the manner specified in Annexure II.
2.