Nothing Special   »   [go: up one dir, main page]

Construction Technology Slides

Download as pdf or txt
Download as pdf or txt
You are on page 1of 17

Presentation.

Construction
Technology & Methods

MAYESHA ASFAR 110057428


▪ INTRODUCTION

▪ DIAGRAMS

▪ CONSTRUCTION DETAILS

▪ CONSTRUCTION PHASE

▪ ADVANTAGES AND DISADVANTAGES


OF THE TWO MAJOR MATERIALS USED

▪ SUSTAINABLE FEATURES

▪ IMPROVEMENTS

CONTENT
○ Project Name: Masjid Raja Haji Fi Sabilillah, Cyberjaya
○ Location: Cyberjaya, Selangor, Malaysia
○ Completion Date: November 2015
○ Site Area: 70,819.99 square metres
○ Gross Floor Area: 11,158.36 square metres
○ Building Height: 2 storeys
○ Client/Owner: Jabatan Agama Islam Selangor; Cyberview Sdn Bhd
Masjid Raja Fisabilillah
○ Architecture Firm: ATSA Architects Sdn Bhd Cyberjaya
○ Principal Architect: Ar Azim A. Aziz Green Mosque in Selangor

○ Interior Design Firm: ATSA Architects Sdn Bhd


○ Civil & Structural Engineer: Ingeniur Bersekutu Introduction & Details

Contoso Ltd.
• The principal mosque of
Cyberjaya, a city located 30
km north of Kuala Lumpur
International Airport

• Constructed in 2006 and


named after the former
Crown Prince of the Johor-
Riau, Raja Haji Fisabilillah
ibni Daeng Chelak.

• Capacity of up to
8,300 people

Contoso Ltd.
INTERIORS & EXTERIORS

Contoso Ltd.
FACILITIES

• Main Mosque Building


• Administration Office
• VIP Lounge
• Classroom
• Food Preparation & Dining
• Ablution & Toilets
• Travellator
• Multipurpose Hall
• Staff Quarters
• Indoor Courtyard
• Outdoor Plaza

Contoso Ltd.
SITE PLAN

• Following to the platinum rating of the


green building index (gbi) standard

• The building incorporated recyclable


materials and energy-efficient equipment
. Following
to the Platinum rating of the Green Building Index• (GBI) standard
Minimize energy use and maintenance
costs.

• The design also leaves space for future


development, such as a playground.

• Its large parking area can also be used for


bazaars.

Contoso Ltd.
PLANS

Contoso Ltd.
ELEVATIONS & SECTIONS

Contoso Ltd.
CONSTRUCTION PHASE

1 3

Formworks are assembled and reinforcements


are placed before pouring concrete for floor slab. Curing Concrete and Removing Formwork
Phase

2 4

Interior Construction Formwork Post Vertical Construction Phase


Contoso Ltd.
5 7

On Site Dome Construction


Post First Floor Completion Phase

6 8

Solar PV
Module
Installation
over
Flat Roof
Steel
Exterior View Trusses.. Contoso Ltd.
MATERIALS USED

Timber
Steel Concrete

Contoso Ltd.
E Glass Panel
ADVANTAGES AND DISADVANTAGES
OF MATERIALS USED

CONCRETE

Advantages of Concrete Disadvantages of Concrete

• Availability. • The tensile strength of concrete is


• High strength. relatively low.
• Low cost. • Concrete is less ductile.
• The durability is very high. • The weight is high compared to its strength.
• Can be cast to any desired shape. • Concrete may contains soluble salts.
• Easy maintenance. Soluble salts cause efflorescence.
• High fire resistant.
• Withstand high temperatures.
• Resistant to wind and water.

Contoso Ltd.
ADVANTAGES AND DISADVANTAGES
OF MATERIALS USED

STEEL

Advantages of Steel Disadvantages of Steel

• Stiff per mass Dense, heavy.


• Strong per mass Needs coating to prevent corrosion
• Cheap, for a metal Maintenance cost is high.
• Abundant Low fire resistant
• Recyclable Cannot be mold into any desired shape.
• Very manufacturable. Loses ductility property
• Ductile and malleable.

Contoso Ltd.
SUSTAINABILITY

GREEN BUILDIN INDEX (GBI) FEATURES

• Rainwater harvesting system


• Maximizing natural ventilation system
• VRV air-conditioning system
• LED lighting
• Low E-Glass panel
• Water saving features
• ‘Grasscrete’ surface reduce heat.

Contoso Ltd.
SUSTAINABILITY

• Analysis Age of the materials used • Workmanship Improvement

• Regular Inspections by • Making Concrete Weatherproof


Architects/Surveyors
• Avoid corrosion from Steel
• Check any signs of fungal and termite
attacks in Timber • Right Selection of Timber

• Securing the general • Seasoning, treating and painting of the


structural(Foundation, Roof etc.) stability timber to prevent from early weather
and life of the building action

• Rooftop cleaning to avoid dust and rubbish

Contoso Ltd.
Thank You
Mayesha Asfar
110057428
mayesha.asfar99@gmail.com

You might also like