ESD-JBA-6101A ESD-JBD-6101A PCS-JBF-6101A
MSA-6101A MSD-6101A-1 MCF-6101A-1
MSD-6101A-2 MCF-6101A-2
846.700
MSA-6101B MCF-6101C
MSD-6101B-2 MCF-6101B-2
C.R.
ESD-JBA-6102 ESD-JBD-6102 PCS-JBF-6102 JBP-6102
MSD-6102-1 MCF-6102-1
MSA-6102 MSD-6102-2 MSP-6102
MCF-6102-2
MSD-6102-3
847.220
846.700
MULTIPARES - ITU
C.R.
C.R.
INGRESO PRINCIPAL
MSD-7101-1
E
MSA-7101 MCF-7101
V-190 SERVICE AIR
RECIEVER FOUND.
MSD-7101-2
14.12
(COMP. # 804222) SEE DWG.
I-DE-7050.35-1231-120-DHM-004
4
-1
CP
CP-12
AE-4
V-2901 V-901
COMPRESSOR C-520 FOUNDATION
(COMP. # 806496) SEE DWG.
I-DE-7050.35-1231-120-DHM-005
AE2
V-2920 V-2902
AE-1
COMPRESSOR C-508 FOUNDATION
(COMP. # 804226) SEE DWG.
I-DE-7050.35-1231-120-DHM-004
SALA-TABLEROS
ALMASENAJE DE AGUA
Cap= 15347 BBL
TK 934 TK 930
POTABLE WATER WATER STORAGE
STORAGE TANK TANK
Cap= 20 m ³ Cap= 34 m³
VIA DE CIRCULACION VEHICULAR
BOMBEO 1%
TK 932
N.T.N
834.850
(REF.)
TREATED
Cap= 30 m ³
VIA DE CIRCULACION VEHICULAR
BANDEJA
NOTAS
CASETA
PORTA CABLE
Calles
TK2932
TREATED
Cap= 30 m³
Calles
(COMP. # 77884) SEE DWG.
846.700
I-DE-7050.35-1231-120-DHM-005
o
C.R.
in
TK 920
am
FIRE WATER
C
STORAGE TANK
Cap= 1141 m³
do
la
al
m
En Calles
C
F-306 DISCHARGE FILTER
FOUNDATION (ITAU), SEE DWG.
PL
Calles
PL PL PL PL PL PL PL PL PL
834.900
(REF.)
N.T.N.
V-2910
V-910
8 PL PL PL PL PL PL PL PL PL PL
9
837.360
(REF.)
N.T.N.
7 Camino de Acceso
6
C-591 AIR COMPRESSOR SKID
CAMARA
G CONFORME A OBRA 28.08.19 J.H.L. M.F. L.C.
TIPO 2
V-191-B FOUND.
TK-204
V-191-C FOUND. D PARA APROBACION 02.02.15 J.L.G. E.G. G.C.
270°
V-190-A FOUND.
10 C PARA APROBACION 20.12.14 J.L.G. E.G. G.C.
90°
CANAL DE DRENAJE 0.5% PSOL JB
BJB
C-6
TK-208
a
3
da
C-7
270°
TK-210
5 allad
o
DE
0 EMISION ORIGINAL 03.10.14 J.L.G. E.G. G.C.
AL O
CAN AMIENT
TANK FARM FOUNDATION
90°
ON
COR REV. DESCRIPCION FECHA EJEC. VERIF. APROB.
4
TK-206
0°
LAS INFORMACIONES DE ESTE DOCUMENTO SON PROPIEDAD DE PETROBRAS BOLIVIA S.A., SIENDO
2
315°
90°
TK-205
0°
TK-214
PE-5I3-00004 - ANEXO A - PADRONIZADO POR LA NORMA PETROBRAS N-0381 REV.G - HOJA 17
90°
ARCHIVO : ACAD / V. 2010 / E-DE-7050.35-1231-942-UAC-101=F.dwg
CONTRATO:
TK-212
180°
270°
TK-213
PEB-AJUR-98/2014
SERPETBOL Ltda.
RESP. TECNICO:
TK-209
PEB/STO/PMI
RAMP UP
CLIENTE:
C.D. C.I. C.I.
C.I.
PROYECTO:
AREA:
846.700
SALIDA DE
C.R.
F
F-306 DISCHARGE FILTER
FOUNDATION (ITAU), SEE DWG.
SIMBOLOGIA
ITU X1 PO BM-002
NOTAS
V-191-A FOUND.
90°
V-191-B FOUND.
TK-204
V-191-C FOUND.
270°
V-190-A FOUND.
90°
C
C-6
TK-208
C-7
270°
TK-210
TANK FARM FOUNDATION
90°
TK-206
0°
31
5°
270°
90°
TK-205
0°
TK-214
90°
PEB/STO/PMI
RAMP UP
CLIENTE:
C.D. C.I. C.I.
C.I.
AREA:
ESCALA HOJA
S/E 02 de 04
FECHA
A-1
841 mm x 594 mm
03/10/2014 E-DE-7050.35-1231-942-UAC-101
BOMBEO 1%
G H I J K L M N
DOCUMENTOS DE REFERENCIA
SIMBOLOGIA
NOTAS
PEB/STO/PMI
CLIENTE:
AREA:
SIMBOLOGIA
´
´
´
NOTAS
PEB/STO/PMI
CLIENTE:
AREA: