Basic Knowledge in Construction Management

Download as pdf or txt
Download as pdf or txt
You are on page 1of 32

Basic Knowledge

in
Construction Management
Objective

To meet the Specified Quality with the

systematic documents applying the basic

document according to procedure and

responsibility
Construction Management Approach
(International Construction Industry)

Client
Construction
Management
Service
Contract Design

Designer Consultant

Contract Complete
Agreement Work

Contractor
Construction Management Approach
(Local Construction Industry)

Client

Design

Tender
DOH
Committee,
Designer
Internal QC,
Complete
Third party QC,
Contract
Agreement Work etc

Contractor
Quality Management System

within budget

SAFETY

finish intended meet drawing &


completion date specification

Input Process Output


Total Quality Management

Total Quality Management (TQM) is a management technique based on the


idea that all “employees continuously improve their ability to provide on-
demand products and services that customers will find of particular value.”

Employee Customer Continuous


Benchmarking
Involvement Sastifaction Improvement

focuses on managing the total organization to


deliver quality to customer
Project Development Cycle Strategic Plan
• Long Term Plan (30-years plan)
• Short Term Plan (5-years Plan)
• Annual Plan
Post Evaluation • National Development Plan
• Project Performance • Sectoral Plan
• Network Performance • Regional Plan
DOH Project Plan
• Long Term Plan (30-years plan)
• Short Term Plan (5-years Plan)

Maintenance
• Preventive
• Routine Maintenance • Project Appraisal
• Corrective • Project Priority
• Periodic Maintenance
• Special Maintenance and
Rehabilitation
• Preliminary Design
• Emergent Maintenance
• Detail Design
• EIA, IEE, EMP (if required)

Budget Approval
Financing Scheme

Operation
• Traffic Management Construction
• Road Safety Management • Land Acquisition
• Law Enforcement (Speed, Access Control, ROW) • Procurement
• Roadway Inventory Management • Construction
How to prepare / implement our projects?

Planning Construction

• Strategic plan • Pre-construction


• Budget appraisal • During construction
• Design stage • Close out stage
• Budget approval
• Tendering stage
Content
Design Stage

1 Preparation for Procurement of small works


1.1 Geometric Design
1.2 Pavement Design
1.3 Drainage Design
1.4 Road Safety Design
1.5 Quantity Calculation (Bill of Quantity (BOQ) ၊ Unit Price
Analysis (UPA)) / Lump Sum
1.6 Cost Estimate
1.7 General Specification
1.8 Bidding Documents
Tendering Stage
2 Bid Announcement
3 Site Orientation
4 Pre-Bid Meeting
5 Submission of Bid
6 Evaluation for Technical Proposal
7 Opening of Price bid
8 Evaluation for Financial Proposal
9 Issue Letter of Acceptance (LOA)
10 Contract Signing
11 Signing the Handover for Possession of Site
12 Issue Notice to Proceed
Construction Stage
Pre-Construction
13 Pre Kick-off meeting / kick off meeting
14 Submittals
14.1 Construction Schedule
14.2 Method Statement
14.3 Organization Chart
14.4 Manpower schedule
14.5 Equipment Utilization schedule
14.6 Cash flow and payment schedule
14.7 Traffic Management Plan
14.8 Safety and Health Management Plan
14.9 Field office and Site Layout Plan
14.10 Joint Survey (As stake survey)
14.11 Shop Drawing
14.12 Material approval
14.13 Mix design approval
14.14 Trial Test Section
During Construction
15 Progress Meeting
16 Reports
16.1 Monthly Progress Report
16.2 Environmental Management Plan
16.3 Safety Petrol Report
16.4 Quality Control Report
17 Progress billing (Advance Payment, Interim Payment)
18 Project Log Book (Site Diary)
19 Site Instruction and Register
20 Progress Inspection
21 Workmanship Inspection
Close-out Stage
22 As Built Drawing
23 Pre Final Inspection/ Final Inspection (After (100%) work
completed)
24 Issue Taking Over Certificate
25 Final Payment
26 Maintenance works During Defect Liability Period (DLP)
27 Pre Final Inspection/ Final Inspection (After DLP)
28 Issue Defect Liability Certificate (DLC)
29 Issue Performance Guarantee
COMMUNICATION PROCESS
GUIDE
Contents

• Define Role and Responsibility


• Submission From The Contractor
• Responses By Project Manager
DEFINE ROLE AND RESPONSIBILITY
DOH Head
Office
ROLE RESPONSIBILITY
assign

Director assign Project Director

Assistant Director/
Project Manager
Deputy Director

Staff Officer Project Engineer

QC Engineer QC Engineer
SUBMISSIONS FROM THE
CONTRACTOR
Submission to the PM

Submittals DOH
All submittals required/implied in The
the Specifications Project Director
Contractor
Program

Monthly Progress Report


Project Manager
As-built Plan

Guarantee

Project Engineer

TO
CC
RESPONSES BY PROJECT
ENGINEER
Basic Response to Submittals in Contract
Comment/Instruction/Approval by
Conditions
the Project Manager on:

Proposal of Replacement of key The


Personnel
DOH Contractor

Approval on Design Documents of Project Director


Temporary Works

Safety and Health Management


Plan and Project Manager

Detailed Report of an Accident


comments
Notification of Discovery
Project Engineer
…etc.

TO
CC
Basic Response to Submittals in Contract
Conditions
Comment/Instruction/Approval by
Project Engineer on:
The
Proposal of Material Source DOH Contractor
Equipment Plan
Project Director
Traffic Management Plan

Mobilization Schedule

Construction Safety and Health Project Manager


Programme
Shop Drawings

…etc. Project Engineer


Draft Monthly Progress Report

QC Engineer
TO
CC
Submittals in
Quality Control Report

The Contractor
DOH
Note:
Project Director
Contractor shall submit M/S.
DOH shall issue ITP & Check
NCR
form. Project Manager
QC Engineer shall report
Monthly QC report and shall
submit daily result to Project Project Engineer
Engineer and contractor. If
has non complyed the QC Engineer

specification, QC engineer TO NCR


shall issued NCR. CC
Submittals in
Interim Payment
The Contractor
DOH

te
ica
Project Director

ti f
er
tc
approval, if

en
approved

ym
needed

pa

ll
Bi
Project Manager

im
Cl a
comments

Attached: Project Engineer

၁။အရည်အေသွးစစ်ေဆးမ]ေကာ်မတီ
QC Engineer
ေထာက်ခံချက်
၂။QC Report
Letter Numbering on JICA Loan
• From CSC
(1) Loan No.
– P17CS/DOH/Lxxxx (2) Originator
(1) (2) (3) (4) (3) Outgoing Entity
(4) Serial Number

• From DOH
– P17DOH/CS/xxxx
(1) (2) (3) (4)

• From Contractor (1) Lot Number


(2) Abbreviation of the Contractor
– DOH-01A/GC-ENG/xxxx Company’s Name
(1) (2) (3) (4) (3) Outgoing Entity
(4) Serial Number
6,491,668,109.93

Recommended Letter Numbering


Township-xx-xx/xxx/xxx/xxxxx (1) Township
name+Lot+Originator
(1) (2) (3) (4) (5) (2) Outgoing Entity
(3) Type of documents
• The Assistant Director (Civil)(PM) (4) Fiscal Years
(5) Serial Number
– TGO-01-AD(PM)/Co.,LTD/MS/2020-21/xxxx

• The Staff Officer (Civil)(PE)


– TGO-01-PE/PM or Co.,LTD/MS/2020-21/xxxx

• The Contractor
– TGO-01-Co.,Ltd/PM or PE/MS/2020-21/xxxx
Categorization of Documents Control

No. Code Types of Document/Project Phases


I Pre-Contract Stage: (Planning, Conceptual design,
Detail design, Bidding)
1 CD Conceptual Design documents
2 TOR Terms of Reference
3 BI Bidding Invitation
4 PS Proposal
5 BE Bidding Evaluation
6 Others
Categorization of Documents Control (Cont.)
No. Code Types of Document/Project Phases
II Contract stage: (Temporary Works, Permanent Works,
Construction Supervision)
1 PD Procedure (Quality procedure)
2 WI Work Instruction
3 IR Inception Report
4 PR Progress Report
5 DR Design Report
6 MT Measurement Sheet
7 MM Minutes of Meeting
8 PN Plan (Quality plan)
9 PO Purchase Order
10 OT Request for Overtime Supervision
11 IN Invoice
12 SI Site Instruction
13 RFC Request for Change
Categorization of Documents Control (Cont.)
II Code Types of Document/Project Phases: (Temporary Works,
Permanent Works, Construction Supervision)
14 MS Method Statement
(Civil/Architectural/Electrical/Mechanical work)
15 FM Form
16 FR Final Report
17 DW Drawings (not related to Design Submission)
18 CS Calculation Sheet
19 BQ Bills of Quantities
20 TR Testing Report
21 VO Variation Order
22 RQ General Requisition Form
23 RV Request for Vehicle
24 RT Receipt
25 QC Quality Control Report
26 CVI Confirmation of Verbal Instruction
Others, if any.
Categorization of Documents Control (Cont.)

No. Code Types of Document/Project Phases:

III Pos-Contract Stage:


1 TS Testing
2 CM Commission
3 OM Operation & Maintennan manual
4 DL Defect Liability period
5 Others