ECS 1-1-3 - 4 - 800e59c4
ECS 1-1-3 - 4 - 800e59c4
ECS 1-1-3 - 4 - 800e59c4
DRAWING STANDARDS
Page 1 of 33
Revision 4 Memo
Changed 2.6.2 Added P for Miakeri
Oct\2007
FEB 2009 Changed 2.6.2 Added T for Timbre, Revised Table 2 – to align Manifold designations with
currently installed units.
May 2010 Changed Table 2 to add new manifolds
ESSO EXPLORATION &
PRODUCTION CHAD INC.
ECS 1-1-3
DRAWING STANDARDS
Page 2 of 33
TABLE OF CONTENTS
GENERAL...............................................................................................................................................3
PIPELINE DRAWINGS...........................................................................................................................22
TABLE 1 .................................................................................................................................................3
FIGURE 1................................................................................................................................................5
TABLE 2 .................................................................................................................................................7
TABLE 3 .................................................................................................................................................12
TABLE 4 .................................................................................................................................................14
ATTACHMENT 1 ....................................................................................................................................25
ATTACHMENT 2 ....................................................................................................................................26
ATTACHMENT 3 ....................................................................................................................................27
ATTACHMENT 4 ....................................................................................................................................28
ATTACHMENT 5 ....................................................................................................................................29
ATTACHMENT 6 ....................................................................................................................................31
ATTACHMENT 7 ....................................................................................................................................32
DRAWING STANDARDS
Page 3 of 33
SCOPE
1.1 This specification covers mandatory requirements governing the minimum information
to be shown on drawings, drawing sizes and format of the following drawings for the
Chad Doba Development Project:
1.3 A pound sign (#) indicates that ESSO review/approval is required before design is
finalized or equipment is purchased.
GENERAL
2.1 Table 1 lists the standards which shall be used with this specification.
2.2 The equipment and materials used shall conform to the latest editions, revisions and
addenda of the codes, standards and regulations listed in Table 1.
TABLE 1
DRAWING STANDARDS
Page 4 of 33
Drawing Sizes
2.3.3 The "E" size drawings (34" x 44") are allowed only upon ESSO's approval.
2.3.4 Metric size drawings (A0, A1, A2, A3, A4 and B1) are allowed only upon ESSO's
approval.
Lettering
Title Block
2.5.1 The title block lettering shall be 5 or 6 mm high for board drawings and 4 mm high for
CADD drawings (D size). See Figure 1 for typical title block layout.
ESSO EXPLORATION &
PRODUCTION CHAD INC.
ECS 1-1-3
DRAWING STANDARDS
Page 5 of 33
ESSO EXPLORATION
AND DEVELOPMENTCHAD INC.
CHADDEVELOPMENT PROJECT
FIELDLOCATIONANDFACILITY DESCRIPTION
AREAORSYSTEMS DESCRIPTION
DRAWINGDESCRIPTION
SCALE EEPCDRAWINGNUMBER REV
CONTRACTOR’S NAME NTS
FIGURE 1
TYPICAL TITLE BLOCK LAYOUT
ESSO EXPLORATION &
PRODUCTION CHAD INC.
ECS 1-1-3
DRAWING STANDARDS
Page 6 of 33
Drawing Numbering
2.6.1 The drawing number will take the following general format:
[Area]-[Subdivision]-][Discipline and Drawing Identifier]-[Serial Number]
2.6.2 The document code is defined as follows:
DRAWING STANDARDS
Page 7 of 33
• For each field Manifold Site, the designations listed in Table 2 shall be used
for BBB.
TABLE 2
Field Manifold Designation
DRAWING STANDARDS
Page 8 of 33
DRAWING STANDARDS
Page 9 of 33
2.6.4 Additional values of DD for the Discipline and Document Identifier shall be added as
required following approval by ESSO.
Revision Numbering
2.7.1 The Contractor shall develop a drawing revision numbering procedure suitable for the
project, to be approved by ESSO.
CADD Standards
2.8.1 ECS 1-1-4 describes the formats and general structure that must be used in preparing
all CADD drawings.
3.1 P&IDS are to be laid out using the "D" size format. The bottom zone is reserved for
rotating equipment and their respective identification information. The middle portion
contains all of the other equipment as well as their associated lines. The top zone is
reserved for the identification information of all the equipment located in the middle zone
of the P&ID. The middle zone of the drawing is the "pipe alley" containing lines which
enter and leave the sheet, plus lines running between rotating equipment and other
pieces of equipment on the drawings.
3.2 The left and right margins of the drawings will have arrows at the end of the pipe alleys
for match line drawing number identification, in which the connecting drawing number
will be indicated.
3.3 Notes that apply to a P&ID are located in the upper right hand corner of the P&ID sheet;
this area is to be left open for this purpose.
3.4 On all Utility Distribution P&IDs, the header and sub-headers shall follow the layout of
pipe racks. This layout (not to scale) shall indicate all areas, equipment and individual
branches in their relative geographic locations.
Lines
3.5.1 Primary lines shall be drawn "heavy" and secondary lines shall be drawn "light".
Secondary lines shall be broken to cross primary lines. Horizontal lines shall be broken
to cross vertical lines of equivalent weight. Instrument lines shall be broken when
crossing piping. The P&ID shall be logically arranged to minimize crossed lines.
ESSO EXPLORATION &
PRODUCTION CHAD INC.
ECS 1-1-3
DRAWING STANDARDS
Page 10 of 33
3.5.2 Generally, all process lines entering and leaving the diagram shall terminate at the left-
hand or right-hand end of the pipe alley with an arrow box. The connecting drawing
number shall be shown in the arrow box. Whenever possible, a line should appear at
the same position in the pipe alley on adjoining diagrams.
3.5.3 The full line number will be shown on top of the line entering or leaving a drawing. The
service (stream) description and origin/destination will be shown on top of the arrow
boxes entering or leaving the drawing. If the origin/destination is an equipment or
instrument item, show the equipment or instrument number and name. If the
origin/destination is a line, only the process/utility designation, unit designation and
numerical identification need be shown. Line numbering shall be as per ECS 1-1-2.
3.5.4 All utility lines entering or leaving the P&ID shall terminate at any convenient location on
the diagram with a utility service diamond. The utility code is to be indicated outside the
diamond and the connecting utility distribution diagram number is to be inside the
diamond.
Equipment
3.6.1 Equipment shall be drawn in good overall proportion even though they are not
drawn to a fixed scale. P&IDs shall have no more than three major pieces of equipment
per drawing sheet, unless approved by ESSO.
3.6.2 Rotating equipment item numbers and names appear below the equipment base line
with the item number duplicated on or near the equipment at its location on the diagram.
Indicate train designation within each unit (i.e. A, B, C).
3.6.3 Other equipment item numbers and names appear across the top of the diagram with
the item number duplicated on or near the equipment at its location on the diagram.
Indicate train designation with each unit (i.e. A, B, C).
Instrumentation
3.7.1 Instrument interconnection from sheet to sheet shall terminate at any convenient location
with the continuation description and drawing number indicated.
3.8.1 The P&IDs shall include the information per Table 3, as the minimum requirement.
3.9.1 All Legends and Symbols are in accordance with the P&ID Standard Legend Drawings
shown below:
DRAWING STANDARDS
Page 11 of 33
DRAWING STANDARDS
Page 12 of 33
TABLE 3
DRAWING STANDARDS
Page 13 of 33
ELECTRICAL DRAWINGS
4.1 All Legends and Symbols are in accordance with the Electrical Standard Legend
Drawings shown below:
Drawing No. 7400-G000-90D0-0002 "Plot Plan and Layout Symbols" (See Attachment 7)
4.2 All abbreviations, symbols and device designations not covered by Standard Legend
Drawings shall be as per IEEE.
Drawing Numbers
4.3.1 Drawing numbering shall be as per par. 2.6.1 to 2.6.4. The serial number series shall be
as follows:
DRAWING STANDARDS
Page 14 of 33
4.4.1 Single line diagrams shall include information as shown on Table 4 as a minimum
requirement.
TABLE 4
Information To Be Included On Single Line Diagrams
Equipment/Device Identification Information Details Example
Generators GE TAG Number. D500-GE-001
Rating (MVA). 15 MVA
Voltage (kV). 11 kV
Power factor (PF). 0.8 PF
Transformers TNS Tag Number. D500-TNS-001
ONAN/ONAF Rating (MVA). Primary/Secondary 15/20 MVA
Voltage (kV). Impedance (%). 66/11 kV
Z = 6%
Circuit Breakers BKR Tag Number. D500-BKR-001
(Power) Continuous Current Rating (A). 1600 A
Short Circuit Interrupting (kA). 40 kA
Circuit Breakers BKR Tag Number. D500-BKR-002
(Molded Case) Trip Setting Percentage of Continuous Current 250 AT
Rating (AT).
Frame Size (AF). 250 AF
Switchgears SGR Tag Number. D500-SGR-001
Continuous Current Rating (A). 1600 A
Voltage Rating (kV). 11 kV
Phases. Three phase
Frequency (Hz). 50 Hz
Short Circuit Interrupting Rating (kA). 25 kA
Motor Control MCC Tag Number. D500-MCC-001
Centers Continuous Current Rating (A). 2000 A
Voltage (V). 400 V
Phases. Three phase
Frequency. 50 Hz
Short Circuit Interrupting Rating (kA). 40 kA
Motors M Motor Size (kW) in Motor Symbol., 15 kW
Tag Number. D500-PM-001
Service Description. Crude Transfer Pump Motor
Potential PT Tag Number. D500-PT-001
Transformers Primary/Secondary Voltage (V). 11000-230 V
Quantity Required. (2)
Current CT Tag Numbers. D500-CT-001
Transformers Winding Ratio. Ratio 100:1
Quantity Required. (3)
Controllers Continuous Current Rating. 630 A
Medium voltage)
Motor Starters IEC/NEMA/EEMAC Size. Size 1
(Low voltage)
Grounding Resistors R Tag Number. D500-R-001
Continuous Current Rating (A). 100 A
Time Interval Rating. for 10 seconds
Grounding TNS Tag Number. D500-TNS-001
Transformers Primary/Secondary Voltage (V). 11000-230 V
(Distribution Type) Rating (kVA). 15 kVA
Lighting Panels LP Tag Number. D500-LP-001
Number Circuits. 24 CCT
Panel Description. Lighting Panel
Batteries BAT Tag Number. D500-BAT-001
Voltage Rating (V). 125 V
Ampere-hour Rating (AH) for 8 hours. 400 AH
Battery Chargers BC Tag Number. D500-BC-001
ESSO EXPLORATION &
PRODUCTION CHAD INC.
ECS 1-1-3
DRAWING STANDARDS
Page 15 of 33
Layout Drawings
4.5.1 Plot Plans shall be used as a base for all Electrical Layout Drawings and shall have
scales identified in par. 6.12.
c. Drawings shall include North Arrow, elevations when required, dimensions when
required, key plan on a small scale with shading identifying area of the drawing.
4.5.3 Area Classification Drawings shall be drawn as overlays to the Equipment Location
Plans (see par. 6.2.1 and 6.2.2).
5.1.1 Cause and Effect Drawings (Shutdown keys) shall follow the format indicated in
ECS 1-1-4.
ESSO EXPLORATION &
PRODUCTION CHAD INC.
ECS 1-1-3
DRAWING STANDARDS
Page 16 of 33
Logic Drawings
Standards
Plot Plans
6.1.1 Plot plans shall be drawn to scale as required to include an entire facility on one "E" size
or "D" size drawing.
a. 1:30
b. 1:50
c. 1:100
d. 1:200
e. 1:300
f. 1:500
g. 1:750
h. 1:1000
a. Each piece of equipment contained within the area with equipment identification
number. Packaged equipment will be identified by package number only.
6.2.1 Equipment Location Plans shall be drawn in 1:200, 1:100 or 1:50 scale. Scale bars shall
be included in all drawings drawn to scale.
ESSO EXPLORATION &
PRODUCTION CHAD INC.
ECS 1-1-3
DRAWING STANDARDS
Page 17 of 33
b. Utility hose stations, emergency shower and eyewash facilities, fire hydrants and
monitors.
e. Elevations shall be given for high point of grade, top of piperack steel, top of
dikes, centerline of elevated equipment, etc.
North Arrow
6.3.1 Facility North Arrow will be drawn in upper left corner with reference to True North, and
the deviation between Facility North and True North shall be given. Prevailing wind
direction shall also be shown. In equipment location plans, only the Facility North Arrow
shall be drawn. The Facility North Arrow shall point up or to the left.
Coordinate System
6.4.1 A coordinate system for each facility shall be established. A point shall be designated
as N 0.000 and E 0.000. This point shall be 30 m south and 30 m west of the south-
western intersection of the north-south and east-west fence line of the facility. All
coordinates are referenced to facility north and east, and not to True north. Reference to
UTM coordinates shall be given.
Elevations
6.5.1 Facility elevation EL 100.000 shall be established as the Top of Benchmark at N 0.000
and E 0.000. Reference to mean sea level shall be stated.
Piping Plans
6.6.1 Piping plans shall be drawn in scale using CADD. Drawing size shall be "D" size
(preferred) or "E" size.
ESSO EXPLORATION &
PRODUCTION CHAD INC.
ECS 1-1-3
DRAWING STANDARDS
Page 18 of 33
a. Plan, elevation and section details of all piping NPS 3/4 in. and larger sizes.
Piping NPS 3/4 in. to NPS 12 in. shall be drawn using single line method, piping
NPS 14 in. and larger shall be drawn double line.
d. Line identification on each line. (Line number, flow arrow, insulation symbol and
thickness, tracing and slope).
e. Pipe supports, shoes, guides, etc. (shown by symbol and support standard
number if required).
l. Drawing number of adjacent area plan views and other related views and typical
drawings.
DRAWING STANDARDS
Page 19 of 33
Piping Isometrics
6.7.1 Piping isometrics shall be drawn when and where necessary to facilitate field or shop
fabrication. Isometric drawings are to be "B" size and include a bill of materials. A
project master material description and number code list may be used, so that an item
"202", for example, represents the same material on all isometric drawings. Isometric
drawings shall be single line. Gasket thicknesses shall be included in dimensions. Each
isometric drawing shall show north arrow, one elevation, and two coordinates. Insulation
shall be shown. Hydrostatic test vents and drains shall be indicated.
7.1 The drawings covered in this section include, but are not limited to, grading and surface
drainage drawings; underground piping, (water, sanitary sewer) layout drawings;
foundation location plans; foundation detail drawings; structural steel layout and detail
drawings; architectural drawings (floor plans, elevations, section and details) including
finish, door and window schedules; fence details drawings; roadway drawings (alignment
sheets, profiles and cross-sections), etc.
Grading Drawings
7.2.1 Grading drawings shall show the whole site on one sheet, if possible, and be consistent
with maintaining legibility. Where the site grading cannot be contained on one sheet, the
total grading plan shall be shown on multiple sheets referenced to each other by
appropriate match lines.
c. Surface drains (ditches and swales) with their invert elevations and cross-
sections, if necessary.
d. Perimeter drains with invert elevations, slopes and type(s) of erosion protection, if any.
f. Building outlines and outlines of other major structures, equipment and facilities,
with top of foundation concrete elevations.
g. Roads with center line elevations and direction of cross-slope, side outlets to
ditches, type(s) of pavement, and radii of pavement.
h. Paved areas, with area limits, elevations, slopes and type(s) of pavement.
i. Areas with impermeable, sealing layers (extent, thickness and other details).
ESSO EXPLORATION &
PRODUCTION CHAD INC.
ECS 1-1-3
DRAWING STANDARDS
Page 20 of 33
l. Fence locations and type(s) of fencing, with vehicle and man gates.
Utilities Drawings
7.3.1 Underground utilities may be shown on separate utility drawings or may be incorporated
into the grading drawings if legibility permits or the extent of underground utilities is
minimal. Otherwise the following shall be as shown on separate underground utility
drawings:
a. Underground pipes for potable and utility water, with appropriate entry locations
into buildings and other tie-ins, with pipe diameter(s) and material description.
b. Sanitary sewer pipes, with manhole locations, invert elevations at inlets and
outlet of manholes, slope(s), diameter(s) and material description, as well as exit
locations from buildings, other tie-in points and entries into sewage treatment
facilities (mechanical/biological packages, septic tanks etc.).
c. Subsurface infiltration tile fields (leach fields) or other effluent disposal facilities,
with all necessary details.
d. Surface water drain pipes with catch basins, floor drains and manhole locations,
invert elevations at inlets and outlets of catch basins and manholes, slope(s),
diameter(s) and material description, as well as exit locations from buildings,
foundations and structures, other tie-in points and entries into oily water
separators.
Foundation Drawings
7.4.1 Foundation location plans and detail drawings shall show all foundations for buildings,
equipment and any structure. This includes, but is not limited to the following:
DRAWING STANDARDS
Page 21 of 33
Structural Drawings
7.5.1 Layout and location plans and structural detail drawings shall show all steel and
reinforced concrete structures. Structural drawings shall cover the following:
Architectural Drawings
7.6.1 Architectural drawings shall show layouts (floor plans) and details of all permanent
buildings above their foundations. This includes all permanently installed equipment and
systems such as:
a. Cranes.
b. Monorails.
c. Elevators.
d. Plumbing and sanitation.
e. Heating (if any), ventilation and air conditioning (HVAC).
f. Floor hoists.
g. Drive-over service pits for vehicle maintenance.
7.6.3 Architectural drawings shall be laid out so that floor plans are drawn in the bottom half of
the sheet and elevations in the top half. For example, by assuming the North arrow
points up, the South Elevation would be directly above the plan, the North Elevation
directly blow the plan, the East Elevation to the right and the West Elevation to the left of
the South Elevation. Sections may be shown in the remaining space on the drawings
sheet or on a second sheet.
ESSO EXPLORATION &
PRODUCTION CHAD INC.
ECS 1-1-3
DRAWING STANDARDS
Page 22 of 33
PIPELINE DRAWINGS
Field Maps
8.1.1 Field Maps show detailed geographical information for a given field or fields. These
maps including locations of all producing wells, reservoir boundaries, facilities, roads,
rivers, towns and villages, and major pipelines. In addition, the maps contain information
regarding topography and terrain, as well as location coordinates (UTM or latitude-
longitude).
8.1.2 The Field Map shall be laid out using a scale large enough to allow clear interpretation of
details. As such, non-standard paper sizes may be utilized as necessary and as
approved by ESSO.
Hydraulic Diagrams
8.2.2 Hydraulic diagrams shall be laid out using the "B" size format (8.5 x 11 in.). The area to
the right of the drawing shall be reserved for a legend and for notes. The remainder of
the page, aside from the title block, shall be reserved for the main portion of the drawing.
8.2.3 The major element of all hydraulic diagrams shall be a system schematic, which is a
sketch of the pipeline system, not necessarily to scale, but approximately spacially
correct. The system schematic may also display major landmarks, such as roads or
rivers, which are relevant to the design of the pipeline system. All wells, facilities and
landmarks shown in the system schematic shall be properly labelled, and all symbols
used shall be identified in the drawing legend. Symbols should be consistent with those
used in the overall field maps.
8.2.4 In addition, any information which is regarded by the originator as being essential for
proper interpretation of the diagrams shall be included as notes on the right hand side of
the drawing.
8.2.5 All hydraulic diagrams shall be categorized in one of two standard formats, as described
below:
DRAWING STANDARDS
Page 23 of 33
b. Type 2 Hydraulic Diagrams are more basic than Type 1 diagrams and shall be
employed when the number of separate design cases for a given pipeline system
exceeds five. Essentially, a Type 2 diagram contains only the common elements
described in par. 8.2.3 and 8.2.4. It shall not contain any physical or hydraulic
data. Physical and hydraulic data shall instead be summarized in a table in a
separate document. The table must contain a clear reference to the
corresponding hydraulic diagram, and vice versa. In this way, a single diagram
may correspond to several different hydraulic design cases.
Route Maps
8.3.1 Route Maps shall be produced using both the "B" and "D" size formats. The route maps
shall be linked together by a Key Index map for easy reference. Each route map shall
indicate the following:
a. A profile map.
b. A plan section map to a scale of 1:10000.
c. Centerline Right-of-Way chainage.
d. A land use strip based on information gained from the most current survey data.
e. A construction details strip indicating the pipeline right-of-way configuration, all
roads and water crossings, extents of buoyancy control and casings, etc.
f. A pipe specification strip which specifies the relevant information for the pipelines
within the right-of way.
ESSO EXPLORATION &
PRODUCTION CHAD INC.
ECS 1-1-3
DRAWING STANDARDS
Page 24 of 33
Alignment Sheets
8.4.1 Alignment sheets shall be produced on paper of size appropriate for the scale chosen
and approved by ESSO. The alignment sheets shall be indexed and referenced easily by an
overall key map for the gathering system.
a. Elevation profile.
b. Pipeline route plan.
c. Pipeline schematic (no scale).
d. Erosion, buoyancy and drainage control measures.
e. Land use.
f. Soil and terrain information.
g. Environmental mitigative control.
h. Construction details.
i. Pipe properties.
j. Other information (location plan, legend, notes, reference drawings).
Crossing Drawings
8.5.1 Crossing drawings shall generally be produced in the "D" size format. The following
elements shall be included as a minimum:
DRAWING STANDARDS
Page 25 of 33
NUMBERING ATTACHMENT 1
D0 Standard Plot/Site Site Prep. & Floor Plan Process Flow Process General Pressure Loop Standard Area Class Standard
Drawing Plans Grading Roof Plan Diagrams Flow Arrangement Vessels Diagrams drawing legends Drawings Drawing
Legends Elev. & Diagrams Drawings & indexes Legends &
Details Material Index
Select Diagr
D1 Drawing Equip. Beams & Door & Material 51 Piperack Storage Tanks Control Block Diagrams Fire Hazardous Single Line
Index Sheets Location Ditches Window Balance Material Arrangement Wiring Area Drawings Diagrams
Schedule Sheets Balance Drawings Schematics
Sheets
D2 Block Equipment Piling Lighting Plan Piping & 50 Isometric Heat Control Fire Protection
Diagrams Layout & Instr. Piping & Drawings Exchangers Wiring Equipment
Diagrams Instr. Termination Location Plans
Foundation Drawings
Locations Diagrams
D3 Drawing Key Building Foundation Air Cond. Hydraulic Spool Sheets Heaters & Equipment Fire & Gas Equipment
Plans Layout Plans & Ventilating & Diagrams Fired Cable Detection Layout &
Details Heating Equipment Schedules Layout & Details Location Plans Detail
D4 Topographic Roadways Structural Furnishings Route Maps Pipe Shoes & Pumps Logic & Block Grounding Overall Grounding
Surveys Plans, Elev. Layout & Restraints Diagrams Layouts & Fire Water Layout &
& Details Construct. Details Network Details
Drawings
D5 Sketches Sewage & Pipe Racks Finishing Alignment Stress Compressors Panels Cabling Logic & Block Lighting
Drainage & Misc. Schedule Sheets Sketches Drawings Diagrams Diagrams Layout &
Systems Supports Spring Detail Details
D6 Misc. U'ground Platforms, Color Crossing Tie-In Details Processing ESD & Power Layout & Power
Services Walkways & Schedule Drawings Equip. Shutdown Details Layout &
Ladders (River, Road (General) Keys Details
etc.)
D7 Fire Wellhead Material Vendor Instr. Schematic
Proofing Details Take-offs Drawings Installation Schematic & &
(Details) (Packaged Detail Interconnect Interconnect
Facilities) Drawings Drawings
D8 Misc. Demolition DCS Cable Cable,
Field Block Drawings System Cable conduit & Schedules Conduit &
Diagram Schematic Raceway Raceway
Schedules Schedules
D9 Maps Junction Box
(General) General Control Room Junction Box & & Connection
& Pipeline Arrangment Layout Connection Drawings
Roads U/G Piping Drawings
DA Heat
Typical Location Misc. Drawings Tracing &
Drawings Drawings Misc.
Drawings
ESSO EXPLORATION &
PRODUCTION CHAD INC.
ECS 1-1-3
DRAWING STANDARDS
Page 26 of 33
ATTACHMENT 2
PIPING AND INSTRUMENTATION DIAGRAM STANDARD LEGEND
PIPING COMPONENT AND INSTRUMENT LINE SYMBOLOGY
DRAWING NO. 7400-G000-50D2-0101
ESSO EXPLORATION &
PRODUCTION CHAD INC.
ECS 1-1-3
DRAWING STANDARDS
Page 27 of 33
ATTACHMENT 3
PIPING AND INSTRUMENTATION DIAGRAM STANDARD LEGEND
EQUIPMENT SYMBOLOGY
DRAWING NO. 7400-G000-50D2-0103
ESSO EXPLORATION &
PRODUCTION CHAD INC.
ECS 1-1-3
DRAWING STANDARDS
Page 28 of 33
ATTACHMENT 4
PIPING AND INSTRUMENTATION DIAGRAM STANDARD LEGEND
INSTRUMENT DESIGNATIONS AND SYMBOLS FOR P&IDs
DRAWING NO. 7400-G000-50D2-0102
ESSO EXPLORATION &
PRODUCTION CHAD INC.
ECS 1-1-3
DRAWING STANDARDS
Page 29 of 33
ATTACHMENT 5
PIPING AND INSTRUMENTATION DIAGRAM STANDARD LEGEND
EQUIPMENT ID LETTERS & LINE SERVICE DESIGNATIONS
DRAWING NO. 7400-G000-50D2-0100 & 0104
ESSO EXPLORATION &
PRODUCTION CHAD INC.
ECS 1-1-3
DRAWING STANDARDS
Page 30 of 33
DRAWING STANDARDS
Page 31 of 33
ATTACHMENT 6
ELECTRICAL STANDARD LEGEND
SINGLE LINE AND CONTROL SCHEMATIC SYMBOLS
DRAWING NO. 7400-G000-90D0-0001
ESSO EXPLORATION &
PRODUCTION CHAD INC.
ECS 1-1-3
DRAWING STANDARDS
Page 32 of 33
ATTACHMENT 7
ELECTRICAL STANDARD LEGEND
PLOT PLAN AND LAYOUT SYMBOLS
DRAWING NO. 7400-G000-90D0-0002
ESSO EXPLORATION &
PRODUCTION CHAD INC.
ECS 1-1-3
DRAWING STANDARDS
Page 33 of 33
5.3.1 Instrumentation Standard Drawings are provided in the Automation System addendum
provided in the Job Specification.
8.3.1 d. Land use strips shall be based on information gained from the in-country
survey carried out in May 1995 and 1:26000 aerial photographs.