CADANGAN PEMBANGUNAN SKIM PERUMAHAN KOMUNITI BERPAGAR

DAN BERKAWALAN (HAK MILIK STRATA) PRECINT 7-1 (PACKAGE 2) YANG


MENGANDUNGI 176 BUAH RUMAH PACEL 3 DAN PARCEL 4, DI ATAS
SEBAHAGIAN LOT 442195, MUKIM BERANANG, DAERAH HULU LANGAT,
SELANGOR DARUL EHSAN UNTUK TETUAN ECO MAJESTIC SDN BHD.
(Cold Water and Sanitary Plumbing Services)

Method Statement for Installation of Underground UPVC Soil


and Waste Piping

1.0 GENERAL

1.1 The use of UPVC pipes and fittings for underground soil and waste and vent
installation shall conform to design requirement of the contract specification.

1.2 The application of UPVC underground pipes and fittings for this particular project
in general is as followed:

a) Underground soil and waste piping from main stacks, sanitary fittings, and floor
gully to inspection chamber.

b) Underground soil and waste piping from Ground upwards floor toilet discharge
piping from sanitary wares, floor traps and gully traps to inspection chamber.

1.3 Site supervisor shall be responsible to carry out investigation of site condition and
ascertain the pipe route and quantities of pipe lengths and type of fittings required
for the installation.

1.4 All UPVC pipe and fittings shall conform to British Standard as tabulated below:

PIPE SIZE (mm dia) B.S.

32, 40 and 50 5255

75 4514

4660
100 and 150
Method Statement for Installation of Underground UPVC Soil
and Waste Piping

2.0 INSTALLATION OF UNDERGROUND UPVC PIPING

2.1 Check the approved construction drawing and prepare the piping, fittings and
relevant material to be used for a particular pipe work installation.

2.2 Confirm all sanitary wares roughing in measurement and exact location of floor
traps by referring to selected wares model specification and toilet enlarged detail
drawing. Peg all required location and marked out alignment of all piping route.

2.3 Calculate and set out the invert level and fall of pipe according to the approved
working drawing. Refer to existing floor slab and construction reference level line
set out at site as base of setting out of pipe invert level.

2.4 Excavate pipe trench according to route, which being pegged earlier. Width of
trench shall be sufficient for working space during piping installation.

2.5 After excavation completed, manually touch up base of trench, double check on
invert and gradient of trench. Ensure surface of trench is evenly flattened
thoroughly without hollow’s voids and foreign material.

2.6 Measure and cut pipes to be install to desired length. Remove burrs on cut pipe end.
Apply solvent cement to both end of pipe socket or fittings joint evenly.

2.7 Precaution shall be taken to ensure solvent cement joint is clean and free from any
dirt, oil and foreign material by priming liquid. Upon application of solvent cement,
joint up pipe joint by pushing in with a slight twist to ensure even spread of solvent
cement immediately.

2.8 Hold the joint for 30 second without movement.

2.9 Remove excess dripping cement with a soft cloth.

2.10 Align and lay joined pipe in trench, double check on pipe gradient and adjust
position of pipe to exact desire position.

2.11 Backfill with soil partially of pipe length to ensure pipe stay at desire position.
Leave installed piping to cure.

2.12 Upon immediate inspection by relevant parties, backfill pipe in trench and compact
manually with consolidated material from the excavation to existing ground level.