Nothing Special   »   [go: up one dir, main page]

GE 7EA Gas Turbine Details

Download as pdf or txt
Download as pdf or txt
You are on page 1of 10

To Mist

Eliminator
Cooling & Sealing Air Piping.
Fabricated As A Pipe Within
A Pipe Within A Pipe To
Provide 3 Separate Air
Passages To The Bearing.

5th Stage
Extraction
Clg & Slg Air

To Piping - Vent Inner & Outer


Exhaust Fabricated As A Pipe Within
A Pipe Within A Pipe To
Provide 3 Separate Air
Passages To The Bearing.

Bearing Housing
Upper Half

Bearing Housing
Assembly Bolts
Combustion
Wrapper

Bearing Cap
Assembly Bolts

Bearing Cap

ROTOR

Anti -
Rotation
Pin
Bearing
Liner

AFT Oil
Seal
FWD Oil
Seal AFT Air
Seal

FWD Air
Seal

Oil Feed To
#2 Brg Liner

Oil Drain From


#2 Brg Liner

Bearing
Oil Feed To Housing
#2 Brg Liner Lower Half

Oil Drain From


BRG01X 2/94 #2 Brg Liner

You might also like