SUB-CONTRACT BILL
Name of the Contractor : M/s. Deepak Enterprises R.A. Bill No.: 01
Address of the Contractor : Bhojpur Colony, Chas, Bokaro

R.A. Bill Date: 26-03-2017

PAN No. : - BOPPS4348K Work Order No.: ABL/NH32/EQA/16-17/22, Dated 05.03.2017


Work Order Date: 05th Mar- 2017
Name of Client: ASHOKA BUILDCON LTD.

Project : - Rajgunj Chas W.B Border Section NH-32 Measurement Period: 06/03/2017 to 25/03/2017

Previous Previous
Current Current Upto date Upto Date
Sr. No. Particulars of Measurement of work carried out Unit Unit Rate Upto date Upto Date
Quantity Value Quantity Amount
Quantity Amount

Providing & mixing and laying 30mm thk. IPS (Indian Patent
Stone) flooring in PCC 1:2:4 mix concrete with 10mm &
down size graded crushed aggregate including compacting &
finishing the surface smooth using cement slurry including
1 painting, curing,taxes and royalty all complete as per
Sqm 135 0.000 0.00 253.25 34188.78 253.25 34188.78
building specification and direction of Engineer-in-charge.
(Cement consumption 0.264 bag per Sqm, provided by ABL
free of cost)

- 34,189 34189.00
Other Deductions on account of:
Security Deposit @ 0.00% 0 - -
T.D.S. @ 1.00% 0 342 342
W.C.T. @ 4.00% 0 1,368 1,368
Other@ 1.00% 0 342 342
Less, for Defective Work
Total Deductions 0 2,052 2,052

Net payable - 32,137 32,137

Sub-Contractor Prepared by Checked by Authorised by A/c Officer


Name:
Seal
Contractor- M/s. Deepak Enterprises
RA Bill – 01 Measurement Period: 06/03/2017 to 25/03/2017

IPS Flooring

S.NO DESCRIPTION No's Length Width Qty.(Sqm)

1 Confrence Room 1 11.71 4.2 49.182

2 Highway 1 5.03 4.21 21.1763

3 EQA Dept 1 4.59 4.2 19.278

4 HR & ADMIN 1 3.6 4.2 15.12

5 IT/Safety Room 1 2.41 4.2 10.122

6 Pantry 1 2.4 4.2 10.08

7 Varandah towards IT Room 1 10.68 2.13 22.7484

8 Planning Varandah 1 4 1.88 7.52

9 Staff qtr 5 3.93 4.39 86.2635

10 Staff qtr varandah 1 7.35 1.6 11.76

. TOTAL= 253.2502
Sub-Contractor Prepared by Checked by Authorised by
Contractor- Deepak Enterprises
RA Bill No.- 1

Material Reconciliation Upto 25.-03.2017

Sr.No. Material Unit Qty. (cum) Theoretical Total Issue Physical Actual Difference Remarks
Consumptio theoretical Balance Consumptio
n per cum Consumptio n
n
(a) (b) (c) (d) = (b)-(c) (e)
IPS Flooring Cum 253.250 0.264 66.858
1 Cement(Bags) 67 54 5 49 18

Sub-Contractor Prepared by Checked Authorised by