Break Down Penawaran
Break Down Penawaran
Break Down Penawaran
WUNUT #19
TOTAL
No DESCRIPTION
Rp
Intangible :
1 RIG 350 HP Rp -
2 COMPLETION FLUID Rp -
3 CEMENTING, PUMP FEES & SQUEEZE C-50 & D-10 Rp -
4 CALLOUT FISHING TOOLS SPECIALIST
5 FISHING TOOLS Rp -
6 SLICKLINE UNIT Rp -
7 FILTRATION UNIT Rp -
TOTAL Rp -
INTEGRATED WORKOVER & WELL SERVICES (LUMPSUM)
WORKOVER PROJECT WUNUT #19, WUNUT #4, TANGGULANGIN #3
WUNUT #4
TOTAL
No DESCRIPTION
Rp
Wunut #4 Well
Tangible :
1 COMPLETION EQUIPMENT Rp -
Intangible :
1 RIG 350 HP Rp -
2 COMPLETION FLUID Rp -
3 CEMENTING, PUMP FEES & SQUEEZE Rp -
4 CASED HOLE LOGGING Rp -
5 COMPLETION SERVICES Rp -
6 CALLOUT FISHING TOOLS SPECIALIST
7 CALL OUT FISHING TOOL Rp -
8 SLICKLINE UNIT Rp -
9 FILTRATION UNIT Rp -
10 BIAYA HANDAK Rp -
TOTAL Rp -
INTEGRATED WORKOVER & WELL SERVICES (LUMPSUM)
WORKOVER PROJECT WUNUT #19, WUNUT #4, TANGGULANGIN #3
TANGGULANGIN #3
TOTAL
No DESCRIPTION Rp
TANGGULANGIN #3 Well
Tangible :
1 SUBSURFACE EQUIPMENT Rp -
2 SURFACE EQUIPMENT Rp -
Intangible :
1 RIG 350 HP Rp -
2 COMPLETION FLUID Rp -
3 CEMENTING, PUMP FEES & SQUEEZE Rp -
4 CASED HOLE LOGGING Rp -
5 COMPLETION EQUIPMENT Rp -
6 SLICKLINE UNIT Rp -
7 FILTRATION UNIT Rp -
TOTAL Rp -
SUMMARY
WORKOVER PROJECT WUNUT #19
RIG 350 HP
NO DESCRIPTION
A Drilling
B Workover / Completion Rate
C Mechanical breakdown
D Standby with full crew rate
E Standby without crew
F Moving Rate
G Mobilization
H Demobilization
Total
SUBSURFACE EQUIPMENT
NO DESCRIPTION
COMPLETION FLUID
NO DESCRIPTION
A CaCl2 Brine
B Personnel
Mud Enginer 1
Mud Enginer 2
Total
NO DESCRIPTION
A. SERVICE CHARGE
A. Equipment
1 Operation Rate
2 Standby Rate
3 Water Tank
4 Batch Mixer
5 Personel
B. Job Charge
6 Pumping Fluid Up to 5000 gall
7 Job Charge Over 5000 gal
D C. Squeeze Cementing
1 Services Squeeze Job
E Moving Rate
F Mobilization Demobilization
TOTAL
B. MATERIAL CHARGE
NO DESCRIPTION
1 CEMENT
2 RETARDER
3 DISPERSANT
4 FLUID LOSS CONTROL
5 BONDING AGENT
6 ANTI FOAM
TOTAL
SLICKLINE UNIT
NO DESCRIPTION
A Equipment
Slickline Unit
EMR
B Personnel
Supervisor
Operator (1 persons)
Helper (1 persons)
C Mobilization & Demobilization
Total
FILTRATION UNIT
NO DESCRIPTION
A Equipment
Operating Rate
Standby Rate
B Personnel
C Processing Cost
D Filtration Unit include Personnels
Operating Rate
E Mobilization
F Moving Rate
G Demobilization
Total
SURFACE EQUIPMENT
NO DESCRIPTION
1 Tubing Head Assy 11" 3M Flange x 7-1/16" 3M Flange W/Outlets Test Port, LDS, Pref. Tubing Hange
7" NOM
- Tubing Head Body 11'3M Flange Bottom x 7-1/16"3M Flange Top W/Outlets,. Test Port
- Tubing Hanger En Type Assy 7-1/16" x 2-7/8" EUE THD'S Top x Bottom, 2-1/2"NOM,.BPV
- Tubing Head Adapter Assy, 7-1/16"3M Flange Bottom x 2-7/8" EUE Box
- Nipple Tubing 2-7/8" EUE x 8" Lg
- API Ring Join Gasket, R-45 Carbon Steel
- Stud Bold C/W Two Nuts, 1-1/8"-8UN x 8-1/2" LG, CAD, PLTD
TOTAL
FISING TOOLS
NO DESCRIPTION
a FISING TOOLS
- Mills Tools (6" Flat Bottom Mill, 6" Wash Over Shoe iwth FJWP Box
- Magnets (8" OD Skirted Magnet, 6" OD Skirted Magnet)
- Washpipe Rental Tools (6” OD Washpipe, for fishing in 6" ID with FJWP connections, 6” OD washpip
extention 20 ft, Washpipe Drive Sub, for item 6" OD with FJWP pin x 3 ½" IF box connections,
Washpipe Lift Subs for 6" OD Washpipe, Washpipe Elevators for 6" OD Washpipe, Washpipe Rotary
Slips, Washpipe Safety Clamp with wrench.)
- External Tubing Cutter (5-7/8" External Tubing Cutter)
Moving Rate
Mobilization / Demobilization
TOTAL
Y
ER PROJECT WUNUT #19
ESTIMATE
DESCRIPTION UNIT
QUANTITY
Day 0
tion Rate Day 19
wn Day 0
ew rate Day 0
w Day 0
Day 4
Lumpsum 1
Lumpsum 0
Total
ESTIMATE
DESCRIPTION UNIT
QUANTITY
bbl 400
Day 19
Day 19
Total
Day 3
Day 16
Day 2
Day 2
Day 19
Day 5
5
Day 5
) Day 5
Day 5
obilization Lumpsum 1
Total
DESCRIPTION UNIT
ESTIMATE
QUANTITY
Day 19
Day 0
Day 19
M3 150
de Personnels
Monthly 0.5
Lumsump 1
Day 4
Lumsump 0
Total
DESCRIPTION UNIT
ESTIMATE
QUANTITY
1" 3M Flange x 7-1/16" 3M Flange W/Outlets Test Port, LDS, Pref. Tubing Hanger Set 1
ESTIMATE
DESCRIPTION UNIT
QUANTITY
Monthly 0.5
Bottom Mill, 6" Wash Over Shoe iwth FJWP Box
rted Magnet, 6" OD Skirted Magnet)
ools (6” OD Washpipe, for fishing in 6" ID with FJWP connections, 6” OD washpipe
hpipe Drive Sub, for item 6" OD with FJWP pin x 3 ½" IF box connections,
or 6" OD Washpipe, Washpipe Elevators for 6" OD Washpipe, Washpipe Rotary
ty Clamp with wrench.)
tter (5-7/8" External Tubing Cutter)
1
obilization Lumpsum 1
TOTAL
UNIT PRICE TOTAL
Rp Rp
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
SUMMARY
WORKOVER PROJECT WUNUT #4
RIG 350 HP
NO DESCRIPTION
A Drilling
B Workover / Completion Rate
C Mechanical breakdown
D Standby with full crew rate
E Standby without crew
F Moving Rate
G Mobilization
H Demobilization
Total
COMPLETION FLUID
NO DESCRIPTION
A CaCl2 Brine
B Personnel
Mud Enginer 1
Mud Enginer 2
Total
NO DESCRIPTION
A. SERVICE CHARGE
A. Equipment
1 Pumping Unit
2 Standby Rate
3 Water Tank
4 Batch Mixer
5 Personel
B. Job Charge
6 Pumping Fluid Up to 5000 gall
7 Job Charge Over 5000 gal
D C. Squeeze Cementing
1 Services Squeeze Job
E Moving Rate
F Mobilization Demobilization
TOTAL
B. MATERIAL CHARGE
NO DESCRIPTION
1 CEMENT
2 RETARDER
3 DISPERSANT
4 FLUID LOSS CONTROL
5 BONDING AGENT
6 ANTI FOAM
TOTAL
NO DESCRIPTION
SLICKLINE UNIT
NO DESCRIPTION
A Equipment
Slickline Unit
EMR
B Personnel
Supervisor
Operator (1 persons)
Helper (1 persons)
C Mobilization & Demobilization
Total
FILTRATION UNIT
NO DESCRIPTION
A Equipment
Operating Rate
Standby Rate
B Personnel
C Processing Cost
D Filtration Unit include Personnels
Operating Rate
E Mobilization
F Moving Rate
G Demobilization
Total
COMPLETION EQUIPMENT
NO
DESCRIPTION
1 PACKER ENGINEER
BIAYA HANDAK
NO
DESCRIPTION
1 Biaya Perijinan
2 Mobilisasi
3 Demobilisasi
4 Biaya Pemusnahan
TOTAL
FISING TOOLS
NO DESCRIPTION
a FISING TOOLS
- Mills Tools (6" Flat Bottom Mill, 6" Wash Over Shoe iwth FJWP Box
-Subs
Magnets
for 6"(8"
ODOD Skirted Magnet,
Washpipe, Washpipe 6" Elevators
OD SkirtedforMagnet)
6" OD Washpipe, Washpipe Rotary Slips, Washpipe S
Clamp with wrench.)
- External Tubing Cutter (5-7/8" External Tubing Cutter)
Moving Rate
Mobilization / Demobilization
TOTAL
R PROJECT WUNUT #4
ESTIMATE
DESCRIPTION UNIT
QUANTITY
Day 0
on Rate Day 11
n Day 0
Day 0
Day 0
Day 5
Lumpsum 0
Lumpsum 0
Total
ESTIMATE
DESCRIPTION UNIT QUANTITY
bbl 400
Day 10
Day 10
Total
Day 2
Day 8
Day 2
Day 2
Day 3
Job 2
Day 5
ization Lumpsum 0
TOTAL
B. MATERIAL CHARGE
ESTIMATE
DESCRIPTION UNIT
QUANTITY
Sack 160
Gals 4
Gals 20
Gals 70
Gals 90
Gals 6
TOTAL
SUB TOTAL
ESTIMATE
DESCRIPTION UNIT QUANTITY
G (Item A)
WELL 1
UTRON WELL 1
Lumpsum 1
es (Item B)
Gun, 5 SPF
ea 4
ea 71
ea 235
em C)
ft 0
st ft 0
Lumpsum 0
ilization Lumpsum 1
Total
ESTIMATE
DESCRIPTION UNIT
QUANTITY
Day 5
Day 0
Day 5
Day 5
Day 5
bilization Lumpsum 0
Total
Day 11
Day 0
Day 11
M3 150
Personnels
Monthly 0.5
Lumsump 0
Day 5
Lumsump 0
Total
ESTIMATE
DESCRIPTION UNIT
QUANTITY
Monthly 0.5
ottom Mill, 6" Wash Over Shoe iwth FJWP Box
ed Magnet,
ipe, Washpipe6" Elevators
OD SkirtedforMagnet)
6" OD Washpipe, Washpipe Rotary Slips, Washpipe Safety
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp - TOTAL
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
-
-
-
-
-
-
-
-
-
$ -
TOTAL $ -
-
-
-
Item Quantity, feet Rate, Rp Totals Cost, Rp
TOTAL Rp -
SUMMARY OF OWNER ESTIMATE ( OE )
WORKOVER PROJECT WUNUT #19
RIG 350 HP
NO DESCRIPTION
A Drilling
B Workover / Completion Rate
C Mechanical breakdown
D Standby with full crew rate
E Standby without crew
F Moving Rate
G Mobilization
H Demobilization
Total
SUBSURFACE EQUIPMENT
NO DESCRIPTION
CROSS OVER
1 Cross over 2-7/8" EUE (b) x 2-3/8" NUE 10RD (p), 6.4 ppf, J-55
COMPLETION FLUID
NO DESCRIPTION
A CaCl2 Brine
B Personnel
Mud Enginer 1
Mud Enginer 2
Total
NO DESCRIPTION
A. SERVICE CHARGE
A. Equipment
1 Pumping Unit
2 Standby Rate
3 Water Tank
4 Batch Mixer
5 Personel
B. Job Charge
6 Pumping Fluid Up to 5000 gall
7 Job Charge Over 5000 gal
D C. Squeeze Cementing
1 Services Squeeze Job
E Moving Rate
F Mobilization Demobilization
TOTAL
B. MATERIAL CHARGE
NO DESCRIPTION
1 CEMENT
2 RETARDER
3 DISPERSANT
4 FLUID LOSS CONTROL
5 BONDING AGENT
6 ANTI FOAM
TOTAL
NO DESCRIPTION
SLICKLINE UNIT
NO
DESCRIPTION
A Equipment
Slickline Unit
EMR
B Personnel
Supervisor
Operator (1 persons)
Helper (1 persons)
C Mobilization & Demobilization
Total
FILTRATION UNIT
NO
DESCRIPTION
A Equipment
Operating Rate
Standby Rate
B Personnel
C Processing Cost
D Filtration Unit include Personnels
Operating Rate
E Mobilization
F Demobilization
Total
COMPLETION EQUIPMENT
NO
DESCRIPTION
SURFACE EQUIPMENT
NO DESCRIPTION
WELLHEAD ASSY
A Fabricate Tubing Head Adapter Assembly
- 7-1/16" 3000 Psi WP Flange Bottom
- 3-1/2" EU 8RD Box ToP C/W 1/4" Port Injection Line
- With One (1) 1/2" LP (F) for Cavity Test Port
- AISI 4130 Forged Steel Materials
- MC : PSL-2, Monogrammed, Standard API 6A
B Tubing Head Adapter Assembly
- 7-1/16" 3000 Psi WP Flange Bottom
- 3-1/2" EU 8RD Box Top
- AISI 4140 Forged Steel Materials or Equivalent with Certificate
- MC : PSL-2, Monogrammed, API Standard 6A
TOTAL
OF OWNER ESTIMATE ( OE )
R PROJECT WUNUT #19
ESTIMATE
DESCRIPTION UNIT
QUANTITY
Day 0
on Rate Day 10
n Day 0
Day 0
Day 0
Day 4
Lumpsum 0
Lumpsum 1
Total
Day 10
Day 10
Total
Day 2
Day 6
Day 2
Day 2
Day 3
Job 2
Day 0
ization Lumpsum 1
TOTAL
B. MATERIAL CHARGE
ESTIMATE
DESCRIPTION UNIT
QUANTITY
Sack 160
Gals 4
Gals 20
Gals 70
Gals 90
Gals 6
TOTAL
SUB TOTAL
Day 1
Day 1
Day 1
bilization Lumpsum 1
Total
Day 8
Day 0
Day 8
M3 150
Personnels
Monthly 0.5
Lumsump 0
Lumsump 1
Total
DESCRIPTION UNIT
ESTIMATE
QUANTITY
d Adapter Assembly
Flange Bottom
oP C/W 1/4" Port Injection Line
Set 1
(F) for Cavity Test Port
el Materials
mmed, Standard API 6A
Assembly
Flange Bottom
op
el Materials or Equivalent with Certificate Set 1
mmed, API Standard 6A
Set 1
TOTAL
UNIT PRICE TOTAL
Rp Rp
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -