Nothing Special   »   [go: up one dir, main page]

BCA Railway Reservation System

Download as doc, pdf, or txt
Download as doc, pdf, or txt
You are on page 1of 30

1

RAILWAY RESERVATION
SYSTEM

SUBMITTED BY :- POONAM CHOUDHARY


2

CONTENTS

1. INTRODUCTION
2. PROPOSED SYSTEM
3. SYSTEM DEVELOPMENT LIFE CYCLE
4. SOURCE CODE
5. TESTING
 WHITE BOX TESTING
 BLACK BOX TESTING
6. CODE COMPLETENESS EVALUATION
7. DATA FLOW DIAGRAM
8. ADVANTAGES OF THE SYSTEM
9. HARDWARE/SOFTWARE REQUIREMENTS
10. BIBLIOGRAPHY

SUBMITTED BY :- POONAM CHOUDHARY


3

INTRODUCTION

This project introduces railway reservation system . It explains


how reservation is being done in Indian Railways . The step by
step procedure is explained . This project is developed in c ++
language . Allmost all the header files have been used in this
project. Proper comments have been given at desired locations

SUBMITTED BY :- POONAM CHOUDHARY


4

to make the project user friendly. Various functions and


structures are used to make a complete use of this language.
Thos project is well versed with
the programming . Railway reservation can easily
accompanied with the help of this.

PROPOSED SYSTEM
Today one cannot afford to rely on the fallible human beings of
be really wants to stand against today’s merciless competition
where not to wise saying “to err is human” no longer valid, it’s
outdated to rationalize your mistake. So, to keep pace with
time, to bring about the best result without malfunctioning and
greater efficiency so to replace the unending heaps of flies with
a much sophisticated hard disk of the computer. One has to use
the data management software. Software has been an ascent in
atomization various organizations. Many software products
working are now in markets, which have helped in making the
organizations work easier and efficiently. Data management
initially had to maintain a lot of ledgers and a lot of paper
work has to be done but now software product on this
organization has made their work faster and easier. Now only
this software has to be loaded on the computer and work can
be done. This prevents a lot of time and money. The work
becomes fully automated and any information regarding the
organization can be obtained by clicking the button. Moreover,
now it’s an age of computers of and automating such an
organization gives the better look.

SUBMITTED BY :- POONAM CHOUDHARY


5

SYSTEM DEVELOPMENT LIFE CYCLE


The systems development life cycle is a project management
technique that divides complex projects into smaller, more
easily managed segments or phases. Segmenting projects
allows managers to verify the successful completion of project
phases before allocating resources to subsequent phases.

Software development projects typically


include initiation, planning, design, development, testing,
implementation, and maintenance phases. However, the phases
may be divided differently depending on the organization
involved. For example, initial project activities might be
designated as request, requirements-definition, and planning
phases, or initiation, concept-development, and planning
phases. End users of the system under development should be
involved in reviewing the output of each phase to ensure the
system is being built to deliver the needed functionality.

SUBMITTED BY :- POONAM CHOUDHARY


6

PHASES OF SYSTEM DEVELOPMENT LIFE


CYCLE

Initiation Phase
The Initiation Phase begins when a business sponsor identifies
a need or an opportunity. The purpose of the Initiation Phase
is to:

 Identify and validate an opportunity to improve business


accomplishments of the organization or a deficiency
related to a business need.

SUBMITTED BY :- POONAM CHOUDHARY


7

 Identify significant assumptions and constraints on


solutions to that need.
 Recommend the exploration of alternative concepts and
methods to satisfy the need including questioning the
need for technology, i.e., will a change in the business
process offer a solution?
 Assure executive business and executive technical
sponsorship.

The Sponsor designates a Project Manager and the business


need is documented in a Concept Proposal. The Concept
Proposal includes information about the business process and
the relationship to the Agency/Organization Infrastructure and
the Strategic Plan. A successful Concept Proposal results in a
Project Management Charter which outlines the authority of
the project manager to begin the project.

Careful oversight is required to ensure


projects support strategic business objectives and resources
are effectively implemented into an organization's enterprise
architecture. The initiation phase begins when an opportunity
to add, improve, or correct a system is identified and formally
requested through the presentation of a business case. The
business case should, at a minimum, describe a proposal’s
purpose, identify expected benefits, and explain how the
proposed system supports one of the organization’s business
strategies. The business case should also identify alternative
solutions and detail as many informational, functional, and
network requirements as possible.

SUBMITTED BY :- POONAM CHOUDHARY


8

System Concept Development


Phase

The System Concept Development Phase begins after a


business need or opportunity is validated by the
Agency/Organization Program Leadership and the
Agency/Organization CIO. The purpose of the System
Concept Development Phase is to:

 Determine the feasibility and appropriateness of the


alternatives.
 Identify system interfaces.
 Identify basic functional and data requirements to satisfy
the business need.
 Establish system boundaries, identify goals, objectives,
critical success factors, and performance measures.
 Evaluate costs and benefits of alternative approaches to
satisfy the basic functional requirements
 Assess project risks
 Identify and initiate risk mitigation actions, and
 Develop high-level technical architecture, process models,
data models, and a concept of operations.

This phase explores potential technical solutions within the


context of the business need. It may include several trade-off
decisions such as the decision to use COTS software products

SUBMITTED BY :- POONAM CHOUDHARY


9

as opposed to developing custom software or reusing software


components, or the decision to use an incremental delivery
versus a complete, one-time deployment. Construction of
executable prototypes is encouraged to evaluate technology to
support the business process.

The System Boundary Document serves as an important


reference document to support the Information Technology
Project Request (ITPR) process. The ITPR must be approved
by the State CIO before the project can move forward.

SUBMITTED BY :- POONAM CHOUDHARY


10

PICTORIAL REPRESENTATION
OF SDLC:-

SUBMITTED BY :- POONAM CHOUDHARY


11

Planning Phase
The planning phase is the most critical step in completing
SUBMITTED BY :- POONAM CHOUDHARY
12

development, acquisition, and maintenance projects. Careful


planning, particularly in the early stages of a project, is
necessary to coordinate activities and manage project risks
effectively. The depth and formality of project plans should be
commensurate with the characteristics and risks of a given
project.

Project plans refine the information


gathered during the initiation phase by further identifying the
specific activities and resources required to complete a project.
A critical part of a project manager’s job is to coordinate
discussions between user, audit, security, design, development,
and network personnel to identify and document as many
functional, security, and network requirements as possible.

During this phase, a plan is developed that


documents the approach to be used and includes a discussion
of methods, tools, tasks, resources, project schedules, and user
input. Personnel assignments, costs, project schedule, and
target dates are established. A Project Management Plan is
created with components related to acquisition planning,
configuration management planning, quality assurance
planning, concept of operations, system security, verification
and validation, and systems engineering management
planning.

SUBMITTED BY :- POONAM CHOUDHARY


13

Requirements Analysis
Phase
This phase formally defines the detailed functional user
requirements using high-level requirements identified in the
Initiation, System Concept, and Planning phases. It also
delineates the requirements in terms of data, system
performance, security, and maintainability requirements for
the system. The requirements are defined in this phase to a
level of detail sufficient for systems design to proceed. They
need to be measurable, testable, and relate to the business need
or opportunity identified in the Initiation Phase. The
requirements that will be used to determine acceptance of the
system are captured in the Test and Evaluation Master Plan.

The purposes of this phase are to:

 Further define and refine the functional and data


requirements and document them in the Requirements
Document,
 Complete business process reengineering of the functions
to be supported (i.e., verify what information drives the
business process, what information is generated, who
generates it, where does the information go, and who
processes it),
 Develop detailed data and process models (system inputs,
outputs, and the process.
 Develop the test and evaluation requirements that will be
used to determine acceptable system performance.

SUBMITTED BY :- POONAM CHOUDHARY


14

Design Phase

The design phase involves converting the informational,


functional, and network requirements identified during the
initiation and planning phases into unified design
specifications that developers use to script programs during
the development phase. Program designs are c onstructed in
various ways. Using a top-down approach, designers first
identify and link major program components and interfaces,
then expand design layouts as they identify and link smaller
subsystems and connections. Using a bottom-up approach,
designers first identify and link minor program
components and interfaces, then expand design layouts as
they identify and link larger systems and connections.
Contemporary design techniques often use
prototyping tools that build mock-up designs of items such as
application screens, database layouts, and system
architectures. End users, designers, developers, database
managers, and network administrators should review and
refine the prototyped designs in an iterative process until they
agree on an acceptable design. Audit, security, and quality
assurance personnel should be involved in the review and
approval process.

During this phase, the system is designed to


satisfy the functional requirements identified in the previous
SUBMITTED BY :- POONAM CHOUDHARY
15

phase. Since problems in the design phase could be very


expensive to solve in the later stage of the software
development, a variety of elements are considered in the design
to mitigate risk. These include:

 Identifying potential risks and defining mitigating design


features.
 Performing a security risk assessment.
 Developing a conversion plan to migrate current data to
the new system.
 Determining the operating environment.
 Defining major subsystems and their inputs and outputs.
 Allocating processes to resources.
 Preparing detailed logic specifications for each software
module.

The result is a draft System Design Document which captures


the preliminary design for the system. Everything requiring
user input or approval is documented and reviewed by the
user.
Once these documents have been approved by the Agency CIO
and Business Sponsor, the final System Design Document is
created to serve as the Critical/Detailed Design for the system.
This document receives a rigorous review by Agency technical
and functional representatives to ensure that it satisfies the
business requirements.

Concurrent with the development of the system design, the


Agency Project Manager begins development of the
Implementation Plan, Operations and Maintenance Manual,
and the Training Plan.

SUBMITTED BY :- POONAM CHOUDHARY


16

Development Phase
The development phase involves converting design
specifications into executable programs. Effective development
standards include requirements that programmers and other
project participants discuss design specifications before
programming begins. The procedures help ensure
programmers clearly understand program designs and
functional requirements.

Programmers use various techniques to


develop computer programs. The large transaction-oriented
programs associated with financial institutions have
traditionally been developed using procedural programming
techniques. Procedural programming involves the line-by-line
scripting of logical instructions that are combined to form a
program.

SUBMITTED BY :- POONAM CHOUDHARY


17

Effective completion of the previous stages is


a key factor in the success of the Development phase. The
Development phase consists of:

 Translating the detailed requirements and design into


system components.
 Testing individual elements (units) for usability.
 Preparing for integration and testing of the IT system.

Integration and Test


Phase
Subsystem integration, system, security, and user acceptance
testing is conducted during the integration and test phase. The
user, with those responsible for quality assurance, validates
that the functional requirements, as defined in the functional
requirements document, are satisfied by the developed or
modified system. OIT Security staff assess the system security
and issue a security certification and accreditation prior to
installation/implementation. Multiple levels of testing are
performed, including:

 Testing at the development facility by the contractor and


possibly supported by end users

SUBMITTED BY :- POONAM CHOUDHARY


18

 Testing as a deployed system with end users working


together with contract personnel
 Operational testing by the end user alone performing all
functions.

Requirements are traced throughout testing, a final


Independent
Verification & Validation evaluation is performed and all
documentation is reviewed and accepted prior to acceptance of
the system.

Implementation Phase
This phase is initiated after the system has been tested and
accepted by the user. In this phase, the system is installed to
support the intended business functions. System performance
is compared to performance objectives established during the
planning phase. Implementation includes user notification,
user training, installation of hardware, installation of software
onto production computers, and integration of the system into
daily work processes.

This phase continues until the system is operating in


production in accordance with the defined user requirements.
SUBMITTED BY :- POONAM CHOUDHARY
19

Operations and Maintenance


Phase
The system operation is ongoing. The system is monitored for
continued performance in accordance with user requirements
and needed system modifications are incorporated. Operations
continue as long as the system can be effectively adapted to
respond to the organization’s needs. When modifications or
changes are identified, the system may reenter the planning
phase. The purpose of this phase is to:

 Operate, maintain, and enhance the system.


 Certify that the system can process sensitive information.
 Conduct periodic assessments of the system to ensure the
functional requirements continue to be satisfied.
 Determine when the system needs to be modernized,
replaced, or retired.

SUBMITTED BY :- POONAM CHOUDHARY


20

Testing
Software Testing is an empirical investigation conducted to
provide stakeholders with information about the quality of the
product or service under test[1] , with respect to the context in
which it is intended to operate. Software Testing also provides
an objective, independent view of the software to allow the
business to appreciate and understand the risks at
implementation of the software. Test techniques include, but
are not limited to, the process of executing a program or
application with the intent of finding software bugs. It can also
be stated as the process of validating and verifying that a
software program/application/product meets the business and
SUBMITTED BY :- POONAM CHOUDHARY
21

technical requirements that guided its design and development,


so that it works as expected and can be implemented with the
same characteristics.

Software Testing, depending on the testing method employed,


can be implemented at any time in the development process,
however the most test effort is employed after the
requirements have been defined and coding process has been
completed.

Testing methods
Software testing methods are traditionally divided into black
box testing and white box testing. These two approaches are
used to describe the point of view that a test engineer takes
when designing test cases.

Black box testing


Black box testing treats the software as a "black box," without
any knowledge of internal implementation. Black box testing
methods include: equivalence partitioning, boundary value
analysis, all-pairs testing, fuzz testing, model-based testing,
traceability matrix, exploratory testing and specification-based
testing.

Specification-based testing 
Specification-based testing aims to test the functionality of
software according to the applicable requirements. [16] Thus, the
tester inputs data into, and only sees the output from, the test
object. This level of testing usually requires thorough test cases
to be provided to the tester, who then can simply verify that for
SUBMITTED BY :- POONAM CHOUDHARY
22

a given input, the output value (or behavior), either "is" or "is
not" the same as the expected value specified in the test case.
Specification-based testing is necessary,
but it is insufficient to guard against certain risks
Advantages and disadvantages 
The black box tester has no "bonds" with the code, and a
tester's perception is very simple: a code must have bugs. Using
the principle, "Ask and you shall receive," black box testers
find bugs where programmers don't. But, on the other hand,
black box testing has been said to be "like a walk in a dark
labyrinth without a flashlight," because the tester doesn't
know how the software being tested was actually constructed.
That's why there are situations when (1) a black box tester
writes many test cases to check something that can be tested by
only one test case, and/or (2) some parts of the back end are
not tested at all.

Therefore, black box testing has the advantage of "an


unaffiliated opinion," on the one hand, and the disadvantage of
"blind exploring," on the other.

White box testing


White box testing, by contrast to black box testing, is when the
tester has access to the internal data structures and algorithms
(and the code that implement these)

Types of white box testing :-


The following types of white box testing exist:

SUBMITTED BY :- POONAM CHOUDHARY


23

 api testing - Testing of the application using Public


and Private APIs.
 code coverage - creating tests to satisfy some criteria
of code coverage. For example, the test designer can
create tests to cause all statements in the program to
be executed at least once.
 fault injection methods.
 mutation testing methods.
 static testing - White box testing includes all static
testing.

Code completeness evaluation


White box testing methods can also be used to evaluate
the completeness of a test suite that was created with
black box testing methods. This allows the software team
to examine parts of a system that are rarely tested and
ensures that the most important function points have
been tested.[19]

Two common forms of code coverage are:


 function coverage, which reports on functions
executed
 and statement coverage, which reports on the
number of lines executed to complete the test.

They both return a coverage metric, measured as a percentage

SUBMITTED BY :- POONAM CHOUDHARY


24

DATA FLOW DIAGRAM:-

New Customer

2. Maintain TRAIN
Customer DATABASE
Information

Check for
available trains

2. Create AMOUNT
record

SUBMITTED BY :- POONAM CHOUDHARY


25

DFD FOR PAYMENT:-

CUSTOMER

PAYMEN ACCOUNT
T

ACCOUNT

SUBMITTED BY :- POONAM CHOUDHARY


26

ADVANTAGES OF RAILWAY
RESERVATION SYSTEM
Now one can easily plan the journey comfortably as
the process is efficient and fast with being easy to
access. Reservations can be made through the Indian
railways site or at the ample reservation centers all
over the country. Also now there are authorized
agencies which provide reservation facility on behalf
of India railways and without waiting in long line one
can easily book a ticket. The booking is done through
an E-Ticket issue which have a PNR number of
which one has to take a print and just have to show at
the station.
It not only provide reservation but
cancellation can also be done through this system at
ease and one can use a credit card to complete the
process.
This being a big step in terms of
improvement in the railway system it is widely
accepted across the country.

SUBMITTED BY :- POONAM CHOUDHARY


27

HARDWARE REQUIREMENTS:

I. OPERATING SYSTEM :
Any

II. PROCESSOR:
1. PENTIUM(ANY) OR AMD
ATHALON(3800+- 4200+ DUAL CORE)

III. MOTHERBOARD:
1. 845 OR 915,995 FOR PENTIUM 0R MSI
K9MM-V VIA K8M800+8237R PLUS
CHIPSET FOR AMD ATHALON

IV. RAM:512MB+

V. Hard disk:

SUBMITTED BY :- POONAM CHOUDHARY


28

Sata 40 gb or above

VI. CD/DVD r/w multi drive combo

VII. FLOPPY DRIVE 1.44 MB

VIII. MONITOR 14.1 or 15 -17 inch

IX. Key board and mouse

X. Printer

SOFTWARE REQUIREMENTS:

I. office XP

II. Vb 6.0

SUBMITTED BY :- POONAM CHOUDHARY


29

BIBLIOGRAPHY

These are the following links which assist me at each and every
step in compliting this project , without them i was not be able
to finish this important project:-

1. www.wikipedia.com
2. www.answers.com
3. www.askme.com
4. www.esnips.com

Instead of these useful websites , following books also help me:

1. OBJECT ORIENTED PROGRAMMING


BY E.BALAGURUSWAMI

2. OBJECT ORIENTED PROGRAMMING


BT ROBERT LAFORE

SUBMITTED BY :- POONAM CHOUDHARY


30

SUBMITTED BY :- POONAM CHOUDHARY

You might also like