DRA-DFB-11+063-RA-ELV-232 - 01 of 01
DRA-DFB-11+063-RA-ELV-232 - 01 of 01
DRA-DFB-11+063-RA-ELV-232 - 01 of 01
BAR SPACING
SHAPE DIA REMARKS
MARK NOS.
B
D
’W’
TRAFFIC DIRECTION
TRAFFIC DIRECTION
’W’ ’W’
A A C C
DETAIL−’X’
’W’ A A
B
D
PLAN
PLAN OF PILE CAP
B B
’Z’
D D
’X’
DETAIL−’W’
SECTION G−G SECTION H−H
SECTION A−A
SECTION C−C
NOTES:-
DIM. AND REINF. DETAIL OF PILE & PILE CAP FOR ABUTMENTS
National Highways Authority of India (LP1,RP1,LP19,RP19 & LP21,RP21) OF ELEVATED STRUCTURE AT CH. 11+063
(Ministry of Road Transport & Highways)
G−5 & 6, Sector−10, Dwarka, New Delhi−110075 DINESH CHANDRA R AGRAWAL ASC INFRATECH PVT. LTD.
Intercontinental Consultants and
INFRACON PVT. LTD.
Construction of 6 Lane Highway from jn. with Jaitpur−Pushta Road to Technocrats Pvt. Ltd. B-63, Sector-67,
A−8 & A−9, Green Park Main, Noida - 201301 (U.P) Tel: 0120-4248813-16 2 0 1 0 1 2
jn. with Sector 62−65 dividing road on Faridabad−Ballabhgarh Bypass
Section of NH−148NA (Design Ch. 9.000 to 33.000) including spur from New Delhi, Delhi 110016 Fax: 0120-4237953, email: info@ascinfratech.com DRA−DFB−11+063−ELV−232_01 of 01
Design Ch. 13.2 to jn. of Faridabad−Ballabhgarh Bypass with NH−19 in
the state of Haryana (Package−II) AS SHOWN A1 R0