How To Avoid Stuck Pipe in Hard or Soft Cement
How To Avoid Stuck Pipe in Hard or Soft Cement
How To Avoid Stuck Pipe in Hard or Soft Cement
CEMENT FAILURE
.
DEFINITION:
A cured (harden) cement job breaks apart and falls (caves) into the
wellbore.
CAUSE:
Long rathole section below the casing shoe allows the heavier
cement to settle and fill the rathole. After curing and drill-out, the mud-
contaminated cement sheath breaks apart and falls into the hole.
.
Cement from closely spaced wells can break apart and fall into the
hole if the well paths are too close.
WARNING:
Pack-off /bridge can occur any time after drilling out of the shoe or open-
hole cement plug.
.
Very erratic torque and drag. Hole fill after connections and trips.
.
Large volume of cement cavings at connection and trip bottoms-up.
FREEING:
String motion prior to sticking: Moving or Static.
.
Kick-Off PREVENTION:
Plug Minimize casing rat-hole length. Allow sufficient cement curing time.
.
Reduce trip speed before the BHA enters the shoe, kick-off plug, open
hole plug depth.
.
Minimize rotating /circulating time with the BHA in the plug /shoe area.
Page 57
0 0 S 0 0 S
FREEING, HOLE PACK-OFF /BRIDGE
INDICATIONS
The mechanism of pack-off or bridge is identified by the inability to circulate with total pack-off
or restricted circulating pressure with bridging (partial pack-off). String motion prior to sticking
may have been moving or static.
FIRST ACTION, TORQUE-UP & JAR DOWN TO RE-ESTABLISH CIRCULATION
Immediate action is recommended as additional packing off is likely from solids settling
and /or differential sticking may occur if the drillstring is not moved.
Hole Angle Less Than 600:
.
Depending on the situation, other options may include: picking up a Heavy Down-Jarring Assembly
(see Differential Sticking section); washing over the fish; jarring up; or side tracking the well.
Page 60
0 0 S 0 0 S
SOFT CEMENT
DEFINITION:
Sticking the drillstring in a cement application
(squeeze or kick-off plug) that is not yet
sufficiently cured (hard).
Soft
Cement CAUSE:
A joint or more of the drillstring is run into the
top of the soft cement before circulation is
started.
.
Page 62
0 0 S 0 0 S
FREEING, SOFT CEMENT
INDICATIONS
Hole pack-off caused by Soft Cement can occur with the string static or moving. Circulation is
impossible as the cement flash sets.
.
FIRST ACTION, JAR UP
Immediate action is recommended as additional cement curing will occur with time and/or
differential sticking can occur if the drillstring is in open hole and not moved.