2G ICT Bathinda PFR
2G ICT Bathinda PFR
2G ICT Bathinda PFR
FOR
PREPARED BY
M/s. ULTRA-TECH
ENVIRONMENTAL LABORATORY AND CONSULTANCY
(Gazzeted By MoEF)
Unit No. 206, 224, 225 Jai Commercial Complex, Eastern Express Highway,
Opp Cadbury Factory, Khopat, Thane (West) – 400 061
Tel: 022 2534 2776, Fax: 022 25429650, Email: sales@ultratech.In
Website: www.ultratech.in
TABLE OF CONTENTS
1. EXECUTIVE SUMMARY ...................................................................................................... 1
2. INTRODUCTION..................................................................................................................... 2
LIST OF TABLES
Table 3.1: Environmental Setting ................................................................................................... 3
i
Pre-Feasibility Report For Installation Of 2G Ethanol Plant at Bathinda
Table 4.6: Stack Details ................................................................................................................ 14
LIST OF FIGURES
Figure 3.1: Project Location ........................................................................................................... 5
ii
Pre-Feasibility Report For Installation Of 2G Ethanol Plant at Bathinda
1. EXECUTIVE SUMMARY
HPCL is a Government of India Enterprise with a Navratna Status, and a Forbes 2000 and
Global Fortune 500 company. It had originally been incorporated as a company under the
Indian Companies Act 1913. It is listed on the Bombay Stock exchange (BSE) and National
Stock Exchange (NSE), India. HPCL owns & operates 2 major refineries producing a wide
variety of petroleum fuels & specialties, one in Mumbai (West Coast) of 6.5 Million Metric
Tonnes Per Annum (MMTPA) capacity and the other in Visakhapatnam, (East Coast) with a
capacity of 8.3 MMTPA. HPCL also owns and operates the largest Lube Refinery in the country
producing Lube Base Oils of international standards, with a capacity of 428 TMT. This Lube
Refinery accounts for over 40% of the India's total Lube Base Oil production. Presently HPCL
produces over 300+ grades of Lubes, Specialities and Greases.
The company appointed M/s. Ultra Tech Environmental Consultancy & Laboratory
(MoEFCC recognized and NABL approved), Thane to carry out study of the impacts of the
project on local environment and for obtaining Environmental Clearance. Ultra-Tech is an
established Consultancy in the field of Environmental Services. Company is giving services in
this field for past 29 years. The Notification No. S. O. 1533 promulgated on 14th September 2006
has covered this type of industries under its schedule 5(g) A. Hence, HPCL intends to approach
MoEF&CC for environment clearance for proposed Distillery. The prefeasibility report is
prepared for forming a frame work for EIA study, scoping and finalizing terms of reference as
may be required. Form I, as is prescribed by the said notification is duly filled up and submitted.
The Prefeasibility Report is an accompaniment to the same and prepared as per MoEF guideline
dated 27/02/2012.
HPCL proposes to Installation of 2G Ethanol plant at Bathinda, Punjab. HPCL has acquired 15.1
ha (37.28 Acres) from Government of Punjab on a long term lease in the Village Nasibpura,
District Bathinda.
The commercial operation date (COD) is envisaged in 18 months reckoned from the effective
zero date.
The total project cost for the Proposed Installation of 2G Ethanol Plant is around Rs. 600 crores.
This includes the cost of land and land development, on lease from Govt. of Punjab as per lease
rentals/terms & conditions.
1
Pre-Feasibility Report For Installation Of 2G Ethanol Plant at Bathinda
2. INTRODUCTION
2
Pre-Feasibility Report For Installation Of 2G Ethanol Plant at Bathinda
3. SITE INFORMATION
HPCL proposes to Installation of 2G Ethanol plant at Bathinda, Punjab. HPCL has acquired 15.1
ha (37.28 Acres) from Government of Punjab on a long term lease in the Village Nasibpura,
District Bathinda.
3
Pre-Feasibility Report For Installation Of 2G Ethanol Plant at Bathinda
The location map of the project site is as depicted in Figure 3.1, Connectivity Map is shown in
Figure 3.2 and Google Image is as shown in Figure 3.3.
4
Pre-Feasibility Report For Installation Of 2G Ethanol Plant at Bathinda
Figure 3.1: Project Location
5
Pre-Feasibility Report For Installation Of 2G Ethanol Plant at Bathinda
• Connectivity
The project site is aerially located at 6.3 Km from SH 17 Highway. The nearest Railway station is Bathinda Railway Station: 31.8 Km
and The nearest airport is Ludhiana Airport: 180 Km
6
Pre-Feasibility Report For Installation Of 2G Ethanol Plant at Bathinda
Figure 3.3: Google Image of the Project Site
7
Pre-Feasibility Report For Installation Of 2G Ethanol Plant at Bathinda
4. PROJECT DESCRIPTION
4.1 Process Description
The proposed 100 KLPD plant is based on the DBT-ICT 2G Ethanol technology developed
indigenously at the DBT-ICT Centre for Energy Biosciences (CEB), Mumbai. The CEB at the
Institute of Chemical Technology (ICT), Mumbai is one of India’s leading multidisciplinary
research facilities specializing in Bioenergy and Industrial Biotechnology.
The project is designed to produce 100KL fuel grade ethanol per day, primarily from rice straw
and will use approximately 400 tons of rice straw per day for the process. An additional 50 tons
of straw per day will be used for supplementary fuel for steam generation. The process employed
here uses rice straw as feed stock to convert into its cellulose, hemi cellulose and lignin fractions.
The cellulose and hemi cellulose fractions are then converted into respective sugars through a
process called saccharification.The sugars are then converted into dilute ethanol by fermentation
using appropriate yeasts. The dilute impure ethanol stream is then purified and concentrated to
fuel grade ethanol. The Figure 4.1 depicts the process outline. The rectangular blue blocks
represent the main processing sections in the plant. Aside from these, there are ancillary sections
like biomass size reduction, steam/steam /power/water supply systems, raw material and finished
goods storage yards etc.
The plant has been designed as a zero-liquid discharge plant. The final products will be fuel
grade ethanol, silica, mixed solid salts and liquid carbon dioxide.
8
Pre-Feasibility Report For Installation Of 2G Ethanol Plant at Bathinda
4.2 Manufacturing Process
The Figure 4.2 schematically represents the basic process outline. Biomass (rice straw/cotton
stalk/Napiergrass) obtained in the form of bales, is size reduced and then converted to sugars
that are fermented to ethanol via two step alkali and acid treatment steps.
The overall site consists of the following sections:
• Size reduction
• Fractionation to cellulose, hemicelluloses and lignin
• Saccharification to C6 and C5 sugars
• Fermentation to Ethanol
• Distillation and Dehydration of ethanol
• Purification, Compression and Bottling of CO2
• Utilities(power, steam, cooling water)
9
Pre-Feasibility Report For Installation Of 2G Ethanol Plant at Bathinda
The Site layout of the proposed project is as shown in Figure 2.3.
10
Pre-Feasibility Report For Installation Of 2G Ethanol Plant at Bathinda
The plant is designed for the products as listed in the Table 4.1. The plant and Machinery have
been designed with required specification considering volume of reaction, material of
construction and are located at appropriate positions. Adequate ventilation, air conditioning and
Air Filtration systems have been planned to prevent environmental hazards. The raw materials
required for the proposed production is listed in Table 4.2.
• Both C5 and C6 sugar (glucose) can be obtained separately and converted to ethanol by
fermentation either independently or combined.
• The plant is fully automated and DCS/SCADA controlled
11
Pre-Feasibility Report For Installation Of 2G Ethanol Plant at Bathinda
• The plant is supported by an equipped QC/QA laboratory
• Sugars produced are fermented using specific yeast strains
• Enzyme and chemicals required to be procured from recommended suppliers
• The plant does not produce and create liquid effluent
• Solid byproducts generated are ash, salts (sodium nitrate) and silica that will be sold in
market
12
Pre-Feasibility Report For Installation Of 2G Ethanol Plant at Bathinda
4.6 Manpower Requirement
The estimated manpower requirement during operation phase will be around 120 personnels. The
details of the same are provided in Table 4.4.
Table 4.4: Proposed Manpower Requirement
Persons for operation of plant in three
1 45
shifts
2 Persons for maintenance of the plant 45
3 Persons for lab-Chemist, Microbiologist 25
4 Managers 5
The details of the Non Hazardous Solid Waste are as provided in Table 4.5 and Hazardous
Waste is as provided in Table 4.6.
13
Pre-Feasibility Report For Installation Of 2G Ethanol Plant at Bathinda
5. ENVIRONMENT CONTROL MEASURES
• The DG sets shall be acoustically insulated resulting in reduction of noise as per limits
prescribed by State Pollution Control Board. The exhaust pipe from DG sets shall be
taken above the building as per State Pollution Control norms
• All conditions & pre-requisites of water and air consents together with certificate to
handle hazardous products issued by State Pollution Control Board shall be strictly
adhered to.
• During operation phase, there shall be air pollution being generated due to the Boiler.
Following stack as mentioned in Table 4.6 is as proposed.
14
Pre-Feasibility Report For Installation Of 2G Ethanol Plant at Bathinda
6. PROJECT SCHEDULE AND COST ESTIMATES
15
Pre-Feasibility Report For Installation Of 2G Ethanol Plant at Bathinda