Nothing Special   »   [go: up one dir, main page]

Basement Const. Details

Download as pdf or txt
Download as pdf or txt
You are on page 1of 7

BEMENT (Sboduelon, tpoaaksuetu)

-
AxuAL LoAD FLM UlulN
UPERTKDUTURE

PASEMenNT ATERAL LoA P-M cqRDUND

-LEVEL oF WATER TABLE

PERSTEUCTURE
LsADS FeOM o
IEPERSEb To toUMP

MoHTURE
To KESIST LoAIUA
PENETRATO) FRDA PLst ATS AS PRACE

Baembe o e s hat ae cemplkely patialy


b u r the ound

. l o d ton auwtces.
EXCAVATION
DES)N CoSIDERATIDJS Po DEEP
1.uaco mweduga liern
2. Evahualnin umalaliin
ns Wall

T. Tpe uppet y e t
5p Raharint Wall
2EECTINC TYPE OF PAEMENT
7N the baois -

Level oumd wnte p n aul


2- Persibt lontanmalieis o o n d wrati
3 Natuual olorounages
A. soil zpe
5 Awer to nste

pkoEMENT TTPE
TYPEA TAJKEV PRDTETDA
lae UwpVLus mateiol untnally n extunall to
exllud motabme.

INTELL EXTeRWL

PROTECTIond
IF RERvIfEP

MeMBRANE
WATER KSTAA
AROLAEAL WAL

CNO WATE
RpsISTAIT)

sAseMENT
PAEMElT
PETAL ' e
PETAJ A
ReIUFORUe venceETE
NTERAAL FLODE | 2. coKTS ELASTICNe
FLBH onl
cONCAPTe
TAN KIN owRAY
oR-PEP o e D epu INbIATIDLS

TUDDEb MEMPRANE
wITH e o TEXTE LAYER
To PRevVEN7 ucKAAE

FILTPR MEMPRANE to
HINCLe Tb PLE/ET
PLceKAAE

enHINI LE To AWow U1ABuE


PLAINALE
PELFORATED AIN

ANCLED MDRTAR Fwet T eumINATE


PoDUNC
WATERPRS TAKU mEMBEANE FIXpD TO
ToP bF A

TYPE P-WATERPRODE
o i l e wakenpr mateuas wthuis
the otruelwt e wals

rkualy vmkqated
PAotectow
nbredueig buakalluaalon
4A

Uaa popw cowakuuelieu

omto
AAD INTP4AL KKEP PETAL A:
oHOUV bE AVDIDED
As It /Iw ReavuLe
oNE WATE t b P WATERStop RER
WHELe IT ApJDIS THE T JUUCTOn TM
SLAR AND ANDTHER AT THE WA AJD J A

INTERSECTIO WITH THEWA AND AT AW


CoNSTLuUTION

EXTERAL O INTERUL SDINT


WATERSPOT AS
RpQUIREP

WATEL KEATANT LEINFoRLED


coCAETE WAL AND SAS
CoSTRUCTID
A wmt INTECLAL KeKER

TYeE -DRAINED
MAsoLiAR NAW LoNKT. (MIu MAL
REIN POLPP
N7EAL LESTANCE TD PEUeTRATI oF
WATER)
CAVITY MBMBRANE FlxED To ETAINING YNAL
VIA EALBD Puas

ALLES6ue DEAINACIE ttANHEL cOncEAEp


wintt FLsbR cekt. LINKED To s u P YStem

PUmP YSTEM WITH IN CcoNCRETE


pUMP
CHAMBee op CAST IN sUMP LNEK.

EXTEE LANo bRAIALE


(POLDUS)
PAEMENT PXLAVATIDA

ToPPoW FXCAVATiO
POTTOWn UP EXANAT1DAJ

DPEN VER1IAL KeTAININ ToP boW METHO

WA

CoPPERtDAM DAPHRALM cONTINUDUS 2oLDIER WALL

WALL BoeEp PlLBS


PILPS
OR SEANT
PILE

CONSTRucTION METHOb

ExAVATID Fo ptAUb
PASEMENT

RAPT/LAB

BRALE

TRUCTUuRAL WAL

PLODE

TANKIL
1 PoACKPIL
UT AND 0VER PASEMET
HOR12-TAL ExCANATIbA
PPALAN 4YDRAULL
HUNPep

VERTILA
RAIL RDPlA
PLYWeDP
cOVER h c K P I L

RBAINING WAW

e Jhne Katamun Wall:


po
I. Cornihala diaaqnatm wall

. osd pil wal


3 l a a haak pila wall

No. uts dapend upon B


olspth excayatsw

Cman is tonat. e m batten


putnd
simphzk and oht wrao
cebwuq
w wban arnua
N o t Rhacieal
> t u censkrane

yitu o xpoed to wedhw: Fletd vng oteuA.

Provino daevakums ao tempevayt arauna


st necersa
necersany
TOP DeWN EXCAVATIDA

eyavobor
AeTAININ wA Jhe oupaskhuek une a n d
Cam c o n k r u e k e onnukamcouw

muinm zeo
A m d mowu nt

pecolmms Aueh as:


DECKING idea
. i n i t a uodrobm

excayaUom
bskilid accers tor makea
hondm
D u r and Nowe
bL NG
o b P sLA

PACKP

RooPA
SLAL
PeAc I

(sImULANEeUSUY) PAsEMEsT PLO


ExcAVATID SLA
(TRUT)
RUDFLAS (RooF OPEA IRNC)

STRDT
AKFLL
F L o t SLAE STVT LEMVALL

You might also like