com +55 11 9 00000000 Order #3991 April 15, 2021

Conveyor Chain - Installation, Maintenance


& Best Practices-001
March, 2018

Conveyor Chain Installation, Maintenance,


& Best Practices - 001

Created by: CEMA Conveyor Chain & Sprocket Section


Jonatas Gonçalves JSG goncalvesjonatas@gmail.com +55 11 9 00000000 Order #3991 April 15, 2021

DISCLAIMER

The information provided herein is advisory only.

These recommendations provided by CEMA are general in nature and are not intended
as a substitute for professional advice. Users should seek the advice, supervision and/
or consultation of qualified engineers, safety consultants, and other qualified professionals.

Any use of this publication, or any information contained herein, or any other CEMA publication is
made with the agreement and understanding that the user and the user’s company assume full
responsibility for the designs, safety, specifications, suitability and adequacy of any conveyor system,
system component, mechanical or electrical device designed or manufactured using this information.

The user and the user’s company understand and agree that CEMA, its member companies, its
officers, agents and employees are not and shall not be liable in any manner under any theory
of liability to anyone for reliance on or use of these recommendations. The user and the user’s
companies agree to release, hold harmless and indemnify and defend CEMA, its member companies,
successors, assigns, officers, agents and employees from any and all claims of liability, costs,
fees (including attorney’s fees), or damages arising in any way out of the use of this information.

CEMA and its member companies, successors, assigns, officers, agents and employees make no
representations or warranties whatsoever, either expressed or implied, about the information contained
herein, including, but not limited to, representations or warranties that the information and recommendations
contained herein conform to any federal, state or local laws, regulations, guidelines or ordinances.

Conveyor Equipment Manufacturers Association


5672 Strand Ct., Suite 2
Naples, Florida 34110-3314
www.cemanet.org
Jonatas Gonçalves JSG goncalvesjonatas@gmail.com +55 11 9 00000000 Order #3991 April 15,
Conveyor 2021
Chain-Installation, Maintenance
& Best Practices-001 - March, 2018

Conveyor Chain
Installation, Maintenance, & Best Practices
Introduction
The careful and correct installation of chains along with a good inspection and maintenance program will typically
help improve both the performance and longevity of chains of any type. Obviously, it is better to correct problems
found during an inspection than to have to repair the chain after a breakdown; regular inspection and maintenance
often costs less than repairs and the associated downtime. Most chains will show signs of trouble long before
needing repair or replacement. If problems are found during regular inspections, those problems can possibly
be corrected before an unexpected breakdown occurs, thereby reducing the costs associated with component
replacement and lost production time. Furthermore, collateral damage caused by a breakdown may not always
be found during repairs, leading to additional component failure later and even more unexpected downtime.

To reduce the frequency of untimely breakdowns and the necessary repairs, an inspection program for each
chain installation should be established and followed. A checklist of items to inspect should be made and a
record of maintenance action kept. Trends can be tracked in that manner and the chain can be adjusted or
replaced before a costly failure occurs.

This document has been prepared by the CEMA Conveyor Chain Working Group in an effort to provide a basic
level of understanding of the Best Practices associated with the Installation and Maintenance of some of the
various types of conveying chains used in industry today. For each type of chain included in this guide, the main
emphasis is on operator safety, though this is not intended to be a Safety Manual for the use of these chains.
Where applicable, local plant Standard Operating Practices for safety and maintenance should take precedence.
But where those defined practices are absent or otherwise insufficient, the practices presented in this document
may be helpful and can provide a solid basis for the proper installation and maintenance of the conveyor chains
that have been included in this guide.

General Safety Precautions


Serious personal injury can result if safety rules are not followed. Observe the following safety precautions when
inspecting, maintaining, or replacing a chain.

• Shut-off the power to the equipment and lock-out the power switches before inspecting, adjusting, repairing,
or replacing chains.
• Always wear safety glasses to protect your eyes.
• Wear protective clothing, gloves, and safety shoes as appropriate.
• Support the chain to prevent uncontrolled movement of the chain or parts.
• Restrain shafts and sprockets from free rotation where such rotation could permit uncontrolled chain
movement and cause personal injury or equipment damage.
• Use pressing equipment to remove or install press fit pins or link plates. Keep tooling in good condition
and use it properly. If pressing equipment is not available, contact the chain manufacturer for additional
guidance.
• Know and understand chain construction, including the correct direction for pin removal and insertion,
before connecting or disconnecting a chain.

General Inspection Program


All inspection programs should include the items listed below. These items apply to both drives and conveyors.
• Inspect for signs of interference.
• Inspect for chain or sprocket damage.

1 of 17
Jonatas Gonçalves JSG goncalvesjonatas@gmail.com +55 11 9 00000000 Order #3991 April 15,
Conveyor 2021
Chain-Installation, Maintenance
& Best Practices-001 - March, 2018
• Inspect for signs of misalignment of the shafts, sprockets, or ways.
• Inspect for dirt or corrosion.
• Inspect for proper lubrication.
• Inspect for sprocket wear.
• Inspect for chain wear.
• Inspect for correct chain initial tension.
• Inspect for good guarding condition.

This is a list of only the major items that should be inspected regularly. There may be more items that apply to a
given application. Any other items should be added to the list.

Many typical chain and sprocket problems are listed and described in general troubleshooting manuals or other
pertinent information directly available from CEMA member chain manufacturers. An additional printed resource
that can be very helpful is the ACA Standard Handbook of Chains,Chains For Power Transmission and Material
Handling - 2nd Edition available for purchase from the Conveyor Equipment Manufacturers Association (CEMA).
It is advisable for maintenance personnel to have one or more of these troubleshooting guides on hand when
inspecting a chain drive or conveyor. These guides provide not only a list of some of the more common chain
problems, but they also provide possible causes and associated remedies.

The following Table lists some of the more common types of chain failures along with the associated causes
and recommended corrections. It has been included here to provide a good basis and foundation for the basic
chain troubleshooting topics discussed below, but is not necessarily applicable to all types of chains. (It should
be noted this Table is taken from the aforementioned ACA Standard Handbook of Chains and has been used
here with permission.)

PROBLEM POSSIBLE CAUSE WHAT TO DO


Missing Parts • Missing at assembly Replace chain.
• Broken and lost Find and correct cause of broken parts.
Replace chain.
Missing or Broken Cotters or • Cotters or spring clip not installed Install new cotters or spring clip per
Spring Clips correctly manufacturer’s instructions
Excessive Noise • Chain striking an object Eliminate interference. Replace Chain.
• Loose casing or shaft mounts Tighten fasteners.
• Too much chain slack Reset initial chain tension.
• Chain badly worn Replace chain. Reset initial chain tension.
• Sprockets badly worn Replace sprockets. Realign sprockets.
Replace chain, if not done before.
• Sprockets misaligned Replace chain and sprockets, if needed.
Realign sprockets.
• Inadequate Lubrication Re-establish proper lubrication. Clean and re-
lubricate chains. Replace chain, if needed.
• Chain pitch too large Redesign to use smaller pitch chain.
• Too few sprocket teeth Install larger sprockets, if the design permits.
Otherwise, redesign to use larger sprockets.
Wear on Inside if Sidebars or • Sprockets misaligned Replace chain and sprockets, if needed.
Roller Link Plates and on One Realign sprockets
Side of Sprocket Teeth

2 of 17
Jonatas Gonçalves JSG goncalvesjonatas@gmail.com +55 11 9 00000000 Order #3991 April 15,
Conveyor 2021
Chain-Installation, Maintenance
& Best Practices-001 - March, 2018
PROBLEM POSSIBLE CAUSE WHAT TO DO
Uneven Wear Across Chain • Shaft Misaligned Replace chain and sprockets, if needed.
Realign shafts.
• Tracks misaligned Replace chain and tracks, if needed. Realign
tracks.
UNEVEN WEAR ON PIN

Pins Cracked or Broken • Chain exposed to corrosive Find and eliminate source of corrosion.
(Corrosion Fatigue) substance Replace chain.
• Corrosive substance (acid) in Change oil. Find and eliminate source of
lubricant corrosion. Replace chain.

PIN PITTED AND CRACKED

Pins Eroded • Chain exposed to corrosive and Find and eliminate source of corrosives and
abrasive substances abrasives. Replace chain.

Worn Link Plate or Sidebar Edges • Drive chain rubbing against object Find and eliminate source of corrosives and
abrasives. Replace chain.
• Conveyor chain rubbing against Replace chain when worn 5% or more.
track Redesign conveyor to use chain with large
conveyor rollers.

Battered Link Plate Edges • Drive chain striking and object Find and remove interfering object. Replace
chain.
Tight Joints (Will Not Flex) • Dirt or foreign material packed in Clean and re-lubricate chain. Replace chain if
joints needed.
• Joints badly rusted or corroded Find and eliminate source of corrosion. Clean
and re-lubricate chain. Replace chain if
needed.
• Chain severely overloaded Eliminate cause of overloading. Replace chain.
Turned Pins • Dirt or foreign material packed in Replace chain. Shield chain from dirt.
joints
• Joints badly rusted or corroded Replace chain. Find and eliminate source of
corrosion.
• Chain overloaded Replace chain. Eliminate cause of overloading.

Cracked Link Plate (Fatigue) • Loads more than chain's dynamic Replace chain. Reduce dynamic loads or
strength redesign for a larger chain.

3 of 17
Jonatas Gonçalves JSG goncalvesjonatas@gmail.com +55 11 9 00000000 Order #3991 April 15,
Conveyor 2021
Chain-Installation, Maintenance
& Best Practices-001 - March, 2018
PROBLEM POSSIBLE CAUSE WHAT TO DO
Broken Link Plate • Extreme overload (not suddenly Replace chain. Reduce loads or redesign for
applied) (often with larger than larger chain.
standard pins)

Broken Pin • Extreme overload

Pin Shear • Extreme overload; suddenly Replace chain. Find and eliminate cause of
applied; shock load. Pin usually extreme overload
shears near inside edge of outer link
plate or sidebar

Pin Break • Extreme overload; not suddenly Replace chain. Reduce loads or redesign for
applied. Pin usually breaks in larger chain.
middle third of length.

Pin Fatigue • Loads more than chain's dynamic Replace chain. Reduce dynamic loads or
strength (slightly more than for link redesign for larger chain.
plate fatigue). Pin usually fatigues
near center of length.

Galled Pins • Speed or load too high Reduce speed or load. Redesign for smaller
pitch chain or multiple strand chain.
• Poor Lubrication Correct or improve lubrication system.

Cracked or Broken Rollers • Speed and load more than roller's Replace chain. Reduce speed or redesign for
impact capacity smaller pitch multiple strand chain.

• Too few teeth on sprockets Replace chain. Use sprockets with more teeth
or redesign for smaller pitch multiple strand
chain.

4 of 17
Jonatas Gonçalves JSG goncalvesjonatas@gmail.com +55 11 9 00000000 Order #3991 April 15,
Conveyor 2021
Chain-Installation, Maintenance
& Best Practices-001 - March, 2018
PROBLEM POSSIBLE CAUSE WHAT TO DO
Roller Seams Open • Too few teeth on sprockets (as on Use sprockets with more teeth. Or replace
a hoist) and loads too high chain with a high-strength chain having
seamless rollers.
• Chain riding too high on sprocket Reset initial chain tension. Replace chain if
teeth worn too much.

Note: Table shows only some of the more common chain problems and possible causes and cures. It is only a general
guide for troubleshooting. The user should always consult the chain manufacturer when a chain fails.

Engineered Class Chain


Installation and Maintenance Guide

Chain Installation:
The information below is for guidance only. You MUST always follow the equipment manufacturer’s safety,
installation, and maintenance instructions that were provided with the conveyor. Consult your CEMA Conveyor
Manufacturer for more details.

Warning: Observe proper lock-out and tag-out procedures when working on or around the conveyor.

The following list of general instructions is provided to assist with the safe and proper installation of Engineered
Class Chains:
1. Locations for connecting lengths of chain together should be limited to those links that are intended by
the manufacturer for the purpose of repair or replacement. Modifications or repairs to other chain links
should be left to or authorized by the chain manufacturer.
2. All conveyor tensioning devices should be adequately loosened before attempting to install the chain on
a conveyor.
3. The drive shaft on the conveyor should be locked in place to prevent unintended rotation prior to the
attempted chain installation.
4. When possible, connect sections of loose chain together on the floor prior to the installation of the chain
on the conveyor.
5. Final connection of the chain to make it endless should preferably be performed at the sprockets. The
sprockets can provide adequate support and also help to align the adjoining chain components. This
is not always possible, so any location on the conveyor where the chain is adequately supported may
suffice.
6. Engineered Class Chains can be large and quite heavy. The following list of tools and equipment is
typically recommended for making chain connections. More specialized assembly tools are usually
available from the chain manufacturer. Note: it is extremely important that tools and equipment used for
chain installation be properly maintained and in good working condition.
a. Hydraulic chain press or hydraulic jack
b. Chain vice
c. “C” Clamps
d. Parallel spacers
e. Pliers
f. Grinder
g. Hacksaw
h. Hammer
7. When connecting chain sections together, use only new pins or connecting links. Previously used
components should be discarded and not re-used.

5 of 17
Jonatas Gonçalves JSG goncalvesjonatas@gmail.com +55 11 9 00000000 Order #3991 April 15,
Conveyor 2021
Chain-Installation, Maintenance
& Best Practices-001 - March, 2018
8. Avoid damaging chain components during the installation of the chain through excessive heating or
grinding of the chain while attempting to shorten the chain prior to making final connection.
9. For chains that require only a single pin to make a connection:
a. Bring the loose ends of the chains together such that the pin holes are aligned.
b. Insert the chain connecting pin through the mating links. Align the pin to match the shape of the
pin hole if necessary.
c. Support the opposite side of the chain, but allow space for the connecting pin to be fully inserted.
d. Press or otherwise drive the chain pin completely through the mating links until it is properly
seated. Support the internal part of the chain link with a spacer if needed.
e. Install the cotter pin (if applicable) or rivet the end of the chain pin to form a head. Riveting can be
done by heating the end of the pin until the end is red in color, then peening the pin with a hammer
to form the riveted end.
f. Check for free and sufficient articulation of the chain joint. Correct as needed.
10. For chains that require a connecting link for assembly:
a. Bring the loose ends of the chains together such that the mating links are aligned but properly
spaced (one chain pitch apart) in order to accept the insertion of the connecting link.
b. Insert the chain connecting link through the loose ends of the chains to be connected.
c. Place the outer connecting sidebar onto the ends of the connecting link and press it onto the
ends of the pins. Support the opposite side of the pins on the connecting link during this pressing
operation. Support the internal part of the chain link with a spacer if needed. Do not press the
outer sidebar too far onto the pins as this will make the connecting link too tight and limit the free
articulation of the chain joint.
d. Install the cotter pins (if applicable) or rivet the ends of the chain pin to form a head. Riveting
can be done by heating the end of the pin until the end is red in color, then peening the pin with a
hammer to form the riveted end.
e. Check for free and sufficient articulation of the chain joint. Correct as needed.
11. Once the chain has been connected endless on the conveyor, release the lock on the drive shaft if
applicable. Make an initial adjustment to the chain tension to remove excess chain length if needed.
12. Slowly start the conveyor; watch the chain and listen to it run. Investigate unusual or suspicious noises
on the conveyor while the chain is running. Also re-adjust the chain tension if necessary. The chain
should be tight enough to run smoothly, but no tighter. Over-tensioned chain can result in accelerated
chain and sprocket wear.

Chain Maintenance:
The information below is for guidance only. You MUST follow the equipment manufacturer’s safety, installation,
and maintenance instructions that were provided with the conveyor. Consult your CEMA Conveyor Manufacturer
for more details.

Warning: Observe proper lock-out and tag-out procedures when working on or around the conveyor.

The following checklists emphasize key areas for which inspections and maintenance may be needed as it
pertains to Engineered Class chains.

Chain or Sprocket Damage: Inspect the chain for any missing, cracked, deformed, corroded, or broken parts.
If any are found, search for the cause and correct it. Then replace the entire damaged chain. Even though the
rest of the chain may appear to be in good condition, there may be hidden damage.
Inspect the sprockets for chipped, broken, or deformed teeth. If any of these problems are found, find the cause
and correct it. Then replace the damaged sprocket. Carefully inspect the other sprockets in the drive. If they
show any signs of damage, consider replacing them too. When replacing a complete chain, it is a good idea to
replace the sprockets also.

Misalignment: Inspect chains for unusual wear on the inside of the sidebars. Inspect all chains for signs of
uneven wear of the pins from one side of the chain to the other. Also, inspect the sprockets of chains for unusual
wear on one side of the teeth. Correct alignment issues immediately and replace the chain/sprockets as needed.
Interference: Check for signs of interference between the chain or sprockets and any other parts of the machine.
6 of 17
Jonatas Gonçalves JSG goncalvesjonatas@gmail.com +55 11 9 00000000 Order #3991 April 15,
Conveyor 2021
Chain-Installation, Maintenance
& Best Practices-001 - March, 2018
One sign of interference is a damaged link or sidebar edges. Other signs of interference include damaged pin
ends, bent pins, and broken rollers.
Rubbing between the chain or sprockets and other objects can cause unusual wear. Impact between the chain
and a solid object can cause the chain to break from fatigue.

Material and Corrosion: Inspect the chain for material packed between sidebars. Also check for tight rollers or
tight joints. This could indicate that material is packed between the rollers and bushings or that material is packed
between the pin and bushings. Material in these clearance spaces can prevent lubricant from entering critical
bearing areas. If found, correct the problem or replace the chain as needed.
Inspect the drive for dirt packed between the sprocket teeth and the rollers of roller or engineering steel chains.
Dirt in these spaces can stretch the chain or damage rollers.
Inspect the chain for cracked link plates or sidebars. Inspect the chain for discolored or pitted parts. These are
signs that the chain may have been exposed to a corrosive substance or that the lubricant has been contaminated.
If any of these issues are evident on the chain, clean and re-lubricate the chain or replace.

Sprocket Wear: Inspect the sprockets for signs of worn teeth. As sprocket teeth wear, the teeth begin to take on
a “hooked” shape. A typical badly worn sprocket is shown below.

It is very hard to measure sprocket wear directly. Some sprockets with less wear than shown in the above figure
may also need to be replaced.
If a new chain sticks, clings, or binds as it disengages from a sprocket tooth, the tooth may be worn out and the
sprocket may need to be replaced. If a high-speed drive is very noisy or runs rough, the sprockets may be worn
badly enough that they need to be replaced.
Reversing the sprocket on the shaft can sometimes extend the life of a worn sprocket. But this is only possible if
the flange is centered on the hub, or if there is space to do so.

Chain Wear: Rotate two sprockets opposite each other to get a tight section of chain. Measure that tight section
of chain, as shown below. The section of chain that is measured should be at least 1’ long or contain at least
eight pitches of chain.

In most chains, the chain is considered worn out when wear elongation reaches 3%, (though in certain applications
the practical limit for allowable chain elongation may be considerably less). In other words, when the measured
length is 3% more than the nominal length, the chain is worn out. For example, the nominal length over 24

7 of 17
Jonatas Gonçalves JSG goncalvesjonatas@gmail.com +55 11 9 00000000 Order #3991 April 15,
Conveyor 2021
Chain-Installation, Maintenance
& Best Practices-001 - March, 2018
pitches of 1/2” pitch chain is 12”. When the measured length over 24 pitches of that chain reaches 12”, the chain
is worn out. Three-eighths of an inch is 3.1% of 1’. In most engineering steel chain drives, the chain is considered
worn out when wear elongation reaches 4% or 5%.
When the chain is worn beyond its functional limits, it must be replaced. Do not put a new engineering steel chain
on worn sprockets. The chain tension will not be spread over several teeth. The tension will be concentrated on
the final bushing engaging the sprocket. That effect is shown in figure below. A new chain is also subjected to an
impact load as each roller leaves the worn sprocket.

Conveyor chains are often used in pairs or sets. The difference in wear between the chains in a set can sometimes
cause the conveyor to not work properly. Sometimes the difference in wear between the chains in a set can
cause attachments to break. When the difference in wear between the chains in a set causes problems, the
chains must be replaced as a set.

Guarding: Inspect the guarding to be sure it is in good condition. Guards must not be bent or deformed so much
that intended clearances are reduced. Any intended openings in the guards (mesh) must not be enlarged and the
guarding must not be broken or damaged. This is especially important at or near the mounting points.
Make sure that all fasteners are in good condition and secure. Be sure that any safety devices, such as presence
sensors or interlocks, are in the proper position and are operating properly. If the guarding does not meet these
requirements, it must be repaired or replaced.

Surge: Long, very slow conveyors are sometimes subject to surge. Surge is often caused by a stick-slip condition.
Better lubrication or a slight increase in speed may remedy the situation.

Repairing Chain: A chain can be repaired if the damage is slight and the wear is minor. Make sure that any
damage is local before repairing the chain. Use repair links or sections from the original chain manufacturer and
ask the manufacturer for advice on making the repair.

Repairing very worn or damaged chains is not recommended. Damaged links or sections should not be replaced
in a broken chain. It is very likely that there is unseen damage in the chain and that another failure may occur.
Damage should only be repaired in an emergency. For example, damaged parts can be replaced to keep a vital
machine running until a new chain is obtained.

Also, new links are shorter than worn links and create a shock every time the new link passes over a sprocket.
In chains with more than one strand, new links can cause strand mismatch. In both cases, the new link does not
seat the same as the worn links on sprocket teeth. This can cause the chain to break or damage the sprockets.
Single parts should not be replaced in a chain.

Lubricating Chain: A well lubricated chain will have an operating life much longer than that of an unlubricated
chain. The lubricant should have a viscosity to enable it to reach internal surfaces under normal conditions. For
temperatures up to 160°F, SAE 30 oil is recommended.
Applying a lubricant to Engineered Class chains is often difficult, as they are usually operated in the open and
exposed to material being conveyed. The nature of the surrounding atmosphere is the principle consideration in
selecting the method of lubrication to be used.
Chains operating in a relatively clean atmosphere can be lubricated by brush or drip-feed oilers, or by applying
the lubricant manually with a brush or oil can.

8 of 17
Jonatas Gonçalves JSG goncalvesjonatas@gmail.com +55 11 9 00000000 Order #3991 April 15,
Conveyor 2021
Chain-Installation, Maintenance
& Best Practices-001 - March, 2018
Where large volumes of lint or non-abrasive dust are present, a brush or wiper can be used to clean the chain
and apply new lubricant. Otherwise, the lint or dust will clog the chain joint clearance and prevent penetration of
the oil into the joints.

If abrasives come in contact with the chain, lubrication becomes more difficult. When lubricants are applied
externally, abrasive particles tend to adhere to the chain surfaces and act as a lapping or grinding compound.
Under extreme conditions it is sometimes advisable to avoid chain lubrication.

Petroleum oils should not be used to lubricate chain operating in temperatures exceeding 300°F. Under certain
conditions, chain operating in high temperature atmospheres can be effectively lubricated using finely divided
graphite or molybdenum disulfide in a volatile carrier which upon evaporation of the volatile carrier, leaves a thin
deposit of solid lubricant on the chain joint surfaces.

Consult a lubricant manufacturer for recommendations when chains are required to operate at elevated
temperatures or under other difficult conditions.

Forged Conveyor Chain


Installation and Maintenance Guide

Forged conveyor chains, or drop forged chains as they are often known, are a reliable solution for a diverse
range of conveying applications in industries such as power generation, wood pellet production, hazardous
waste incineration, mineral processing, mining, cement, pulp and paper, grain handling, and food processing.
They are commonly utilized in drag and en-masse conveyors for moving material horizontally or on an incline
up to 90°; using a skeletal chain and flight assembly that is drawn along the bottom section of an enclosed
housing. The flights are either welded or bolted onto the chain links. The links are made of heat treated forged
steel with typical internal core hardness of 300-400 BHN and surface hardness of 500-700 BHN. Its exceptional
combination of internal ductility, external hardness, and high strength-to-weight ratio makes drop forged chain a
durable, dependable, versatile, and severe duty conveying medium.

Chain Installation:
The information below is for guidance only. You MUST follow the equipment manufacturer’s safety, installation,
and maintenance instructions that were provided with the conveyor. Consult your CEMA Conveyor Manufacturer
for more details.

Warning: Observe proper lock-out and tag-out procedures when working on or around the conveyor.

Warning: Ensure that all overload protection systems such as shear pins, overload couplings, and electrical
overload devices are installed and correctly set.

1. Chain replacement should always be combined with the replacement of the sprockets to assure proper
meshing and harmonious action between the chain and sprockets.

2. Ensure that all return rails are inline at the joints.

3. Ensure that the sprockets are centered on the head and tail sections.

4. Ensure that the sprockets are in alignment with each other.

5. Ensure that all set screws and sprocket assembly bolts are properly tightened.

9 of 17
Jonatas Gonçalves JSG goncalvesjonatas@gmail.com +55 11 9 00000000 Order #3991 April 15,
Conveyor 2021
Chain-Installation, Maintenance
& Best Practices-001 - March, 2018
6. Ensure that the chain is installed in the correct direction. The male end of the link always leads the female
end. A direction arrow is normally stamped on the chain link.

Forged link with direction arrow

7. Connect chain strands with connecting pins provided. Never re-use circlips, roll pins or lock nuts.

8. Adjust the take-up to tighten the chain as necessary. Twin strand chain systems must be matched for
equal chain tension. Chain conveyors may have different tensioning systems. Contact your CEMA Conveyor
Manufacturer for more details.

9. A rule of thumb for checking tension is to lift the chain away from the return rail at the mid-point of each
chain strand. A typical amount of lift is 1% of the chain strand center distance; i.e. on a 50’ chain strand the
lift would be 6”.

10. Never over-tension the chain. Excessive noise and/or vibration indicate an over-tensioned chain which
results in accelerated chain and sprocket wear. Bear in mind that the take-up controls the chain tension on
the return strand. The conveying strand is naturally in tension.

11. Run the conveyor empty and listen for unusual snapping, snagging, or popping noises. The chain should
operate smoothly.

12. Inspect the chain regularly, especially during the start-up period. Contact your CEMA Conveyor
Manufacturer for more details.

Chain Maintenance:
The information below is for guidance only. You MUST follow the equipment manufacturer’s safety, installation,
and maintenance instructions that were provided with the conveyor. Consult your CEMA Conveyor Manufacturer
for more details.

Warning: Observe proper lock-out and tag-out procedures when maintaining the drag conveyor.

Warning: Ensure that all overload protection systems such as shear pins, overload couplings, and electrical
overload devices are installed and correctly set.

1. Check for chain elongation by measuring the length of a used strand (10 pitches minimum) and comparing
it to the equivalent length of a new strand. Measurements must be taken while chain is in tension. Chain
replacement is recommended at 2% elongation.

2. Check for chain link wear by measuring the height of the link. Chain replacement is recommended when
the original height has worn by 20%.

3. Inspect chain for damaged flights.

4. Inspect connecting pins for damaged or missing retainers.

5. Inspect sprockets for damaged or worn teeth.

6. Inspect groove depth of idler/trailer wheel. Replace if groove is too shallow to maintain chain engaged to
idler wheel.

7. Inspect sprockets for material build-up in pockets. Replace or repair sprocket cleaner if necessary.
10 of 17
Jonatas Gonçalves JSG goncalvesjonatas@gmail.com +55 11 9 00000000 Order #3991 April 15,
Conveyor 2021
Chain-Installation, Maintenance
& Best Practices-001 - March, 2018

8. Inspect shaft keys and re-torque hub setscrews and sprocket assembly bolts.

9. Inspect chain rails for damage and wear.

10. Damaged links, pins, retainers and flights MUST be replaced; otherwise it may result in further damage
to chain, sprockets and conveyor system.

Chain Drive Wire Mesh Belt


Installation and Maintenance Guide
Chain drive wire mesh belts consist of three major components: wire mesh belt, cross rod supports, and parallel
strands of chain. The density of the wire mesh is selected to provide sufficient product support, while the cross
rod supports are sized and positioned to provide adequate lateral support to the wire mesh while at the same
time connecting the two parallel strands of chain together. This way, the components come together to act as a
single conveyor belt unit.

Belt Installation:
The information below is for guidance only. You MUST follow the equipment manufacturer’s safety, installation,
and maintenance instructions that were provided with the conveyor. Consult your CEMA Conveyor Manufacturer
for more details.

Warning: Observe proper lock-out and tag-out procedures when working on or around the conveyor.

Safety: The installation of a wire belt on a unit handling conveyor presents a number of risks for which precautions
must be taken. First, it is usually necessary to remove some or all of the conveyor guards during the belt installation
process. This exposes the installer to moving components which would normally be shielded. Second, belts of
this type are often quite heavy and difficult to handle. Also there may be sharp edges from ends of the wires at
the belt edges and/or the old belt to be replaced may have broken or damaged sections with exposed wires that
can cut or puncture. As a result, the following minimum safety precautions are strongly advised:
• Wear the proper personal protective equipment.
• Practice the proper Lock-out / Tag-out procedures when working on a conveyor belt installation.
• Do not attempt to make adjustments to the conveyor or the belt while the conveyor is running or when
the belt is moving.
• For elevated temperature applications, allow sufficient time for the belt and conveyor to cool prior to
making adjustments.
The following general guidelines are suggested for the proper installation of a typical chain drive conveyor belt:
1. Pull the belt into the conveyor with a cable or rope. The cable should be attached to a rigid pull bar which
is attached to the belt at the chains only. Secure the leading edge of the woven mesh to the pull bar with
wire ties to keep it from becoming damaged during installation, but allow it to remain slightly slack.
2. Pull the belt into the conveyor slowly; apply even tension to both chains, and do not jerk the belt. Be very
careful not to allow one strand of chain to take all of the tension.
3. Watch the belt carefully as it comes out of the crate. Remove any kinks from the chain or wire mesh fabric
as the belt leaves the crate and before it enters the conveyor.
4. As the belt enters the conveyor, make sure all the spirals on the woven mesh are lying flat. Any spirals
that are turned up and creating a hump in the fabric must be turned to lie flat. If these spirals are not
turned as the belt is installed, they may become permanently deformed as tension is developed in the
belt.
5. Thread the belt completely through the conveyor, top and bottom passes. Join the belt ends together,
preferably on a flat surface, where the two ends can be brought together under no tension. Connect the
woven mesh first, then connect the chains. The chains will generally connect in one of two ways. Either
11 of 17
Jonatas Gonçalves JSG goncalvesjonatas@gmail.com +55 11 9 00000000 Order #3991 April 15,
Conveyor 2021
Chain-Installation, Maintenance
& Best Practices-001 - March, 2018
a cross rod for the belt will be provided that acts as a chain pin, or a standard chain connector link will be
provided. If a cross rod is used, slacken the woven mesh and connect the ends together. Then, insert the
cross rod to act as a chain pin and weld the washers provided to each end of the cross rod (depending on
the type, some belts will have cottered ends on the cross rods). If a standard chain connector is provided,
slacken the fabric and connect the ends together. Then, install the connector link so that the free side
plate is on the outside of each strand of chain.
6. Prior to running the belt, inspect all sprockets for proper engagement with the belt. Pay close attention
to the drive sprockets to ensure that each strand of chain on the belt is engaged in the same sprocket
tooth relative to the chain pitch and/or cross rods. If one strand of chain is installed ahead or behind the
other, the belt may be damaged at start-up. All tail and idler shafts should have only one sprocket keyed
to the shaft. The other sprocket should be free to float rotationally, but constrained from moving laterally.
7. Whenever possible, chains should be lubricated while in operation. For most room temperature
applications, a good grade of light mineral oil should be sufficient. For elevated temperatures, freezing
temperatures,and other special processes, a lubricant manufacturer should be consulted for selection of
the most effective lubricant.

Belt Maintenance:
The information below is for guidance only. You MUST follow the equipment manufacturer’s safety, installation,
and maintenance instructions that were provided with the conveyor. Consult your CEMA Conveyor Manufacturer
for more details.

Warning: Observe proper lock-out and tag-out procedures when working on or around the conveyor.

As most if not all of the belt tension is carried by the parallel strands of chain, probably the most important
maintenance practice to extend the service life of the belt is to keep the chains clean and lubricated. The type
of oil selected depends on the operating temperature of the application, but in most non-elevated temperature
applications, a suitable grade of mineral oil works best. Some mineral oils specifically intended for chain lubricants
also include wear inhibiting additives of which there are also food grade types.

Both the strands of chain and the woven wire mesh will elongate over time and hours of service. Depending on
the application and construction of the conveyor, it may be necessary at times to remove small sections of belt.
This is normal and to be expected. It is also a good time to check the chain length over a given section on each
side of the belt and compare the results. In general, chain lengths from one side of the belt to the other should
be the same to within 1/16” across 10’ of belt or more. If this is not the case, then it is likely that the strand of
chain that is the longest is also under the most load and/or is getting less lubrication. Remedying this problem
sooner rather than later is strongly recommended to preserve the remaining service life of the chain drive belt.

In general, the overall belt can be considered to have reached the end of its useful service life when the strands
of chain will no longer match the sprockets. For most chains, this may be at 2.5 - 3% elongation. However, the
belt may also be in need of replacement if the wire mesh has been sufficiently damaged or worn. Ideally, one
should expect the chains to elongate to the point of creating a severe enough mismatch with the drive sprockets,
but the condition of the mesh may be an even more important consideration when deciding to replace the belt.

Following are some specific guidelines for addressing specific problems or issues with chain drive conveyor
belts:
1. Chain Binding: A chain drive belt is subjected to all of the typical issues that can go wrong with standard
chain, plus the additional complexities caused by the wire mesh itself and the general construction of the
overall belt. Because the strands of chain and the mesh and cross rods must function as a single unit, a
problem or issue on one side of the belt can cause problems on the opposite side. Chain binding can be
the result of an issue with the chain itself, such as lack of sufficient lubrication, or it can result from any
or all of the following:
a. Offset in the sprocket engagement between one side of the belt and the other.
b. Cross rod ends that extend from the side of the chain and are dragging on the side of the conveyor.
c. Drive sprockets that are out of proper position.
d. Bent or twisted cross rod(s).

12 of 17
Jonatas Gonçalves JSG goncalvesjonatas@gmail.com +55 11 9 00000000 Order #3991 April 15,
Conveyor 2021
Chain-Installation, Maintenance
& Best Practices-001 - March, 2018
If necessary, the belt should be placed in proper alignment with the sprockets and the conveyor should
be checked to make sure it is square. If the welds on some of the cross rods have broken and/or the belt
has become twisted or distorted, the belt may need to be replaced unless the damage is limited to a small
portion of the overall belt. If the damage is limited, then possibly that section can be replaced.
2. Chain Wear: Excessive chain wear can be caused by insufficient lubrication, interference with the
conveyor or a guide component, excessive chain tension, or belt/conveyor misalignment. Depending
on the type of wear, check for any interference between the chain(s) and the conveyor itself; also watch
the belt as it tracks to determine if it has a tendency to shift to one side or the other, which may indicate
an alignment issue. Make certain the belt has not been over-tightened (too little belt on the conveyor,
excessive counterweight, etc.). The belt should run with minimum tension possible in order to maximize
its service life. If the chains seem dry and debris-filled, they may lack sufficient lubrication.
3. Chain Jumping Sprockets: This is generally caused by excessive chain elongation or some misalignment
with the sprockets. The chain should be measured (under load) to determine if the elongation has
reached a value where it no longer matches the pitch diameter of the sprockets (approximately 2.5 - 3%
elongation). If the chain pitch is still acceptable, then check the position and alignment of the sprockets.
The sprockets may be too close together or too far apart to match the width of the assembled belt.
The belt may also have a tracking issue causing it to move to one side or the other. The conveyor
alignment should be checked to make sure the unit is square with the shafts and the shafts are parallel
to each other. Check for any interference in the path of the belt which may be forcing it to shift laterally.
4. Woven Mesh Shifting: This is usually related to a belt tracking problem or an issue with the location/
orientation of the support(s) under the wire mesh portion of the belt. The contact between the supports
and the wire mesh may be causing the mesh to shift to one side or the other. This may be causing an open
area on the belt as the mesh is being pulled away from the chain. Check the position of the supports to
see if the mesh is getting caught or restricted, also check the orientation. If possible, the supports should
be oriented in a long, herringbone pattern which points in the direction of travel. Additionally, check for
bent or distorted mesh in the location where the problem is occurring. Lastly, verify proper alignment of
the conveyor support bed with the drive shaft.
5. Sprockets Wearing: Typically caused by the same problems that lead to the chain jumping the sprockets.
Generally a result of chain/belt misalignment, improperly placed sprockets, conveyor misalignment, or
distorted/damaged belt. First check to make certain the correct sprockets have been used. Attempt
to re-position the sprockets if side wear is the issue. If this does not ease the problem, examine the
conveyor for an alignment issue and/or check the chains for excessive elongation. Replace the belt and/
or sprockets as necessary.
6. Slack Mesh: In general, other than on a pocket belt, the mesh should be slightly slack to slightly taut.
Excessive slack in the mesh may be the result of an insufficient number of cross rod supports or a belt
that was manufactured with too much lead in the mesh. The mesh may also have become excessively
worn due to high tension or distorted due to interaction with the conveyor. If the problem is excessive and
is causing issues with product support, the belt may require replacement.
7. Chain Strands Uneven: Presuming there was not an issue with the strands of new chain, then it is likely
the chains have developed unequal wear and elongation. This is most likely due to uneven tension
from one side of the belt to the other or insufficient lubrication of one of the chains. If chain lubrication
is acceptable, then the alignment of the conveyor should be checked and corrected. Depending on the
severity of the problem, the entire belt may need to be replaced.

13 of 17
Jonatas Gonçalves JSG goncalvesjonatas@gmail.com +55 11 9 00000000 Order #3991 April 15,
Conveyor 2021
Chain-Installation, Maintenance
& Best Practices-001 - March, 2018

Plastic Conveyor Chain


Installation and Maintenance Guide

Plastic chains are molded polymer, interconnecting, hinge-like modules (links) of various sizes and configurations
which are connected end to end to form a continuous, flexible conveying element on which, when installed on a
conveyor frame, product in unit form may be transported.

Plastic conveyor chains consist of rigid plastic links which are molded from any one of a variety of durable plastics
and mechanically connected by means of a steel pin. Links may be designed such that the pinned connection
flexes in the longitudinal direction or in both longitudinal and lateral directions, which are commonly referred to
as side flexing (also known as multi-flex and double flex chain). A unique hybrid, two-piece chain design consists
of a steel base-chain onto which rigid plastic top plates are snapped in place.

Plastic conveyor chain is widely used in various product transport applications in industry from single strand
to multi-strand configurations; whether they are straight-running or curved. Its high strength, rigid polymer
construction and array of design features provide for relatively simple installation and low maintenance operation.

Chain Installation:
The information below is for guidance only. You MUST follow the equipment manufacturer’s safety, installation,
and maintenance instructions that were provided with the conveyor. Consult your CEMA Conveyor Manufacturer
for more details.

Warning: Observe proper lock-out and tag-out procedures when working on or around the conveyor.

Safety: As with any power equipment or conveyor system, flat top chain conveyors contain inherent hazards
that must be safe guarded. Protection around the areas where the chain engages the drive sprockets as well
as sprockets and/or idlers at both the infeed and discharge ends is advisable. Interaction of personnel with a
moving plastic chain should be avoided. When necessary, however, such interaction should be in accordance
with ASME, OSHA and CEMA safety standards.

The installation of a plastic chain on a unit handling conveyor presents a number of risks for which precautions
must be taken. Such risks include (but not limited to):
• Removing some or all of the protective guarding from the conveyor during the chain installation process
exposes the installer to moving components which would normally be shielded;
• Pinch points on conveyor and chain, sharp edges of damaged and/or broken links and/or attachments,
etc.;
• Handling plastic chain that is quite heavy and/or cumbersome;
• Handling conveyor components that have recently been operational, including plastic chain belt(s) which
is to be removed, and carry residual effects such as heat, product contamination, damage, etc.
Consequently, the following minimum safety precautions are strongly advised:
• Wear appropriate and proper personal protective equipment.
• Implement proper Lock-out / Tag-out procedures when working on a conveyor belt installation.
• Do not attempt to make adjustments to the conveyor or the belt while the conveyor is running or when
the belt is moving.
• Employ proper tools and/or enlist an assistant when attempting to manipulate and managing a large
plastic chain alone.
• For elevated temperature applications, allow sufficient time for the belt and conveyor to cool prior to
making adjustments.
The following general guidelines are suggested for the proper installation of a typical plastic chain conveyor belt:
1. Pull a short section of the chain through the entire conveyor to detect any obstructions or areas of tight
clearance.

14 of 17
Jonatas Gonçalves JSG goncalvesjonatas@gmail.com +55 11 9 00000000 Order #3991 April 15,
Conveyor 2021
Chain-Installation, Maintenance
& Best Practices-001 - March, 2018
2. Check conveyor for loose components and fasteners; projections including frame components, welding
splash; and contamination on sliding surfaces i.e., metal chips, paint, etc.
3. Ensure wear strip joints and the supporting elements are even, and that the clearance between chain and
chain guides is correct.
4. Establish proper alignment of sprockets and idlers.
5. Properly lubricate entire length of chain, as per manufacturer’s guidelines, with lubricant that is appropriate
for operating conditions and environment. Consult lubricant manufacturer for proper lubricant selection
for high and low temperature applications.
6. Relieve any kinks from the chain and inspect involved links as the belt leaves the crate and before it
enters the conveyor.
7. Thread the chain completely through the conveyor’s top and bottom paths. Join the ends together,
preferably where chain is sufficiently supported so to be managed effectively and ends can be brought
together under minimal tension.
8. Inspect all sprockets for proper engagement with the chain prior to start-up.
9. Where multiple chains are installed on common shafts, all tail and idler shafts should have only one
sprocket keyed to the shaft; remaining sprockets should be free to rotate about the shaft, but constrained
from moving laterally.
10. Upon start-up, run the conveyor without product for 30 minutes to an hour listening for peculiar sounds
i.e., clicking, knocking, squeaking, and look for signs of unusual operation.
11. Repeat step 10 while conveying product.
12. Check catenary sag while belt is in operation to ensure it is within the manufacturer’s recommended
requirements.

Chain Maintenance:
The information below is for guidance only. You MUST follow the equipment manufacturer’s safety, installation,
and maintenance instructions that were provided with the conveyor. Consult your CEMA Conveyor Manufacturer
for more details.

Warning: Observe proper lock-out and tag-out procedures when working on or around the conveyor.

Periodic inspection of the chain, sprocket and conveyor system is required. The conveyor should be inspected
while the system is running as well as when it is shut-off. Items to check for are:
 Survey the conveyor for excessive or unusual wear patterns on the chain, track, or wear-strip; look for
unusual or excessive debris deposits, such as wear debris accumulation on or beneath the conveyor.
 Listen for and locate the source of any unusual noises such as squeaking, clicking or knocking.
 Inspect chain for top surface flatness and unusual and/or excessive wear or grooves.
 Examine sprockets for signs of excessive wear and debris deposits.
 Check that supporting rollers are turning freely.
 Review joints in guide track and/or wear strip to ensure there are no irregular offsets either vertically or
horizontally.
 Look for excessive gaps between links commonly resulting from overload during operation.
 Periodically measure the chain length for inordinate elongation and check height of chain catenary.
 Observe the operation of the chain to detect pulsation or jerky motion.
 Check chain guide track and dead plate clearances to ensure they meet manufacturer’s guidelines.
 Review the insides of corner wear strips and chain guides and note that excessive heat may indicate
tight clearance or high friction.
 Ensure that corner turn discs, if used, are properly aligned and turning freely.

15 of 17
Jonatas Gonçalves JSG goncalvesjonatas@gmail.com +55 11 9 00000000 Order #3991 April 15,
Conveyor 2021
Chain-Installation, Maintenance
& Best Practices-001 - March, 2018
 Check for excessive heat especially in the curves which may indicate an obstruction, impingement, or
high friction area.
 Verify that lubrication system is working correctly.

General Maintenance Guidelines

One of the most important maintenance practices to extend the service life of the plastic chain is to keep it clean;
free of the accumulation of debris. For the most part, plastic chain operates without the need for supplemental
or externally applied lubrication. Guide track and wear strip materials are commonly available with intrinsic
lubrication such as oil infused Nylon and other similar materials. Supplemental lubrications can cause the
accumulation of debris on the chain and guide materials and accelerate abrasion of the same. When externally
applied lubrication is required, such as when running chain in conjunction with metallic guide track or wear strips,
consult your plastic chain supplier for recommendations of appropriate lubricants.
Plastic will elongate over its time in service. Depending on the application, length of chain, and construction of
the conveyor it may be necessary to remove a link or short sections from belt to maintain proper tension and
sprocket engagement. Elongation due to wear and thermal expansion is normal and to be expected. In general,
the length of a chain in use should not exceed 2-3% of the original length. Greater length differential can lead to
engagement failure at the drive sprocket.
It is also necessary to check the length of multiple chain strands running in parallel; measuring individual lengths
along a particular span of conveyor and compare the results. A difference in length can indicate that the longer
strand is being subjected to greater loading. Such added load may be the consequence of chain binding resulting
from improper clearances or lack of lubrication. In order to avoid further operational complications, it is advisable
to search out the cause and correct the problem as soon as it is detected. Prompt attention to the matter will
further serve to preserve the remaining service life of the chain. If an exorbitant difference in chain length exists,
it is not advisable to shorten the longer chain to offset the difference; this accomplished by the catenary pocket
at the drive.
A plastic chain may be considered to have reached the end of its useful service life when it will no longer properly
mesh (engage) with the sprocket. This effect occurs, generally, at approximately 2% elongation. It may be
necessary, however, to replace the plastic chain if the links have been sufficiently damaged or worn negatively
affecting its mesh with the sprocket. Principally, the condition of the mesh will dictate the appropriate time to
replace the plastic chain to best serve the operation of the conveyor and service life objectives. It’s important
to note that as the chain/sprocket engagement degrades, the stresses of driving the chain resolve to fewer and
fewer teeth thereby accelerating sprocket wear and fatigue.
The following guidelines present typical measures for addressing specific performance problems with plastic
chain conveyor belts:
1. Chain Binding: A plastic chain conveyor belt is subject to many of the typical operating influences and
maladies associated with standard chain along with the additional complexities inherent to the unique
construction of the plastic chain design. Chain binding can cause erratic operation resulting in problems
with throughput and product quality. Following are a number of typical conditions that can cause binding
of the chain:
a. Offset in the sprocket engagement between one side of the belt and the other.
b. Drive sprockets that are out of proper position.
c. Hinge pin(s) protruding from the side of the chain and dragging on guide track.
d. Damaged hinge pin(s).
e. Improper clearance between chain and guide track, wearstrip, or accessories i.e., dead plates.
f. Offset or damaged guide track
g. Insufficient lubrication
Properly align the sprockets (and idlers) with each other – in both the horizontal and vertical planes.
Shafts should be adjusted to be parallel and level with each other. Sprocket alignment is also function of
proper conveyor frame alignment; consequently, the conveyor should be checked to ensure it is square
and level.
Prior to chain installation, slide a short section of chain through the conveying path, along the guide track
and/or wear strip in order to detect any areas which bind or create inordinate noise and make necessary
adjustments or corrections.

16 of 17
Jonatas Gonçalves JSG goncalvesjonatas@gmail.com +55 11 9 00000000 Order #3991 April 15,
Conveyor 2021
Chain-Installation, Maintenance
& Best Practices-001 - March, 2018
2. Chain Wear: Excessive chain wear can be caused by interference with the conveyor or a guide
component(s), conveyor and/or component misalignment, excessive chain tension, or lack of sufficient
lubrication. Depending on the type of wear, check appropriate locations on the conveyor for interference
between the chain(s) and the various components. Observing chain movement during operation will
enable the observer to pinpoint areas of irregular motion and focus in on specific elements which require
maintenance or other attention. Verify that the chain has not been tensioned beyond the recommended
limit. Excessive tension could result from insufficient catenary sag, excessive counterweight, chain length
being too short, etc. The belt should run through its path with as little tension possible in order to minimize
power consumption and maximize its service life. If the chain is debris-filled, check to verify whether
lubrication is present (or is recommended).
3. Chain Jumping Sprockets: This is generally caused by misalignment with the sprockets, improper tension,
or excessive chain elongation. Check the position and alignment of the sprockets as well as the depth
of the catenary. The chain should be measured (under load) to determine if the elongation has reached
a value where it no longer matches the pitch diameter of the sprockets (approximately 2-3% elongation).
For conveyors with multiple chain strands in parallel, all but one of the sprockets on the tail (idling) shaft
must rotate freely about the shaft; the center sprocket alone being keyed. If all sprockets on the tail shaft
were keyed, chain and sprocket disengagement will result as the individual strands wear and elongate
differently in time. Disengagement of chain and sprocket may also result from component misalignment;
commonly causing in miss-tracking. The conveyor alignment should be checked to ensure that the frame
is square, the shafts square to the frame, and that they are parallel and level with each other. Check for
any interference(s) along the chain paths (conveying and return) that may be forcing it laterally.
4. Sprockets Wearing: Typically brought about by the same influences that lead to chain/sprocket
disengagement. Generally, sprocket wear follows as a consequence of conveyor and/or component
misalignment, improperly placed sprockets, improper tension, or distorted/damaged chain. First check
to make certain the correct sprockets have been used. Should side wear be the problem, examine the
conveyor for areas of misalignment and the chains for excessive elongation. If these are found to be
within normal limits, reposition the sprockets if possible. Replace the belt and/or sprockets as necessary.
5. Uneven Chain Strand Lengths: Presuming the strands of new chain were properly constructed, it is likely
the chains developed unequal wear and elongation over the course of operation. This is commonly due to
uneven tension across the various chain strands or insufficient lubrication of one or more chains. If chain
lubrication is acceptable, check the alignment of the conveyor and correct as necessary. Depending on
the severity of the unevenness, the entire chain set may require replacement.