Gad Aglr 06 12 17
Gad Aglr 06 12 17
Gad Aglr 06 12 17
START OF RAMP
END OF RAMP
50000 146884(SOLID APPROACH) 18000 18000 18000 18000 18000 18000 18000 18000 18000 18000 40000 18000 18000 18000 18000 18000 18000 18000 18000 18000 18000 103948(SOLID APPROACH) 50000
EXP. JT. EXP.JT. EXP.JT. EXP. JT.
EXP. JT. EXP. JT.
(MIN.)
5500
GL. GL.
STRUCTURAL
RE WALL STEEL GIRDER RE WALL
ROCK LVL.
PSC I GIRDER
A1 P1 P2 P3 P4 P5 P6 P7 P8 P9 P10 P11 P12 P13 P14 P15 P16 P17 P18 P19 P20 A2
102.734
103.233
103.771
104.309
104.847
105.389
105.931
106.469
107.008
108.097
108.097
107.546
107.007
106.469
105.931
105.389
104.847
104.309
103.771
103.233
102.672
99.396 107.546
99.118
99.552
PROPOSED R.T.L.
99.297
99.380
99.913
99.598
99.373
99.375
99.364
99.359
99.339
99.417
99.475
99.427
99.430
99.331
99.278
99.307
99.338
99.373
99.416
99.505
99.552
EXISTING ROAD LEVEL
255.560 89.755
273.560 89.755
291.560 89.755
309.560 90.121
327.560 90.179
345.560 89.872
363.560 91.624
381.560 93.087
399.560 92.541
417.560 91.994
435.560 91.434
475.560 90.233
493.560 90.826
511.560 92.535
529.560 93.537
547.560 93.851
565.560 94.166
583.560 93.332
601.560 92.124
619.560 91.894
637.560 91.894
655.560 91.894
ROCK LEVEL
108.676
760.948
CHAINAGE
OWER
CH: 0+780
CH: 0+800
CH: 0+720
IC
CH: 0+700
CH: 0+660
CH: 0+680
CH: 0+620
CH: 0+640
CH: 0+580
CH: 0+600
CH: 0+520
CH: 0+540
CH: 0+560
CH: 0+500
CH: 0+480
CH: 0+280
CH: 0+300
CH: 0+320
CH: 0+340
CH: 0+360
CH: 0+380
CH: 0+400
CH: 0+420
CH: 0+440
CH: 0+460
CH: 0+740
CH: 0+260
CH: 0+760
CH: 0+240
CH: 0+220
CH: 0+200
CH: 0+180
TR
CH: 0+160
CH: 0+140
CH: 0+120
EC
TO MUMBAI
TATA P
CH: 0+100
EL
C B
CH: 0+80
+60
YOVER
D
CH: 0
E
TO THAN
START OF FL
108.676
END OF FLYOVER
SCOPE OF WORK
AD
E RO EASTERN EXPRESS HIGHWAY
12000
IC
SERV
SUM
760.948
810.948
STAR OF WORK
58.676T OF LUMP
T.B.M. NO.1
R.L. 100.000
GHATKOPAR FLYOVER BRIDGE
BH1 BH2 BH3 BH4 BH6 BH7 BH8 BH9 BH10
BH5
SCOPE
D C
B
E
TO THAN
EXISTING BRIDGE
TO
AGL
WIDTH OF THE CARRIAGEWAY=12000 MAIN SEWER
R
500 500 EXISTING WIDTH OF THE CARRIAGEWAY=12000
CLEAR CARRIAGEWAY=11000
500 11000 500
WEARING OF PIER
COAT
2.5% SLOPE WEARING COAT
2.5% SLOPE PLAN OF PROPOSED FLYOVER DECK SLAB
250MM THK. SCALE 1:1000
1450
STRUCTURAL
DECK SLAB
2500
STRUCTURAL STEEL GIRDER WIDTH OF THE CARRIAGEWAY=12000 EXISTING WIDTH OF THE CARRIAGEWAY=12000
STEEL GIRDER 3000 3000 3000 1500 PSC I GIRDER 500 CLEAR CARRIAGEWAY=11000 500 500 500
CLEAR CARRIAGEWAY=11000
END DIAPHRAGM
BEARING
600
300MM THK.
PEDESTAL 18.0 M SPAN TRAFFIC 40.0 M SPAN ANTICRASH PQC
2.5% SLOPE 2.5% SLOPE
COMPOUND/
DIRECTION 2.5% SLOPE 2.5% SLOPE
BARRIER 100MM THK.
2000
2000
COMPOUND/
4500
FENCING
FRICTION SLAB DLC
4300 225MM THK.
FENCING
5500(MIN.)
3000
DOWN TAKE PIPE POLYMERIC STRIP
FOOTPATH SERVICE ROAD FOOTPATH 7000
CHAMBER 4300
7300
180 600
1500
1500
50MM THK. 40MM THK. PILE CAP
DBM MASTIC PILE CAP
SCARRIFYING 300MM THK.P.Q.C.
3000
THE EXISTING ASPHALT 100MM THK. DLC 100MM THK. PCC 100MM THK. PCC
650 3000 3000 650 650 3000 650 250
CRUST & OVERLAY 225MM THK. WMM GL.
IN BITUMINUOUS 300MM THK. GSB 1000Ø PILE RCC KERB
1000Ø PILE GL.
PORTION
6MM THK. 650
LINER UPTO 6MM THK. RCC FOOTING
100 100MM THK. PCC
LINER UPTO 100 650 3000 650 100
REFUSAL
SECTION B-B REFUSAL SECTION D-D
TYPICAL PLAN FOR PILE CAP CROSS -SECTION OF PROPOSED/EXISTING SOLID APPROACH
OBLIGATORY SPAN DETAIL OF PIER IN SIDE ELEVATION
SCALE:1:150 (OBLIGATORY SPAN) SCALE:1:150
AT OBLIGATORY SPAN (SCALE 1:150)
SCALE:1:150
WIDTH OF THE CARRIAGEWAY=12000 EXISTING WIDTH OF THE CARRIAGEWAY=12000 MATERIAL TABLE :-
500 500 500
500 CLEAR CARRIAGEWAY=11000 CLEAR CARRIAGEWAY=11000 S.NO. ITEM SPECIFICATION
1 CRASH BARRIER M-40
WEARING
COAT 2 PSC I GIRDER, DECK SLAB M-45
240MM THK. 2.5% SLOPE 2.5% SLOPE 3 STRUCTURAL STEEL E 410(Fe 540),IS 2062:2011
DECK SLAB OF PIER
4 PILE , PILE CAP, PIER & PIERCAP M-40
COMPOUND/FENCING
93 MM THK.
DRAINAGE SPOUT 1500 3000 3000 3000 1500 WEARING COAT 5 APPROACH SLAB,RE WALL M-35
240 MM THK.
PSC I GIRDER DECK SLAB 6 LEVELLING COURSE M-20
600
2000
2000
RCC PIER CAP
5000
4800 FOR REINFORCEMENT
100
4400 2000 4400
10800 10 REINFORCEMENT STEEL HYSD GRADE Fe-500 CONFORMING
2000 650 TO IS-1786:2008
DOWN TAKE PIPE RCC PIER FOOTPATH
FOOTPATH FOOTPATH FOOTPATH
SERVICE ROAD FOOTPATH SLIP ROAD SERVICE ROAD SLIP ROAD CUM SERVICE ROAD
RCC PIER NOTES:
1500
CHAMBER 1. ALL DIMENSIONS ARE IN MILLIMETERS, AND ALL LEVELS ARE IN METERS UNLESS OTHERWISE STATED.
4800
3500
2. DIMENSIONS SHALL NOT BE SCALED FROM THE DRAWING ONLY WRITTEN DIMENSIONS SHALL BE FOLLOWED.
50MM THK. 50MM THK. DBM 3. FOUNDING LEVEL SHALL BE APPROVED AT SITE FROM SITE ENGINEER. ANY CHANGE IN LEVEL SHALL BE
1500
SCARRIFYING 40MM THK. SCARRIFYING 40MM THK. MASTIC 4. THE WEARING COAT CONTAINS 40MM MASTIC ASPHALT + 50MM DBM & 3MM THK. WATER PROOFING
THE EXISTING MASTIC THE EXISTING ASPHALT 100MM THK. PCC
THIS DRAWING AND DESIGN IS THE PROPERTY OF TPF ENGINEERING PVT. LTD.
CRUST & OVERLAY ASPHALT CRUST & OVERLAY 1000Ø PILE 5. THE DESIGNS ARE APPLICABLE FOR SEVERE CONDITIONS OF EXPOSURE.
100
IN BITUMINUOUS IN BITUMINUOUS 650 3500 650 6. PROPER COMPACTION OF CONCRETE SHALL BE ENSURED BY USE OF APPROPRIATE TYPE OF VIBRATORS.
PORTION PORTION 7. FILTER MEDIA SHOULD BE PROVIDED FOR RE WALL ACCORDANCE TO CLAUSE 2504.2.2 OF MORTH
6MM THK. TYPICAL PLAN FOR PILE CAP SPECIFICATION (FOURTH REV. 2002).
LINER UPTO (CONTINUOUS SPANS) 8. EMBANKMENT CONSTRUCTION SHOULD CONFIRM TO MORTH SPECIFICATIONS.
REFUSAL (SCALE 1:150) 9. WEAK SOIL BELOW THE BOTTOM OF RE WALL BE REPLACED BY 300mm THK. RUBBLE SOLING & P.C.C.
SECTION C-C LEVELING COURSE 150mm THICKNESS. THICKNESS OF SOLING SHALL BE ADJUSTED AS PER ACTUAL SITE
DETAIL OF PIER IN SIDE ELEVATION CONDITION.
CROSS-SECTION AT VIA DUCT AT CONTINUOUS SPAN 10. UTILITY SURVEY SHOULD BE CARRIED OUT BY CONSTRUCTION AGENCY BEFORE EXECUTION OF WORK.
SCALE:1:150 11. NO PUBLIC UTILITIES SERVICES SHALL BE CARRIED OVER THE DECK/RAMP.
SCALE:1:150
CONSULTING ENGINEERS:
DATE 20-11-17 SIGN CLIENT: OWNER : PROJECT: DESIGN & CONSTRUCTION OF SOUTH BOUND FLYOVER AT THE