Zoomlion Crawler Crane QUY260 - Operating Manual
Zoomlion Crawler Crane QUY260 - Operating Manual
Zoomlion Crawler Crane QUY260 - Operating Manual
CY
QUY260
QUY260/20.CY
QUY260S/20.1
CRAWLER CRANE
QUY260
Operating manual
QUY260CR/20.1
2013.10
Contents
0 Foreword .................................................................................. 0066340-200-00Y.C
2.2 Terminology
2.2.1 Boom configuration
I
QUY260YM/20.1
4.4.10 Anemometer
4.5.3 Operation of synchronizing A-frame and main boom derricking winch and
II
QUY260YM/20.1
III
QUY260YM/20.1
6.1 General
IV
QUY260YM/20.1
6.2.2 Maintain and inspect superstructure every month or every 100 hours
6.2.3 Maintain and inspect superstructure every 3 months or every 250 hours
6.2.4 Maintain and inspect superstructure every 6 months or every 600 hours
6.3.2 Maintain and inspect undercarriage every month or every 100 hours
6.3.3 Maintain and inspect undercarriage every 3 months or every 250 hours
6.3.4 Maintain and inspect undercarriage every 6 months or every 600 hours
6.6.5 Fuel
6.6.6 Coolant
7.1 General
7.3.1 Inspections
V
QUY260YM/20.1
VI
0066340-200-00-20CY
Foreword
Thank you for purchasing ZOOMLION crawler crane produced by Changsha Zoomlion Heavy
Industry Science & Technology Development Co., Ltd. We are glad to provide high quality and
high-efficiency service for you.
The operating manual are intended to put you in a position to operate the crane safely and utilize
its capabilities to the fullest extend possible.
Certain terms are used in the operating manual, and in order to avoid misunderstandings while
operating, these terms should be used consistently.
Danger: Only qualified and especially trained personnel are permitted to work on the crane!
All regulations and guidelines applicable to the job site, such as accident prevention regulations
and all guidelines and regulations stated in the Operating Manual must be strictly adhered to.
All accident prevention and operating guidelines and regulations, etc. assume that the crane is
strictly used for lifting and transporting of loads, which are not stuck. Any other application or use
does not constitute specified and proper use.
Any risks associated with unspecified and improper use are the sole responsibility of the crane’s
owner, operator or user.
Always keep the operating manual handy in the driver’s and crane cab-it is an integral part of the
crane. Operate this crane if you are well familiarized with the capabilities and limitations of the
crane, and always follow these operating instructions.
If you have received additional information about the crane from us, e.g. in the form of technical
information letters, then this information must also be followed and kept with the operating manual.
If there is anything in the operating manual or the individual chapters that you do not understand,
please do no hesitate to ask us or our agents before you begin operation.
No parts of the operating manual may be copied or distributed, nor used for competitive purposes.
0066340-200-00-20CY
The content with respect to the safety is marked with“ ”, the safety instructions involved in the
book are only the conventional contents.
The operating manual must be read and the regulations in it must be observed by all persons
operating, maintaining, or otherwise working in any capacity on this crane.
The employer shall comply with the manufacturer's specifications and limitations applicable to
the operation of any and all cranes and derricks. Where manufacturer's specifications are not
available, the limitations assigned to the equipment shall be based on the determinations of a
qualified engineer competent in this field and such determinations will be appropriately
documented and recorded. Attachments used with cranes shall not exceed the capacity, rating, or
scope recommended by the manufacturer.
A thorough, annual inspection of the hoisting machinery shall be made by a competent
person, or by a government or private agency recognized by the U.S. Department of Labor. The
employer shall maintain a record of the dates and results of inspections for each hoisting machine
and piece of equipment.
Notes:
The following terms that are used in the operating manual “Note”, “Caution”, and “Danger” are
intended to point out certain important rules of conduct to all persons who work with the crane.
The term “Note” is used whenever the observance of certain instructions or notes is economically
meaningful to the utilization of the crane.
The term “Caution” is used whenever damage to the crane can occur if the operating instruction(s)
is not observed and adhered to.
The term “Danger” is used whenever the nonobservance of the warning given may insure or lead
to the death of persons and damaged to the crane.
Safety device
The safety devices built into the crane system deserve your special attention. They must always
be checked to see that they are functioning properly. If they do not function or function incorrectly,
the crane may not be operated. Your motto must always be Safety First.
Caution:
When welding work is conducted on crane, the operator should unplug all power source plugs of
controllers, otherwise, he should bear all consequences incurred.
Chapter1 Safety instructions
0066340-200-01Y.C
1.1 Notes
a) Read this manual and familiarize yourself with any associated documentation before
operating this product.
b) Ensure that a copy of this manual is available for any persons installing, using,
maintaining or repairing this equipment.
Initial commissioning and staring must only be undertaken by a competent person who
has read and fully understands the information provided in the manual pack.
c) To avoid the risk of electric shock always isolate this equipment from the supply prior to
carrying out any maintenance adjustment or removing any guards or covers.
d) Always follow the procedures outlined in the operating and maintenance instruction.
f) Only trained personal can be allowed to install, set, operate, maintain, and decommission
this equipment.
a) You can be injured if you do not obey the safety instructions as indicated on warning
stickers.
b) Ensure that safety instructions and warnings attached to the plant are always complete
and perfectly legible
d) Replace unreadable or missing labels with new ones before operating the plant. Make
sure replacement parts include warning or instruction labels where necessary.
Caution:
To assure personnel safety, all safety instructions and warnings should be observed; for the
position of labels and warnings, please refer to Chapter 3 “Safety Guidelines”
c) Do not use this equipment before the portable fire extinguisher with a basic minimum
extinguisher rating of 5 BC is installed in the cab and minimum 10 BC outside the cab.
1.4 Features for Operator Saf
a) Safety components – crane emergency stop buttons. Ensure all Guards are bolted down.
0066340-200-01Y.C
b) Steps, handrails, tread plates and fixed guards are provided where personnel are
required to climb on the machine.
4) Improperly disposing of waste can threaten the environment and ecology and is
illegal.
5) Potentially harmful waste used on this equipment includes such items as oil, fuel,
coolant, filters and batteries, ect.
6) Use leak proof containers when draining fluids. Do not use food or beverage
containers that may mislead someone into drinking from them.
7) Do not pour waste onto the ground, down a drain or into any water source.
8) Ensure that all consumables and replaced parts are disposed of safely and with
minimum environmental impact.
b) Where possible when working close to engines or machinery, only do so when they are
stopped. If this is not practical, remember to keep tools, test equipment and all other parts
of your body well away from the moving parts.
c) For reasons of safety, long hair must be tied back or otherwise secured, garments must
be close fitting and no jewellery such as rings may be worn.
2) Safety Glasses/Goggles
3) Hearing Protection
5) Safety Boots
0066340-200-01Y.C
6) Industrial Gloves
The product and local conditions will affect the noise levels.
The sound pressure level and sound power level, measured using EN13000 Annex G and
2000/14/ EC standards is respectively 73.9dB (A) and 107dB (A)
The sound pressure level measured using ISO 7731 at the position 3′3″ away from the warning
device is 97.7dB(A).
1.8 Vibration Levels
Suitable seating has been installed to reduce the risk of whole body vibrations, in line with
current industry standards.
The crane body vibrations, measured using ISO 2631-1 under normal operating condition, is A(1):
1.3m/s2,A(4):0.6m/s2,A(8):0.4m/s2
a) This vehicle must only be driven and the crane operated by a suitably qualified operative
who holds a current license in line with National/ International legislation.
b) Understand the service procedure before doing work. Keep area clean and dry.
d) Keep hands, feet and clothing clear of power driven parts and in running nip-points.
e) Keep all parts in good condition. Ensure that all parts are properly installed. Fix damage
immediately. Replace worn and broken parts. Removed any build up of grease, oil and
debris.
g) Disconnect battery ground cable and ECM connecting cable and unplug all plugs of
controllers before welding on machine.
h) During maintenance only use the correct tool for the job.
i) Never make any modifications, additions or conversions which might affect safety without
the manufacturer’s approval.
j) In the event of safety relevant modifications or changes in the behavior of the machine
during operation, stop the machine and lock out immediately and report the malfunction
to the competent authority/ person.
k) No modifications or additions which affect the capacity or safe operation of the equipment
shall be made by the employer without the manufacturer's written approval. If such
modifications or changes are made, the capacity, operation, and maintenance instruction
0066340-200-01Y.C
plates, tags, or decals, shall be changed accordingly. In no case shall the original safety
factor of the equipment be reduced.
a) Any work on and/ or with the machine must be executed by trained, reliable and
authorized personnel only.
b) Maintenance work must only be undertaken by suitable qualified engineers with specialist
knowledge of this equipment.
c) Work on the hydraulic system must be carried out only by personnel with special
knowledge and experience of hydraulic equipment.
a) Standard operation
1) Take necessary precautions to ensure that the machine is used only when in a safe
and reliable state.
2) Operate the machine only for it’s designed purpose and only if all guarding, protective
and safety orientated devices, emergency shut-off equipment, sound proofing
elements and exhausts, are in place and fully functional.
3) Ensure that any local barriers erected to stop unauthorized entry to this equipment
are in place.
b) Malfunction
In the event of any malfunction or operational difficulty, stop the machine immediately.
c) Unguarded areas
1) In-running nip points on moving machinery can cause serious injury or even death.
2) Do not reach into unguarded machinery. Your arm could be pulled in and amputated.
3) Switch off the machine before removing any safety devices or guarding.
4) Limit access to the machine and its surrounds where appropriate erect barrier guards
to reduce the risk of residual mechanical hazards, falling lifted loads.
Observe the adjusting, maintenance and intervals set out in these operating instructions,
except where:
3) Always read instructions supplied with replacement of parts and equipment. Ensure
0066340-200-01Y.C
a) Isolation
When undertaking maintenance and repair work, the plant must be first made safe.
Prior to staring any maintenance work, ensure the machine is positioned on stable and
level ground and has been secured against inadvertent movement and bucking.
1) Always observe handling instructions itemized in this manual, the Original Equipment
Manufacturer’s Manuals or the Spare Parts Supplier’s instructions.
2) Never allow untrained staff to attempt to remove or replace any part of the plant.
4) To avoid the risk of accidents, individual parts and large assemblies being moved for
replacement purposes should be carefully attached to lifting tackle and secured. Use
only suitable and technically adequate lifting gear supplied or approved by the
supplier.
6) Limit access to the machine and its surrounds where appropriate erect barrier guards
to reduce the risk of residual mechanical hazards, falling lifted loads.
d) Climbing, falling
1) Falling from and/ or onto this machine could cause injury or even death.
3) Always keep the area around the machine clear of debris and trip hazards.
5) For carrying out overhead assembly work always use specially designed or otherwise
safety-oriented ladders and working platforms.
6) Only use any walkway/ platforms provided on the machine or on an approved safe
and secure platform.
7) Only use CE certified safety harness when reaching any points 3′3″ or more above
the ground level.
8) Keep all handles, steps, handrails, platforms, landing and ladders free from dirt, oil,
0066340-200-01Y.C
1) Prior to undertaking all but normal planned maintenance activities, it is essential that
a method statement regarding safe working practices for the job in hand is produced.
2) Restrict access to the maintenance area to essential staff only. Where appropriate
erect barrier guards and post warnings.
4) If a marshal is used to provide instructions, the marshal must be within sight or sound
of the operator with an all round view of the operation.
5) Always ensure that any safety fitment such as locking wedges, securing chains, bars
or struts are utilized as indicated in the operating instructions.
6) Particularly make sure that any part of the plant raised for any reason is prevented
from falling by securing in a safe reliable manner.
2) Do not direct power washers near or into control boxes and devices.
3) After cleaning, examine all fuel, lubricant, and hydraulic fluid lines for leaks, loose
connections, chafe marks and damage. Any defects found must be rectified without
delay.
1) All safety devices (control device or guard) temporarily removed for set-up,
maintenance or repair purposes must be refitted and checked immediately upon
completion of the maintenance and repair work prior to operation.
2) Never operate the machine with safety devices and guards removed or unsecured.
3) Always report any defects regarding guards, safety device or control devices.
1) Only refuel with diesel from approved storage and supply equipment.
3) Never remove the filler cop, or refuel, with the engine running.
4) Never add gasoline or any other fuels mixed to diesel because of increased fire or
0066340-200-01Y.C
5) Do not carry out maintenance on the fuel system near naked lights or sources of
sparks, such as welding equipment or whilst smoking.
7) Immediately clear up spilt fuel and dispose of correctly to minimize any environmental
impact.
When working with the machine, maintain a safe distance form overhead electric lines.
If overhead cables are in the vicinity a risk assessment must be completed prior to
operating this equipment.
b) Machine - Electrical
The electrical equipment of the plant is be inspected and checked at regular intervals.
Defects such as loose connections or scorched or otherwise damaged cables must be
rectified immediately. Use only original fuses with the specified current rating. Switch off
the machine immediately if trouble occurs in the electrical system.
c) Battery
1) Always disconnect battery leads before carrying out any maintenance to the electrical
system.
3) The battery contains sulphuric acid, an electrolyte which can cause severe burns and
produce explosive gases.
a) Always operate internal combustion engines out of doors or in a well ventilated area.
b) If plant is operated for maintenance purposes in an enclosed area, ensure that there is
sufficient ventilation or provide forced ventilation.
d) Dust found on the plant or produced during work on the plant must not be removed by
blowing with compressed air.
e) Toxic dust/ waste must only be handled by authorized persons dampened, placed in a
sealed container and marked, to ensure safe disposal.
a) Welding, flame cutting and grinding work on the plant must only be carried out if this has
been expressly authorized, as there may be a risk of explosion and fire.
b) No welding should be undertaken on this equipment as it will affect its structural integrity.
a) Work on hydraulic system must be carried out by persons having special knowledge and
experience of hydraulic system.
b) Check all lines, hoses and screwed connections regularly for leaks and obvious damage.
Repair damage immediately. Splashed oil may cause injury and fire.
c) Always relieve pressure from the hydraulic system before carrying out any kind of
maintenance or adjustment.
d) Depressurize all system sections and pressure pipes to be removed in accordance with
the specific instructions for the unit concerned before carrying out any repair work.
e) Hydraulic lines must be laid and fitted properly. Ensure that no connections are
interchanged. The fittings, lengths and quality of the hoses must comply with the
technical requirements.
h) Hydraulic fluid under pressure can penetrate the skin causing serious injury. Once the
fluid is injected under the skin, seek medical help immediately.
i) If the fluid is injected under the skin, seek medical help immediately.
1.13.5. Necessary clothing and personal belongings shall be stored in such a manner as to not
interfere with access or operation.
1.13.6.Tools, oil cans, waste, extra fuses, and other necessary articles shall be stored in the tool
0066340-200-01Y.C
box, and shall not be permitted to lie loose in or about the cab.
1.13.7.The employer shall comply with Power Crane and Shovel Association Mobile Hydraulic
Crane Standard No. 2.
1.13.8.Operating and maintenance personnel shall be made familiar with the use and care of the
fire extinguishers provided.
1.13.9 Modified, altered and / or repaired cranes
the employer of the crane must conform with the requirements of 1926:1412
1.13.10 Wire rope inspections
the employer of the crane must conform with the requirements of wire rope inspections as per
the requirements of 1926.1413
1.13.11 Wire rope—selection and installation criteria
the employer of the crane must conform with the requirements of wire rope selection and
installation as per the requirements of 1926.1414
Chapter 2 Description of the crane
0066340-200-02Y.C
2.2 Terminology
2.2.1Boom configuration
S SL SW SF SFV
0066340-200-02Y.C
Configuration Parameters
Description
no.
S = 95′1″~252′6″
SF Fixed jib on heavy duty boom
F =34′9″~98′5″
2.8
1.1
1.2 2.7
2.6
1.3
1.5
1.4
1.6
1.7
1.8
1.9
Note:
The luffing jib derricking winch (2.8) is optional.
0066340-200-02Y.C
Travel gear
Maintenance-free crawler travel gear with 3′11″ track pad;
Distance between track center: 20′11″
Travel device
The crawlers driven independently through hydraulic motor and planetary reducer;
Allow such traveling moments available as traveling straight ahead/ backwards, turning on
the spot, turning with a crawler and differential steering
Drive performance
Infinitely variable speed from 0 to 0.98km/h
2.3.2 Crane superstructure
Slewing table
Self-manufactured and high-rigid welded structure of high-strength structural steel;
Connected to undercarriage via a 3-row roller slewing ring for 360°continuous rotation
Crane engine
6-cylinder four cycle diesel engine, manufactured by America Cummins, type QSL9-C305;
displacement :8.9L water-cooled, turbo charge, air cooling(air- air)
Rated power/rotational speed: 227kW (305HP) / 2000rpm;
Maximum torque/ rotational speed: 1505N.m /1400rpm
Type of starting equipment and voltage if applicable----- staring motor and 24V voltage
altitude limitations-----≤9997′5″
Crane drive
Driving force, provided by diesel engine, is transmitted by transfer case to a dual variable
pump, a piston variable pump and a dual gear pump.
Crane control
CAN bus technology connecting engine, PLC controller and digital display;
All motions controlled independently by two 4-way control levers.
0066340-200-02Y.C
Winches
Used in hoisting mechanism and derricking mechanism
Slewing mechanism
Hydraulically powered by axial piston variable displacement pump and planetary reducer with
spring-loaded multi-disk brake;
The infinitely variable slewing speed from 0 to 1.0rpm by closed oil circuit.
Hoisting mechanism
available line pull------210kN(the six layer)
permissible line pull------147kN(the six layer)
available line speed-----109m/min(the six layer)
Rear counterweight
187400 Ib, consisting of 10 counterweight plates 14600 Ib each and a 41900 Ib
counterweight base plate;
Fitted on the tail end of crane superstructure
Crane operator’s cab
Pressure-proof steel construction cab with safety glass;
With operator’s seat, operating and control instruments;
Swiveling sideways and tiltable backwards
Safety equipment
Angle indicator, load moment limiter, hoisting limit switch, overflow valves, support cylinder
locking device, derricking (luffing) limiter and so on
Electrical system
Single wire system; 24v DC; negative ground
The crane classification group is A1, and the classification group of working mechanism are:
traveling mechanism (M1), slewing mechanism (M2), hoisting mechanism (M3) and
derricking mechanism (M2).
Pumps
Type------ A8V0140LA1H2/63R1-NZG05F174
engine to pump speed ratio-----1.04
flow, L/min (gpm) at specified pressure, kPA (psi), and speed, rpm------2*285 L/min
b) Speed
Hoisting winch 1
360′9″ /min (maximum speed of single rope, the Φ1.12″
6th rope layer)
Hoisting winch 2
360′9″/min (maximum speed of single rope, the 6th Φ1.12″
rope layer)
Main boom derricking 95′1″m/min (maximum speed of single rope, the Φ1.12″
winch 6th rope layer)
Luffing jib derricking 150′10″/min (maximum speed of single rope, the Φ1.12″
winch 6th rope layer)
Slewing mechanism 0 - 1.0rpm
Gradeability 30%
Type of load hook Maximum rope reeving Weight of load hook (Ib)
573300 Ib 20 9300
352800 Ib /220500 Ib 12/8 6200
110250 Ib 4 3900
66150 Ib 2 2400
35280 Ib 1 2000
Note:
1. If crane is working with hoisting rope reeving less than the value listed in the above
table, single hoisting rope load must be checked to make sure that the max.
permissible load capacity of single hoisting rope is not exceeded.
2. Maximum permissible load capacity of single rope is 33100 Ib.
0066340-200-02Y.C
Note: The main boom lifting height curve is drawn without considering boom deflection.
Note:
1. The horizontal direction indicates working radius (in ft) and the vertical direction indicates
lifting height (in ft).
2. For S boom configuration, the heavy duty boom length varies from 65′7″~272′3″;
For SL boom configuration, the light duty boom length varies from 282′1″~311′8″.
0066340-200-02Y.C
Note:
1. The horizontal direction indicates working radius (in ft and the vertical direction
indicates lifting height (in ft).
2. For SF boom configuration, the main boom length varies from 95′1″~252′6″, the
fixed jib length varies from 34′9″~98′5″ and offset angle of fixed jib is 10° and 30°.
0066340-200-02Y.C
Note:
1. The horizontal direction indicates working radius (in ft) and the vertical direction
indicates lifting height (in ft).
2. For SFV boom configuration, the main boom length varies from 134′5″~252′6″ the
heavy fixed jib length is 19′8″, and offset angle of fixed jib is 14° and 20°.
0066340-200-02Y.C
Note:
1. The horizontal direction indicates working radius (in ft) and the vertical direction
indicates lifting height (in ft).
For SW boom configuration, the main boom length varies from 75′5″~203′4″
0066340-200-02Y.C
The valid lifting capacity charts for all machine configurations can be found in a special
volume.
Note:
1. The values in lifting capacity charts are applicable to 360° working range.
2. The value in lifting capacity charts is the rated total lifting capacity of crane,
which is the maximum permitted lifting capacity under various boom
configurations. It includes the weight of load hook, wire rope and other load
handling devices.
3. The radius in lifting capacity charts is the horizontal distance from central axle of
slewing ring to centerline of hook when crane is loaded.
4. The rated total lifting capacity indicates the crane’s lifting capacity under
different boom configurations when it is operated on firm and flat ground.
Chapter 3 Safety Guidelines
0063640-200-03.CY
The crane operator must obtain or receive the necessary information (familiarize himself with
the operating manual, basic knowledge about pneumatic, electrical and hydraulic drive, and
notes for safe operation as well as operating environment) before starting the crane operation,
in particular:
d) Influence of communal facilities ( including the overhead high/low voltage lines and
;
underground gas pipes)
k) Other factors affecting the site (e.g. weather, live lines, etc.);
m) Take appropriate measures to keep people unconcerned and equipment away from the
working area;
n) Equipment modifications: the employer of the equipment shall adhere to the requirements
of 1926:1434
Based on the above information, the crane operator must assemble the equipment required to
operate the crane:
- Counterweight
0063640-200-03.CY
Caution:
1. A correct and complete operational planning is vital for safe and problem-free
operation of the machine. The operation planner must plan a safe and reliable
operational planning by obtaining and analyzing all necessary information about
the operation and considering all the factors that may impair safety of crane
operation.
2. If the crane operator does not possess all necessary and required information, it
may prove impossible to carry out the intended work and accidents may be the
result!
The crane operator’s primary responsibility is to control, operate and adjust the crane in a
manner that is safe for both himself and others. Therefore the crane operator should meet
the following requirements.
a) The operator must be familiar with the operating manual for the crane, and know the
working principle, structure performance and the safety devices’ function, as well as
master the operation essentials and maintenance skills.
b) The operator should inspect brake, hook, wire rope and safety device before operating
the crane. Any irregularities detected during inspection should be removed
immediately.
c) The operator must focus his attention on his work during operation and is forbidden to
chat with others. Generally speaking, operator can only follow signal sent out by
appointed persons. For a stop signal, the operator should obey it at all times, no matter
who gives it. He should refuse to accept signal which violates operation regulations.
0063640-200-03.CY
d) Operator who is in low spirits or poor healthy is not allowed to operate the crane.
e) Crane operator and slinger/banks man should be familiar with safety rules, signals and
symbols. Prohibit drinking and driving.
f) Be qualified with the work in hearing, eyesight and reaction ability; be strong enough to
operate safely, and has the ability to estimate distance, height and clearance correctly.
g) Be familiar with the usage of fire extinguishing equipment and be well trained; know
how to survive under emergent conditions.
h) Make sure that only authorized personnel are allowed to operate the crane.
To make sure that the crane is kept in good working order, the crane operator should
perform the following checks before operating the crane:
a) Check the daily record of work to ensure that all regular inspections, maintenance and
repair work is performed.
b) Check the hoisting limiter, boom angle indicator, tilting-back support and other safety
equipment for functional work;
c) Check the load-bearing parts carefully, such as wire rope (hoisting rope, derricking
rope and sling etc.), boom, outriggers, hook and load handling devices;
d) Check if there are some bolts, nuts and pins lost, and the components are cracked or
damaged.
e) Ensure that no modification has been made to the crane without permission, e.g.,
increase or decrease in counterweight plate and improper repair of boom frame.
g) Check all control mechanisms for functional work after starting up the engine.
i) Check the brakes. Test the braking performance by lifting a load away from the ground and
suspend it in the air for a moment.
The following improper operating errors, which are made again and again while operating,
should be avoided.
c) diagonal pulling of the load to be lifted which is still in contact with the ground;
f) driving(or slewing) too fast with a load, or setting up and loading on an uneven surface;
h) swinging of suspended load, crashing into bridges, roofs or high voltage wiring;
The rigger’s job is to hang or detach load from hook and to decide which hook or component to
be used in accordance with work plan. rigger also has the responsibility to guide operator’s safe
operation.
d) Be able to estimate the load, balance the load and judge the distance, height and
clearance correctly;
f) Be able to choose proper load handling device and components according to the loading
condition;
h) Be able to safely use audio equipment (such as interphone) to send out oral order
exactly and clearly;
j) Make sure that only authorized personnel are allowed to carry out work.
0063640-200-03.CY
The main job of signalman is to assist crane operator to carry out safe operation. Potential
damage to property or personal injury could be avoided if the crane operator carries out the
crane movement following the signals given out by appointed signalman. However, only
one signalman may work with the crane operator at a time.
Qualifications for signalman:
a) Familiar with the lifting task so as to cooperate with crane operator and other workers;
b) Make sure that only authorized personnel are allowed to carry out
work;
c) Be qualified with the work in hearing, eyesight and reaction;
d) Be able to estimate the distance, height and clearance correctly;
e) Be trained in hand signals for operating and familiar to use them;
f) Use standard hand signals for crane operation. If necessary, use a
radio device to send out correct and clear order;
g) Be capable of conducting the operating of crane to move the load safely;
h) Position himself in a safe location from where he can see the whole process of
operation and be seen clearly by the crane operator.
Danger:
In order to assure yourself and other person’s interest, please operate crane in
accordance with specified regulations, and take precautions against possible
dangers caused by improper operation.
a) Any unsafe operation must be corrected or any dangerous situations must be reported
to supervisor.
b) All the persons in vicinity of crane must observe the acoustic warning signals of the
machine so as to ensure himself and others safety.
c) All the worker must know about the content of task and working sequence;
d) Check whether dangerous situations occur during operation of the machine, and inform
crane operator and signalman of the unsafe factors such as high-voltage power line,
unauthorized persons, obstacles and poor ground conditions.
It is very important to choose an appropriate location for crane operation in order to minimize
safety risks. The operating site should be selected so that:
a) crane movement can be carried out within the smallest possible radius;
0063640-200-03.CY
d) Accessible areas within the swing radius of the rear of the rotating
superstructure of the crane, either permanently or temporarily mounted, shall
be barricaded in such a manner as to prevent an employee from being struck
or crushed by the crane
Danger:
The most essential requirement for safe crane operation is working on firm ground with the
capacity to support you loads.
The crane may not be set up too close to slopes or trenches. A safety distance must always
be kept from them depending on the type of soil.
Note:
Safety distance is measured from the foot of the trench and is:
Danger:
If a safe distance is not maintained, the slope or trench must be firmly filled. Otherwise,
there is a danger that the edge of the slope or trench will give away.
1. asphalt; 5 - 15
Caution:If there is any doubt about the load-bearing capacity of the ground at the operating
site, soil test should be carried out, for example, with a penetrometer.
The safety condition of the crane should be checked thoroughly prior to operating the crane,
including:
d) Check whether there are live electrical wires within the working range of the crane.
e) Check whether there are obstacles which will hinder required crane operation.
working radius:
0063640-200-03.CY
Caution:
The crane operation belongs to dangerous operation; so much attention should be given to
the working condition of crane before and during crane operation.
Before beginning any work, the crane operator must be convinced that the crane is in safe
operating condition. All safety devices, such as load moment limiter, hoist limiter switches,
brakes, etc., are in good working order.
a) The load moment limiter must be set according to the current crane configuration.
b) The load capacities as given in the load lifting capacity tables must be adhered to. The
loads given in the load lifting capacity tables must not be exceeded.
c) The crane operator must know the weight and dimensions of the load before operating
the crane.
d) Load handling devices, lifting equipment and tackle must be in accordance with specified
requirements.
e) It must be ensured that the weight of the hook block and the weight of the tackle are
subtracted from the load given in the lifting capacity table.
Example:
3.2.6.1 Counterweight
Danger:
If the counterweight is not installed according to the lifting capacity table, there is a danger
of the crane toppling over.
The lifting capacity of the crane is a function of the tension force of the hoisting rope and
hoisting rope reeving. When working with a single cable, the crane can only lift as much of
a load as the hoisting gear is able to pull.
If the load to be lifted is heavier than the hoisting gear is capable of lifting, the hoisting rope
must be configured using block and tackle principles by appropriate reeving between the
pulley head on the boom and the hook block. Possible hoisting rope reeving is listed as
follows:
7 207270 14 388080
Caution:
1. If crane is working with hoisting rope reeving less than the value listed in the above table,
single hoisting rope load must be checked to make sure that the max. permissible lifting
capacity of single hoisting rope is not exceeded.
3. If the maximum tensile force is exceeded, there is the danger that the rope(s) may break or
that the hoisting gear and /or drive motor may be damaged.
0063640-200-03.CY
a) All components of crane are in running-in state at the initial operating period. So, for the
first 100 operating hours, the working load should not be too great and the working speed
should not be too high. The maximum lifting load can not exceed 80% of its rated load.
And the maximum working speed is forbidden.
b) The ground on jobsite should be firm and flat and the gradient should not be greater than
5/1000. The complete vehicle should be level and the supporting ground should not give
away during operating. If the ground is soft, a steel plate should be placed under the track
shoe.
c) The permitted temperature range for crane’s operation is-20℃~40℃. Humidity should
not exceed 85%; however, high humidity up to 100% is only permitted for a short period
of time. The crane should be operated and supported on a ground lower than 1000m
above seal level.
0063640-200-03.CY
d) The maximum in-service wind speed should be not more than 9.8m/s during operation;
the maximum out-of-service wind speed should be no more than 21m/s when only main
boom is assembled, and no more than 15m/s when fly jib is assembled.
With the following table, the wind force and wind velocity can be estimated correctly:
e) When crane is working near the high-voltage power line, the safe clearance between any
part of crane and overhead power line should comply with the following regulations:
Cutline:
Note: the volue that follows “to” is up to and includes that value ,for example over 50 to 200
means up to and including 200kv.
Opertion in transit with no load and boom or mast lowered
Ft(m)/Note(l)
Up to 0.75 4/1.22
bb) For lines rated 50 kV. or below, minimum clearance between the lines and any part of the
crane or load shall be 10 feet; Except where electrical distribution and transmission lines have
been deenergized and visibly grounded at point of work or where insulating barriers, not a part
of or an attachment to the
cc) For lines rated over 50 kV, minimum clearance between the lines and any part of the crane or
load shall be 10 feet plus 0.4 inch for each 1 kV. over 50 kV., or twice the length of the line
insulator, but never less than 10 feet;
dd) In transit with no load and boom lowered, the equipment clearance shall be a minimum of 4
feet for voltages less than 50 kV, and 10 feet for voltages over 50 kV, up to and including 345
kV., and 16 feet for voltages up to and including 750 kV.
ee) A person shall be designated to observe clearance of the equipment and give timely warning
for all operations where it is difficult for the operator to maintain the desired clearance by
visual means;
ff) Cage-type boom guards, insulating links, or proximity warning devices may be used on cranes,
but the use of such devices shall not alter the requirements of any other regulation of this part
even if such device is required by law or regulation;
gg) Any overhead wire shall be considered to be an energized line unless and until the person
owning such line or the electrical utility authorities indicate that it is not an energized line and
it has been visibly grounded
e) Overloading operation and lifting staggered load is prohibited. Never pull load
obliquely.
0063640-200-03.CY
g) The crane can travel with a load of 70% of the rated load. In this case, the ground
should be firm and its gradient should not be more than 5/1000. The driving speed
must be less than 0.5km/h. The boom frame must be located in the driving
direction.
aa) Prior to work near transmitter towers where an electrical charge can be induced in the
equipment or materials being handled, the transmitter shall be de-energized or tests shall be
made to determine if electrical charge is induced on the crane. The following precautions
shall be taken when necessary to dissipate induced voltages:
bb) The equipment shall be provided with an electrical ground directly to the upper rotating
structure supporting the boom; and
0063640-200-03.CY
cc) Ground jumper cables shall be attached to materials being handled by boom equipment
when electrical charge is induced while working near energized transmitters. Crews shall be
provided with nonconductive poles having large alligator clips or other similar protection to
attach the ground cable to the load
dd) Combustible and flammable materials shall be removed from the immediate area prior to
operations
i) The brake of hoist mechanism is not allowed to be adjusted when the crane is
lifting a load.
j) Under any condition, there must be three windings of wire rope left on the hoisting
drum.
k) When a load is suspending in the air, the operator is not allowed to leave the cab.
m) When actual load reaches 90% of the rated one, the load moment limiter will
sound an alarm, to which high attention should be given.
2) Load’s binding or hanging is not good or load may fall due to imbalance;
0063640-200-03.CY
3) No protective mat is added between the edges of load and wire rope;
4) In case of poor visibility and /or darkness, it is difficult to identify load or conduct
signal;
r) Leave an ample space for stopping crane; otherwise persons nearby may be hurt
by crane counterweight due to narrow distance between counterweight and
surrounding building.
s) Keep the windows of crane operator’s cab clean to ensure good visibility; stop
crane operation immediately in case of poor visibility; replace the broken window
as soon as possible.
t) Persons may only access and leave the crane following permission from the
crane operator and only when the crane is at a complete standstill!
u) Keep crane clean and dry, since slippery walkway, ladder, tools or loose parts
0063640-200-03.CY
v) Do not lift the load which adheres to other objects forcibly. Otherwise, crane may
topple over, boom frame may buckle or objects may be damaged. Therefore, the
operator must ensure that the load is not in contact with other objects before
lifting.
w) Drive crane with great cautiousness, in working site or not. Observe the
conditions surrounding crane such as overhead power line, low-lying land, narrow
clearance, restriction to bridge and road, uneven ground and gradient of road. If
necessary, appoint a signalman to assist operator to move crane. Lock slewing
mechanism during traveling.
x) It is more dangerous that two cranes carry out lifting operations together.
Therefore, a careful calculation must be made before commencing the work, and
following import requirements for this type of operation must be observed.
1) The load is not casually attached to the crane. It must be calculated carefully
so that the actual lifting capacity of crane can not exceed the rated lifting
capacity.
2) Ensure that each lifting tackle can bear specified load weight which is
calculated during design.
3) The crane operator, signalman and other worker must evaluate the operational
planning together before operation.
4) Ensure that crane can move properly in the whole process of operation.
y) When you leave the machine in an emergency, you are putting your lift at risk.
Therefore, you must take following measures prior to leaving the machine.
1) Detach the load from the hook and set it down on the ground; if necessary,
lower the boom frame;
z) Do not wear loose clothing, scarves, open jackets or open shirt sleeves, and do
not wear jewellery (rings, bracelets, earrings or similar). Otherwise, there is
serious danger of injury from being pulled into moving machine parts.
0063640-200-03.CY
aa) Do not stop crane near the bank which is possible to collapse or on low-lying
land that may be washed down by water.
bb) Take away the key when machine remains idle. In this way, the unauthorized
person can not start the machine without permission.
Crane operator should perform the following checks before operating the crane:
a) Check the daily record of work to ensure that all regular inspections maintenance and
repair works are performed.
b) Check the hoisting limiter, boom angle indicator, tilting-back support and other safety
equipment for functional work.
c) Check if the load-bearing parts such as wire rope (hoisting rope, derricking rope and
sling etc.), boom, outriggers, hook and load handling devices are kept in good
working order.
d) Check if there are some bolts, nuts and pins lost, and the components are cracked or
damaged.
e) Ensure that no modification has been made to the crane without permission, e.g.,
increase or decrease in counterweight plate and improper repair of boom frame.
f) After starting up the engine, check if the values shown on instruments are normal.
i) Check brakes and clutch. Test the braking performance by lifting a load away from the
ground and suspend it in the air for a moment.
l) Crane operation can be carried out within minimum working radius. No obstacles
hinder the necessary movements. The ground at the operating site is able to support
expected loads.
m) Ensure that no obstacles are within working radius and operator can see the load
clearing from the cab. Check if the communication between operator and signalman
is kept smooth so as to ensure safe crane operation.
b) Use load handling devices (wire rope or chain) correctly. Make the vertical line of
hook pass through center of gravity of load.
c) If any part of crawler crane or load handling devices come in contact with high-voltage
line, or emergent situation occurs, the operator should stop the vehicle at once.
d) The load capacities as given in the load lifting capacity tables must be adhered to.
The loads given in the load lifting capacity tables must not be exceeded. Driving(or
slewing) too fast with a load, or setting up and loading on an uneven surface, and
swinging of suspended load should be avoided.
e) Diagonal pulling of the load to be lifted which is still in contact with the ground is
prohibited.
f) It should be avoided that the load or auxiliary lifting device collides with structural
members of crawler crane.
--always set down the load and boom frame on the ground.
--switch off the crane engine and cut off the power of load moment limiter and limit
switch
0063640-200-03.CY
--always set down the load and boom frame on the ground.
--switch off the crane engine and cut off the power of load moment limiter and limit
switch
j) If any part of crawler crane or load handling device is in contact with high-voltage lines,
the best way to guarantee the personal safety of operator is to stay in operator’s cab
until the danger is obviated. If operator must leave the crane, he’d better jump rather
than climb down the cab.
k) The operator’s cab should be equipped with an emergency hammer which can be
used to smash the window in an emergency so that operator can run away from the
cab.
l) The load moment limiter, once be triggered, should be kept in that state until the crane
is not overloaded.
m) If the load moment limiter is not set to the actual configuration status of the crane, it
can not fulfill its function as a safety device.
n) Examine if the angle indicators and the strain gauges are in function.
o) The crane may topple over backwards if a load is suddenly freed since the tension
created in the boom can cause it to jerk back violently.
p) Make sure that the loads and working radius contained in the lifting capacity tables
are not exceeded.
q) When working in the vicinity of power cables, a sufficient safety clearance must be
maintained, if the cables are not isolated by electricity engineers or the hazardous
0063640-200-03.CY
r) For all crane movements, the crane operator must always keep the load, as well as
the crane hook or loading equipment when the crane is not loaded, in his field of
vision. If this is not possible, the crane operator may only operate the crane according
to instructions given to him by a signalman. These instructions may be given in the
form of hand signals or over a two-way radio. Whatever method is used, precautions
must be taken to eliminate the risk of misunderstanding.
s) All employees shall be kept clear of loads about to be lifted and of suspended loads
Note:
If, despite all precautions having been taken, a flashover occurs, carry out the following
procedure:
1. Keep calm!
3. Warn those around the crane not to move and not touch the crane.
Not adhering to the above points may lead to risk of accidents or damage!
a) When crawler crane and auxiliary lifting device are in non-working condition, never
park the vehicle near the embankment liable to collapse or low-lying land subject to
be washed by water.
b) Set down the load on the ground, and if necessary low the boom frame to some
extend; lock the slewing gear and traveling gear and apply the brake.
e) Clean such components as movable parts and exposed part of the piston rod of
cylinder.
f) Check if bolts and nuts are fitted tightly. Any defects found should be eliminated at
once. It is prohibited to operate the crane with fault.
Caution:
To avoid engine from freezing in winter, drain all cooling water when park the vehicle, if no
anti-freeze is added into the cooling water.
Caution:
These electromagnetic fields can pose direct or indirect danger to persons or objects, for
example:
1. Effect on human organs due to temperature increase.
2. Danger of burns or inflammation due to temperature increase.
3. Spark or electric arc formation.
In any case, before working with the crane near transmitters, contact Zoomlion representative.
In addition, consult a high frequency specialist.
l) Every crane must be “totally” grounded. Check visually or with a simpler tester to ensure
that ladder, cab and cable pulleys are grounded.
m) All personnel working on the crane or with large metal objects must protect themselves
from burns by wearing non-conductive gloves and suitable clothing while working.
n) If one feels an increase in temperature, there is no need to panic. Always work under
the assumption that the respective workpiece, structural steel member or support is
“hot”.
o) The temperature of objects affected by high frequency radiation depends on their ‘size”.
Cranes, carriers and coverings, for example, are “hooter”.
p) Contact with other crane loads is not permitted when operating the crane (arcing). Since
defects caused by burns considerable reduce rope carrying capacity, any such
occurrences must be reported immediately to the machinery supervisor so that the
ropes can be inspected.
q) An insulator is required at all times between the crane load hook and tackle. It is strictly
prohibited to remove this insulator.
r) The ropes may not be touched above the insulator. This is strictly prohibited!
s) Crane with attached loads may not be touched by any unprotected parts of the body
after the load has been lifted or set down.
t) Do not work with a bare upper torso or in short pants, this is prohibited.
u) To minimize absorption of high frequency radiation, large loads should be transported
horizontally if possible.
v) Loads must be grounded, or additional insulation used (rubber material between the
object and gloves) when manual work is required.
w) To avoid accidents, use a safety belt when working on components that are high off the
ground.
0063640-200-03.CY
x) Handling explosive matter (such as refueling) may only be carried out at least 6 m away
from the place where sparks could form due to handling of larger metal parts. Use only
conductive rubber hoses to refuel.
y) Any accidents and unexpected events must immediately be reported to the local
construction supervisor and the safety engineer.
2) Warning: Dragging/entanglement
4) Warning: Crushing/collisions
0063640-200-03.CY
7) Danger: snagging/dragging
15
9
12
2 9 6 9 6 2
15
13
2 9 6 9 6 2
9 13
3 4 11 16 11 4
8
6
12
14
12
Caution:
1. When the safety sign is damaged or illegible, please order it from appointed service
supplier.
2. It is forbidden to cover or take off safety signs casually.
3. If the safety sign is covered with dust, clean it in time.
4. The operator’s cab should be equipped with an emergency hammer which can be used
to smash the window in an emergency so that operator can run away from the cab.
0063640-200-03.CY
Caution:
1. We recommend using the hand signals illustrated above. However, users can decide
on their own hand signals depending on actual condition, as different countries and
regions may differ in the expression of hand signals.
2. Hand signals must first be discussed and mutually agreed upon and clearly executed.
Misunderstand of hand signals may lead to serious accidents.
3. In any case, national traffic regulations must always be observed when abroad.
Chapter 4 Crane operation
0066340-200-04Y.C
1 15
0
2 14
0
3 13
4 12
11
5
6 10
8 9
19 20
18 17
16
21 23
25 22 24 26
(1) The crane movements can be carried out only when deadman’s button is pressed.
(2) The crane movements can still be carried out before the control lever is returned to
neutral position with deadman’s button released. However, to perform the next
crane movement after returning the control lever to neutral position, the operator
must press deadman’s button first and then move the control lever. Otherwise, the
operation of control lever is invalid.
(3) In normal condition, stop the crane movements by returning the control lever to
neutral position.
(4) Make sure that the emergency stop button is triggered when needing to connect
the power or start up the engine again.
0066340-200-04Y.C
30
29
28 27
31 33 35
37 38
32 34 36
(1) The crane movements can be carried out only when deadman’s button is pressed.
(2) The crane movements can still be carried out before the control lever is returned to
neutral position with deadman’s button released. However, to perform the next
crane movement after returning the control lever to neutral position, the operator
must press deadman’s button first and then move the control lever. Otherwise, the
operation of control lever is invalid.
(3) In normal condition, stop the crane movements by returning the control lever to
neutral position.
0066340-200-04Y.C
39 40 41 42
43 45
44 46
47 48 49 50
“Working floodlight”
40 Control all the working floodlights on the crane
switch
“Cold-start on/off”
41 Control the cold-start of the engine
switch
Names of the
No. The key Remarks
rocker switches
“Front windshield
43 Control the front windshield wiper
wiper” switch
“Automatic
Lubricate the superstructure lubricating points
45 lubrication system”
automatically.
switch
“Front windshield
46 Control the front windshield washer
washer” switch
(1) Put the master lighting switch on the 2nd position before switching on the
(2) After putting the master lighting switch on the 2nd position, the LED on the
rocker switches of control panel is still on.
(3) Press the “engine shutdown” switch and hold it for more than 30 seconds, the
working hours of the engine can be saved. In normal situation, using the ignition
key switch to stop the engine is prohibited.
0066340-200-04Y.C
51 52 53
55
54
56
58
57
59
61
60
62
63 64
“Hoisting bypass”
54 For details, please refer to section 4.4.
switch
“Lowering bypass”
55 For details, please refer to section 4.4.
switch
“Derricking bypass”
56 For details, please refer to section 4.4.
switch
“A-frame
Turn the switch to left, A-frame will be erected;
57 erecting/lowering”
Turn the switch to right, A-frame will be lowered.
switch
“Tilt cab forwards Turn the switch to left, the cab will tilt forwards;
58
/backwards” switch Turn the switch to right, the cab will tilt backwards.
When the switch is turned to “W1” position, move right control
lever to left and right to control the luffing jib derricking winch
(W1). This is only available for W1 winch. (For details, see
“W1 winch/Assembly” section 4.5.2.2.3.3.)
59
switch When the switch is turned to “Assembly” position, push right
control lever forwards and backwards to control the mounting
cylinder on A-frame. This is only used during assembly and
dismantling operation. (For details, see section 4.5.9.)
“Reeving winch” Turn the switch to left, the reeving winch will be spooled up;
61
switch Turn the switch to right, the reeving winch will be reeled off.
0066340-200-04Y.C
Names of the
No. Remarks
components
start.
1. When the switch is placed in “off” position, the power
supply of the crane is turned off.
2. When the switch is placed in “power” position, the power
supply of the crane is turned on, including the control
system, auxiliary control system and engine electrical
control system.
3. When the switch is placed in “start” position, the starting
motor of the engine is turned on, thus starting the engine.
Releasing the switch after the crane starts up, the switch
will return to “power” position automatically.
1. In “manual accelerator mode”, the adjuster is used to
control the engine speed. Turn it clockwise to the required
“Manual ACCEL
64 speed.
adjuster” switch
2. In “auto accelerator mode”, the current value is the
maximum adjustable speed of engine.
(1) In cold weather, the engine will be preheated automatically after startup. Therefore,
the delay of engine startup in cold weather is a normal phenomenon.
(2) “Assembly” position of “W1 winch / Assembly” selective switch is only used for
assembling and dismantling.
(3) Only when the crane is fitted with luffing jib derricking winch (W1), can the
operator can turn the “W1 winch / Assembly” selective switch to “W1 winch”
position. Otherwise, there is a risk of danger!
It’s dangerous to use “hoisting bypass” and “lowering bypass” switches, which can’t
be used in normal situation. Under special circumstances, and the user knows the
possible consequences, then he can operate it very carefully.
0066340-200-04Y.C
65
66
It can display the working state of crawler crane in real time. When abnormal conditions occur,
the warning light will flash or a prompt will appear on the screen. The display can show the
working mode, engine speed, wind speed, voltage, water temperature, oil level, load and
pressure of pumps etc.
0066340-200-04Y.C
a) Engine information
b) Alarm functions
Note: In view of legibility, Figures of display of control system given here are amplified.
However, when crane is working, the screen shown on the display is not as
large as the figure.
0066340-200-04Y.C
67
68 69 70 71
Note:
72 73 74 75 76
77 78 79 80 81
The limit ranges of the working state of crane are monitored. The following icons will flash
when the limits are reached.
75 Icon “Air filter clog” When air filter is clogged, the icon will
flash.
Icon “Oil inlet /return pipe When oil inlet pipe or oil return pipe is clogged,
76
clog” the icon will flash.
When load hook 1 comes into contact with the
Icon “Upper limit switch on hoisting limit switch weight during its upward
77
H1”
movement, the icon will flash.
Icon “Lower limit switch on When there are only three windings of wire rope
78
H1” left on H1, the icon will flash.
When load hook 2 comes into contact with the
Icon “Upper limit switch on hoisting limit switch weight during its upward
79
H2”
movement, the icon will flash.
Icon “Lower limit switch on When there are only three windings of wire rope
80
H2” left on H2, the icon will flash.
Icon “main boom, When main boom angle reaches 85o, the icon
81
85°” will flash.
0066340-200-04Y.C
83
82
84
85 86 87
88 89 90
0066340-200-04Y.C
No. Description
93 94 95 96 97 98 99 100
Page down
99
Confirm the previous operation or save the modified
100 Key “Enter”
parameters.
Caution:
b) Adjustment of armrest
There are two levers to adjust the height of the seat. The front lever adjusts the height of
the front of the seat, and the rear lever adjusts the height of the rear of the seat.
e) Adjustment of backrest
Danger:
Never check the coolant level before the engine is cooled down. Otherwise, you
may get scalded.
Before starting up the crane, the operator must ensure that the following conditions are
fulfilled:
4) All cowlings and covers on the sides must be closed and locked;
6) No ice or snow is on the wire rope, winding drum and limit switches;
Danger:
Before carrying out any boom movements, make sure that there are no loose parts
on the boom such as pin, retaining spring or ice. Otherwise, the falling parts may hit
the persons or other objects.
0066340-200-04Y.C
Insert ignition key into ignition lock and turn it clockwise to the 1st position, then the power
supply is turned on.
After the power supply is turned on, press the controller power supply switch on the
right control panel, the LCD screen of load moment limiter and LCD screen of control
system are started.
1)
4) Inclinometer;
5) Anemometer;
6) Voltage;
0066340-200-04Y.C
(1) Correctly set current work mode on load moment limiter, otherwise, operation
is not permitted to be carried out.
(2) Low engine oil pressure will impair the working efficiency of engine.
(3) Add diesel oil in time if the oil level is too low.
(4) If air filter is clogged, the icon “air filter clog” will flash. At this moment,
clean or change air filter.
(5) The inclination range for the superstructure: the inclination should be less
than 1% in both lateral direction and longitudinal direction. If this range is
exceeded, the crane operator must adjust the crane to horizontal position
firstly.
(6) The maximum in-service wind speed should not exceed 9.8m/s.
(7) The maximum out-of-service wind speed should not exceed 21m/s when the
crane is only fitted with main boom;
The maximum out-of-service wind speed should not exceed 15m/s when the
crane is fitted with main boom and fixed jib.
If wind speed reaches or exceeds these values, the entire boom should be
lowered down.
(8) The battery master switch must be switched on to electrify the machine.
(9) To protect the battery, switch off the battery master switch if the crane will not
work for a long time.
1) Illumination
Press the “interior light” switch, the interior light in the cab will light up.
Turn the master lighting switch to the 1st position or the 2nd position, the LED
on the switches of the control panel will light up;
2)
Turn on front windshield wiper and roof windshield wiper by pressing the front
When front windshield needs to be washed, please press the “front windshield
washer” switch
3) Fan
There is a fan fitted on the rear right side of the operator’s cab. Turn on the switch on
it, the fan will run.
4) Horn
Check if the horn is working properly with foot-operated switch before work.
(1) Before switching on the working floodlight switch , put the master lighting
(2) Warning light on boom head is a kind of solar light. The warning light is
charged during the day and will flash at night.
(3) The horn must be actuated before starting the engine to warn the person in the
vicinity of the crane.
(4) The horn can only be actuated before starting the engine and in emergencies.
Insert the ignition key into the ignition lock and turn it clockwise to the 2nd position, then the
engine is started.
(1) When ambient temperature is higher than or equal to﹣10℃, the engine will be
preheated automatically before startup. Therefore, the delay of engine startup in
cold climate is a normal phenomenon.
(2) When the engine is being preheated, the icon will flash. After the engine is
preheated, it will go out.
(3) When ambient temperature is lower than﹣10℃, the operator must actuate engine
cold-start device first and then start the engine. When engine cold-start device is
actuated, put the controller power (if there is) in (stop) position, the ignition key
switch in (power) position, the cold-start rocker switch in the 2nd position.
After running the cold-start device for about ten minutes, start the engine.
What’s more, if the water temperature of the engine in cold climate is too low, start
the cold-start device to improve the water temperature, ensuring that the water
temperature of the engine is in normal range.
(4) The engine can not work with full load until the running temperature is reached.
The crane operator must check all safety devices for functional work before every crane
operation.
– the electrical control system is switched off and the diesel engine shuts down;
– All crane movements stop immediately.
The emergency shut-down button must only be used in case of emergency and not as
a normal procedure for shutting down the diesel engine!
If an emergency stop is triggered while a load is being lifted, there may be a risk of
accident owing to swinging of load.
0066340-200-04Y.C
The battery master switch is put in the rear right side of the slewing table, near the battery,
which is described above. When the crane doesn’t work at night or for a long time, the battery
master switch should be put in “OFF” position to prevent the battery from discharging.
The load moment limiter switches off all crane movements that increase the load moment if
the permissible load moment is exceeded. Only crane movements that reduce load moment
can be carried out. Although the crane is equipped with load moment limiter, the operator
can’t escape the responsibility of unsafe operation. Before lifting a load, he must know the
approximate weight of the load and decide if the crane is in a position to carry out this job with
the help of load capacity chart.
Before operating the crane, the load moment limiter must be adjusted to the current
setup condition according to the lifting capacity chart. Only this way can it be able to
fulfill its protective task. If the crane operator does not observe this safety regulation,
there is a great danger of toppling or destroying the crane, despite the load moment
limiter is working normally. The load moment limiter can not monitor and control all
possible operating conditions; this is still primarily the responsibility of the operator.
If the moment percentage is between 100%-110%, it means that the crane overloads by
100%-110%, the crane movements “spool up hoisting winch 1 or 2” , “spool up derricking
winch” and “reel off derricking winch” are limited. The tricolor light sends out yellow
early-warning and red warning continuously. The buzzer sounds continuously. The icon
will be shown on the display.
0066340-200-04Y.C
The following operation can bypass the limited crane movements temporarily.
1. When the control lever is in neutral position, if press “Setup” switch and then
release it, the cut-off movements “spool up hoisting winch 1 or 2” and “reel off
derricking winch” will be bypassed. The movements will be slower, the tricolor
light will send out yellow warning continuously, and the buzzer will sound,
2. When the control lever is in neutral position, if press “Setup” switch and then
release it, and turn the “derricking bypass” switch to the right as shown in the
above figure, the cut-off movements “spool up hoisting winch 1 or 2”, “spool up
derricking winch” and “reel off derricking winch” will be bypassed. The
movements will be slower, the tricolor light will send out yellow and red warning
continuously, and the buzzer sounds, meanwhile the icon is shown on the
display.
If the moment percentage is more than 110%, it means that the crane overloads by 110%, the
crane movements “spool up hoisting winch 1 or 2” , “spool up derricking winch” and “reel off
derricking winch” are limited. The tricolor light sends out yellow early-warning and red warning
continuously. The buzzer sounds continuously. The icon will be shown on the display.
If the load moment limiter enters the unspecified rated load work range, the crane movements
“spool up hoisting winch 1 and 2” and “reel off derricking winch” are limited. The tricolor light
will send out yellow early warning and red warning continuously. The buzzer will sound.
0066340-200-04Y.C
The following operation can bypass the limited crane movements temporarily.
When the control lever is in neutral position, if press “Setup” switch and then release it,
the cut-off movements “spool up hoisting winch 1 or 2” and “reel off derricking winch”
will be bypassed. The movement will be carried out at normal speed, the tricolor light
will send out yellow warning, and the buzzer will sound, meanwhile the icons and
(1) “Bypass” means when overload appears and the movement is restricted, the
operator get the permission to operate in the direction of danger temporarily
through switch, but it doesn’t mean that it excludes overload.
(2) Only when the control lever is in neutral position, can the “Setup” switch be
operated, otherwise, it will be invalid.
(3) Pressing “Setup” switch for the first time works, press it again, the control lever
returns to neutral position for more than 10 seconds or the engine stops, the lever
will be invalid.
(1) When the control lever is in neutral position and the engine is still on, turning
“safety bypass” switch right can bypass the overload safety device. Only operate
when professional supervisor is present and with special care.
(2) If bypassing the overload safety device, there will be no protective device to
prevent overloading, which will increase the chance of accident!
(3) “Safety bypass” works if turn it for the first time. Turn it again, the engine stops or
the working time is more than 30 minutes, it will be invalid.
(4) The movement will be slower after the “safety bypass” releases the safety
restriction.
(5) The icon shows on the display when the “safety bypass” switch works.
(6) The “safety bypass” switch is placed in electrical control box for slewing table.
(7) The “safety bypass” switch can only be used by professionals and can’t be used
as device for normal operation.
0066340-200-04Y.C
It’s very dangerous to use “safety bypass” switch, which is not allowed to use in
normal circumstances. Only in special condition and the operator knows the possible
consequences, the operation is allowed and with special care.
Boom angle indicator is fitted on the lower rear end of main boom pivot section (i.e. on the
right side of the crane operator’s cab). In this way, the operator, even in crane operator’s cab,
can clearly read boom angle shown on the indicator.
It is used to detect main boom angle and in real time according to the data collected by angle
sensors. Once detected angle exceeds safe angle range, an alarm will be sent out and
dangerous movements will be switched off so as to ensure safe crane operation.
When the main boom angle is 80°, the derricking speed will be slower and the buzzer
will give an alarm.
When the main boom angle is 83°, the crane movement “raise main boom” will be cut
off automatically and the buzzer will give an alarm.
The requirements for main boom angle under this boom configuration are the same as
that under “Main boom” configuration. The fixed jib can be fitted in the angle of either 10°
or 30° to main boom.
0066340-200-04Y.C
1) When the main boom is raised to 80° position, the main boom derricking speed will
be slower.
2) When the main boom is raised to 85° position, the system will cut off hoisting
movements automatically and gives an alarm.
3) When the main boom is lowered to 65° position, the system will cut off lowering
movements and gives an alarm. After switching to “assembly mode” or press “Setup”
switch, the main boom will be lowered down.
4) When the angle between the main boom and luffing boom is less than 85°, main
boom derrick winch will be spooled up, and luffing jib lowering will be stopped
automatically in “assembly mode” and “working mode”.
5) When the upper angle between main boom and luffing jib is more than 10° and less
than 15°, the luffing jib will move slowly.
6) When the upper angle between main boom and luffing jib is 10°, the system will cut
off luffing jib raising movements and give an alarm.
7) When the luffing jib angle is less than 15°, the luffing jib lowering movements will be
stopped automatically. After switching to “assembly mode” or press “Setup” switch,
the luffing jib can still be lowered down.
Under this boom configuration with S-boom angle of 85°: when W-luffing jib angle
exceeds 60°, the luffing jib with a load should not be raised/lowered at high speed.
And the load should be the min. lifting capacity under this boom configuration;
otherwise the luffing jib is liable to overturning. Before the load is detached from
the load hook, lower the luffing jib to a position(less than 60°). In other words,
lower the luffing fly jib to 60° by the pulling force of load.
0066340-200-04Y.C
Lowering limiter
In order to prevent wire rope from being wound in the opposite direction after it is unwound
completely, the lowering limit switches fitted on winch 1 and 2 are triggered when there are
only 3 windings of wire rope left on the drums. Under this condition, the buzzer on the control
panel will sound, the tricolor light will send out yellow early warning and red warning
continuously, and the icons or on the main screen of display will flash. The
icon will be shown on the display. At this time, the movement of “reel off winch” is
switched off, and only the movement of ‘spool up winch” can be carried out.
The following operation can bypass the limited crane movements temporarily.
Turn the “lowering bypass” switch to the right as described above, the cut-off movement “reel
of hoisting winch 1 or 2” will be bypassed, the tricolor light will send out yellow early warning,
the buzzer will sound continuously, and the icon is shown on the display at the same
time.
0066340-200-04Y.C
(1) “Bypass” means when lowering appears and the movement is restricted, the
operator get the permission to operate in the direction of danger temporarily
through switch, but it doesn’t mean that it excludes lowering.
(2) The bypass of lowering limiter must be guided by a professional. He must contact
with the crane operator directly and monitor the residual length of the wire rope all
the time. Great care is needed to operate the crane.
If the lowering limiter is bypassed, there will have no protective device to prevent wire
over-lowering, which will increase the chance of accident!
Hoisting limiter
If the load hook comes into contact with the hoisting limit switch weight during its upward
movement, the hoisting limit switch is triggered, the buzzer on the control panel sounds, and
the crane movement “Spool up hoisting winch 1 and 2” “reel off derricking winch” are switched
off. The tricolor light sends out yellow early warning and red warning continuously. The icon
or on the display starts to flash. The icon will be shown on the display.
The following operation can bypass the limited crane movements temporarily.
0066340-200-04Y.C
Turn the “hoisting bypass” switch right, as described above, which will bypass the
cut-off movement “spool up hoisting winch H1 or H2”. The tricolor light sends out
yellow warning, and the buzzer sounds, meanwhile showing the icon .
1) “Bypass” means when hoisting appears and the movement is restricted, the
operator get the permission to operate in the direction of danger temporarily
through switch, but it doesn’t mean that it excludes hoisting.
If the hoisting limiter is bypassed, there will be no protective device to prevent wire
hoisting, which will increase the chance of accident!
When the high pressure oil pipe, which is connected to support cylinder, is damaged, the
bidirectional hydraulic lock fitted in oil circuit can prevent pressure oil in the two chambers of
support cylinder from flowing outside so as to avoid cylinder retracting or extending, and thus
guaranteeing the safety of assembly and dismantling of the crawler crane.
The overflow valve in hydraulic system can restrain the pressure in the circuit from rising
irregularly, thus protecting such hydraulic elements as hydraulic oil pump and hydraulic motor
against damage and preventing the hydraulic system from being overloaded.
0066340-200-04Y.C
4.4.10 Anemometer
The anemometer fitted on the boom or jib head can detect the wind speed in real time.
When the in-service wind speed exceeds 9.8m/s, the crane operation should be stopped
immediately.
When the out-of-service wind speed for “Main boom” configuration exceeds 21m/s, the entire
boom should be placed on the ground.
When the out-of-service wind speed for “Main boom with fixed jib” configuration exceeds
15m/s, the entire boom should be placed on the ground.
The operator should constantly observe the wind speed displayed on the screen.
0066340-200-04Y.C
a)
1)
3)
5) All safety devices are set in accordance with the load capacity charts;
1) Always operate the control lever slowly and carefully. This can not only
ensure longer service life of crane, but also help to avoid accidents.
2) During all crane movements, make sure there are neither obstacles nor
persons in the danger zone.
If the crane has been worked for a long time, switch on “Oil cooling fan” switch to
cool down hydraulic oil automatically.
(1) If one of the above icons flashes during crane operation, stop the operation
immediately and shut down the engine at once. Check the corresponding
device and eliminate the fault.
(2) If the icon “Engine oil pressure” does not go out after engine starts or
during crane operation, the engine should be shut down at once. If this
operation is not done, the engine will be damaged caused by insufficient oil
pressure.
(3) In order to see the positions of press-keys on the right control panel and the
position of boom clearly when the crane works at night, the crane operator
must turn on the LED on the keys of control panel, the working light on the
slewing table by placing master lighting switch to the 2nd position, and
(4) During operation, always check the indicators on the display of load moment
limiter. When carrying out crane movement, the operator must see the
changing load condition and changing forces. The overloading condition
should be recognized early, and the crane movement should be slowed down
accordingly.
0066340-200-04Y.C
When operating single movement by control lever, the valid area in front and rear
direction of the control lever is -20°- 20°, the valid area in left and right direction is
-20°- 20°,which is described as above in the grid.
Front
Left Right
Back
When do a compound movement using a single control lever, the valid area for control
lever movement is 20°- 70°,which is described in the above grid. The valid movement
range for A,B,C,D areas is 50°.
0066340-200-04Y.C
d) Setting configuration
For the specific methods to set configuration, please refer to load moment limiter
instructions.
Set the corresponding configuration in the load moment limiter according to actual
situation. Since the configuration will affect the control system on winch. The
configuration must be set properly to avoid danger and accident.
Speed switch can be divided into four shifts: slow, normal, middle and high. For details,
please refer to section 4.5.1~4.5.4.
The switch
Speed set Function
setting speed
when need to load in fixed position and position exactly,
press the key, the system will design proper speed to
Rocker
work no matter how big the opening of the control lever,
Slow speed loading in fixed position and positioning exactly. The
work range: hoisting winch 1, hoisting winch 2 and
switch
luffing jib derricking winch and main boom derricking
winch.
Rotating switch The middle position of the switch means the automatic
Normal speed
working speed of the system
When the hoisting winch needs a speed higher than
Middle speed
“slow speed” shift, use middle speed.
The hoisting movement, luffing jib derricking movement
High speed and traveling movement will be performed in high
speed.
Left control lever
High speed Slew in high speed
“high speed”
switch
Right control
lever “high High speed Raise the hoisting winch and travel in high speed
speed” switch
1) The automatic working speed for slewing mechinism is low speed. After pressing
left control lever “high speed” switch, the slewing mechinism will work in full
speed.
2) The high-speed switch is only used when the crane is working without load or with
light load and the hoisting winch is operated alone.
0066340-200-04Y.C
The traveling mechanism comprises drive sprocket, driven sprocket, track-carrier roller, track
roller and track pad, crawler carrier as well as traveling reducer. Both right crawler carrier and
left crawler carrier are fitted with an independent traveling reducer. The hydraulic oil in
traveling motor is supplied by superstructure main pump through main valve and centre
revolving joint.
Traveling mechanism
The traveling movements are controlled by left and right control levers. The movements “left
crawler forwards” and “left crawler backwards” are controlled by left control lever, and the
movements “right crawler forwards” and “right crawler backwards” are controlled by right
control lever. In this way, crane can carry out such movements as traveling straight
ahead/backwards, steering during traveling and turning on spot.
Note:
Before carrying out the traveling movement, the operator must first press the
1) Before carrying out traveling movement, the operator must first press
2) When operate the control lever, first press the deadman’s button, then
press the control lever. Otherwise, the operation is invalid.
3) The crane movements can still be carried out before the control lever is
returned to neutral position with deadman’s button released. However, to
perform the next crane movement after returning the control lever to
neutral position, the operator must press deadman’s button first and then
move the control lever. Otherwise, the operation of control lever is invalid.
4) In normal operation, stop the crane movements by returning the control
lever to neutral position.
Traveling straight ahead: Push both control levers forwards at the same time
Traveling straight backwards: Push both control levers backwards at the same time
Note:
When crane is traveling with a crawler, the operator had better change into
low-speed shift.
0066340-200-04Y.C
Differential steering:
Steering to right: Push left control lever heavily and push right control lever slightly to
make the speed of left crawler higher than that of right crawler
Steering to left: Push right control lever heavily and push left control lever slightly to
make the speed of right crawler higher than that of left crawler
Differential steering
Turning to right: push right control lever backwards heavily, then right crawler will turn to
left; push left control lever forwards heavily, then left crawler will turn to right.
Turning to left: Push left control lever backwards heavily, then left crawler will turn to
right; push right control lever forwards heavily, then right crawler will turn to left.
Note:
1. The high speed is prohibited when the crane is turning.
2. When there is a need to stop traveling or steering, turn the control lever to
neutral (zero) position, the traveling brake will be activated automatically.
3. When crane is traveling with a load, it can only travel forwards with boom
located straight ahead.
4. When crawler crane is traveling for a long distance, ensure that the traveling
motor is behind the slewing table.
b) Traveling on slope
Make crawler crane travel forwards, and place the slewing control lever in neutral (zero)
position. When crawler crane is traveling uphill, the engine speed must be within medium
speed range and the boom length must be reduced as possible as you can. When
crawler crane is traveling on a slope with maximum permissible gradient, it can only be
fitted with basic boom.
If crawler crane needs to turn on the slope when it is traveling downhill, some treatments
should be taken to the undulations to form a gentle slope curve (see following diagram),
which can prevent crane’s center of gravity from deviating and load from concentrating
on a section of crawler when crawler crane is traveling over
Gentle slope
Note:
1. When crawler crane is traveling from the horizontal ground to the slope, if its
center of gravity deviates forwards, the crane should be stopped to adjust the
center of gravity.
The crane can travel with suspended load, providing that the following precautions are
taken:
c) The crane can travel with a load of 70% of the rated load. In this case, the
ground should be firm and its gradient should not exceed 5/1000. The
boom frame must be located in the driving direction;
c) Fast travelling
High-speed
右手柄高速开关 switch
Right
右手柄
control lever
Turn the Speed Set switch “High Speed” position or press the high-speed switch
of right control lever, which is described as above. Then operate left and right
control levers to move crane at higher speed.
1) Before carrying out traveling movement, the operator must first press
2) Only when deadman’s button is pressed, can the operation of control lever is
valid.
3) The crane movements can still be carried out before the control lever is
returned to neutral position with deadman’s button released. However, to
perform the next crane movement after returning the control lever to neutral
position, the operator must press deadman’s button first and then move the
control lever. Otherwise, the operation of control lever is invalid.
4) In normal operation, stop the crane movements by returning the control lever
to neutral position.
5) The high-speed switch is only used when the crane is traveling straight
without a load.
Note:
Hoisting mechanism consists of hydraulic motor, winch reducer, brake, lowering limiter,
hoisting limiter and wire rope as well as load hook 1 and 2. The speed of hoisting
movement can be changed by adjusting the inclination angle of control lever. The angle
can vary from - 5 to -25 or from 5 to 25. The bigger the inclination angle is, the quicker
the hoisting speed is.
The crane is fitted with two hoisting winches: hoisting winch 1 and hoisting winch 2. Even
though the structure of hoisting winch 1 is the same as that of hoisting winch 2, their
positions and functions are different.
Hoisting winch 1 is required for crane operation with main boom, and hoisting winch 2 is
required for crane operation with main boom and fixed jib, crane operation with main
boom with luffing jib, or crane operation with tip boom.
The control lever for hoisting winch 1 is fitted at the right side of operator’s seat, and the
control lever for hoisting winch 2 is at the left side of operator’s seat.
0066340-200-04Y.C
Note:
1. Before operating the winch, the operator must first choose correct boom
configuration by turning boom configuration switch to required position. As to the
functions of winch 1 and 2, they are determined by selected boom configuration.
2. When spooling up or reeling off hoisting rope, keep watching the winch to make
sure that there is slack wire rope on the winch.
0066340-200-04Y.C
High-speed switch
Right control
lever
Turn “SpeedSet” switch to “Medium-speed” position, then operate right control lever or
left control lever to lift and lower load hook at middle speed.
(2) When the load swings due to winding wire rope, the load should be put down
and be loaded again after complete unlocking of wire rope.
(3) Under any conditions, there must be at least three windings of wire rope left on
the winding drum.
(4) When a load is lifted away from the ground, it should first be suspended in the
air for a moment. Do not lift the load until the operator confirms that there is no
safety hazard. Do not derrick and telescope the boom if the load is still in
contact with the ground.
(5) Do not change the control lever between “lift hook” and “lower hook” jerkily.
The operator must return the control lever to neutral position and ensure that
the winding drum has stopped before changing control lever from “lift hook”
to “lower hook”. Otherwise, the winch components will be damaged.
0066340-200-04Y.C
(6) If main boom is extended under “Main boom” configuration, the lifting height
of crane will increase accordingly, which will therefore make the wire rope not
long enough. Such problem can be solved by changing the rope reeving of
wire rope. Before changing the rope reeving, fit a hoisting limit switch weight.
(7) After the system sounds the alarm, only movements towards safe directions
are permitted. If some movements towards dangerous directions are required,
please refer to instructions in section 4.4.
(8) The high-speed switch is only used when the crane is working without load or
with light load and the hoisting winch is operated alone.
0066340-200-04Y.C
Through changing the length of wire rope reeved between derricking pulley blocks (including
derricking crown block and derricking traveling block), the derricking mechanism, via
derricking winch, can adjust boom angle so as to change the working radius. In different boom
configurations, different winches are selected.
Crane operation with main boom and crane operation with main boom and fixed jib
Main boom angle can be adjusted by changing the length of wire rope reeved between
derricking pulley blocks, which consist of derricking crown block at the tail end of slewing table
and derricking traveling block on the top of A-frame.
Anchoring rods
Boom
Tilting-back support cylinders of main boom
A-frame
Wire rope
Derricking mechanism
0066340-200-04Y.C
Luffing jib angle can be adjusted by changing the length of wire rope reeved between luffing
pulley blocks, which are comprised of pulley blocks respectively located on the top of
WA-frames 1 and 2.
Derricking mechanism
Note:
1. Before operating derricking mechanism, the operator must first choose correct
boom configuration by turning boom configuration switch to required position. As
to the different derricking methods, they are determined by selected boom
configuration.
Main boom angle can vary from 0 to 83, and main boom can be raised and lowered via main
boom derricking winch.
The fixed jib can be mounted in the angle of either 10 or 30 to main boom. Once the angle is
set, it can not be changed during operation.
The main boom can be raised and lowered via main boom derricking winch.
Under this boom configuration, main boom can be fixed at 65, 75 or 85 position via main
boom derricking winch, while luffing jib can be raised or lowered via hoisting winch 1 or luffing
jib derricking winch.
Note:
- raise and lower main boom via main boom derricking winch;
- raise and lower main boom via main boom derricking winch;
-raise and lower luffing jib via luffing jib derricking winch.
0066340-200-04Y.C
a) Raise/lower boom
Place the “W1 winch/Assembly” switch in neutral position, and then move right control
lever to left and right to control the main boom derricking winch, see the above figure.
Note:
Under crane operation with main boom with luffing jib, main boom must be fixed at
65, 75 or 85 position.
Spool up winch 1
Place the “W1 winch/Assembly” switch in neutral position, and then use hoisting winch 1
(H1) to raise and lower the luffing jib by moving right control lever forwards and
backwards. At this time, the overwiding signal for H1 is shielded.
0066340-200-04Y.C
High-speed switch
Note:
2. Only use luffing jib derricking winch high-speed gear when operating the
luffing jib alone. Otherwise, it’s prohibited to use.
0066340-200-04Y.C
Turn the “W1 winch / Assembly” switch to “W1 winch” position, and then move right
control lever to left and right to control luffing jib derricking winch.
Move to right Reel off luffing jib derricking winch to lower luffing jib
Right control lever
Return to neutral
Luffing jib derricking winch stops working
position
0066340-200-04Y.C
Note:
1. The derricking operation must be carried out stably. Otherwise, a great impact
will be made on the crane with a load.
2. Only use luffing jib derricking winch high-speed gear when operating the
luffing jib alone. Otherwise, it’s prohibited to use.
0066340-200-04Y.C
4.5.3 Operation of synchronizing A-frame and main boom derricking winch and
synchronizing reeving winch and working winch
(1) The functions of synchronizing A-frame and derricking winch only works for
erecting the A-frame.
(2) Reeving winch synchronizing isn’t suitable for main boom derricking winch.
(1) Turn “synchronizing” switch on the right control panel to “Mast (A-frame) + E sync”
position, as described above.
(2) Turn “A-frame erecting/lowering” switch to the left “Erecting” position, as described
above.
(3) Then the A-frame is erected, while the main boom derricking winch is reeled off
synchronously and automatically;
(4) The movements “reel off main boom derricking winch” and “erect A-frame’ will be carried
out at the matched speed. And the movements can be stopped at any time according to
actual conditions.
(1) Prerequisite
After the A-frame reaching the required position, turn the synchronisation switch to
neutral position.
1) Reel off reeving winch. The rope of reeving winch is reeved in accordance with the
reeving diagrams, however in reverse direction with hoisting rope between the rope
pulleys in the boom head and the hook block.
Turn the reeving winch switch to the right on right control panel– reel off reeving
winch.
2) Attach the rope end point of reeving winch to hoisting rope for winch 1 (or winch 2) with
rope lock.
3) The hoisting winch 1 (or 2) is reeled off, while the reeving winch is spooled up at the
same time.
Turn the reeving winch switch to left, then the reeving winch is spooled up.
1. Reel off hoisting winch 1 (or 2) when spooling up the reeving winch.
2. The speed of spooling up reeving winch should be higher than the speed
of reeling off hoisting winch 1 (or 2).
4) Release the hoisting rope from the rope lock after the rope of hoisting winch 1 (or 2)
is reeved between the load hook and boom head.
0066340-200-04Y.C
(1) When the assistant guides the hoisting rope to the rope pulley on the
boom head, the crane operator must operate the reeving winch. This
procedure must be done in such a manner that the rope does not slacken
up on the winding drum.
(2) Reeving can be done manually or with the help of a reeving winch.
If the reeving winch is used, the rope on it must first be reeved in reverse
direction between the hook block and the rope pulleys on boom head and
then connected with the hoisting rope of winch 1 (or winch 2).
1) Turn “synchronization switch” to the left “Reeve SYNC” gear, which is described as
above;
2) Push right control lever forwards and backwards, the reeving winch and hoisting
winch 1 will carry out synchronous movements, namely, reeling off hoisting winch 1
and spooling up reeving winch, or spooling up hoisting winch 1 and reeling off
reeving winch.( Push left control lever forwards and backwards, the reeving winch
and hoisting winch 2 will carry out synchronous movements. namely reeling off
hoisting winch 2 and spooling up reeving winch, or spooling up hoisting winch 2 and
reeling off reeving winch)
3) After hoisting rope is reeved well, return the “synchronization” switch to neutral
position, and remove the rope lock connecting the reeving rope and hoisting rope.
Finally wind the reeving rope onto the reeving winch.
(1) The operation mentioned above must be carried out by at least tow persons.
(2) After the hositing rope is reeved correctly between rope pulleys, the
“synchronization” switch must be returned to neutral position.
0066340-200-04Y.C
The slewing mechanism consists of hydraulic motor, planetary gear reducer, brake, drive gear
and slewing ring, etc. The slewing speed can be adjusted by changing the inclination angle
of control lever.
An independent piston variable pump is applied to hydraulic system to supply oil, which can
adjust slewing speed accurately.
Note:
1. The speed range for slewing movement must be set according to the load
capacity charts.
2. Operating with high slewing speed will cause an increased risk of accidents!
Before initiating any slewing movements, the operator must make sure that there
are no persons or obstacles within slewing radius. Otherwise, there is an
increased risk of accidents. Before carry out slewing movement, an acoustic
signal should be given.
Slew to right
Slew to left
High-speed
switch of left Left control
control lever lever
Note:
1. The automatic speed of slewing mechanism is low speed. After pressing the
high-speed switch of left control lever, the slewing mechanism can work at full
speed.
If the load hook is not positioned vertically over the load’s center of gravity before lifting
operation, the operator can press the button on the left control lever to activate swing free
running mode. At this moment, the side force on the boom can be reduced, and the boom and
superstructure, under the effect of external fore, are pulled to the position where the load hook
is vertical to the load’s center of gravity. In this way, pulling the load obliquely can be avoided
and the equipment can be protected against damage.
0066340-200-04Y.C
Press the button on the left control lever, the movement “Swing free running” will be carried
out.
After hoisting rope is vertical, the movement “Swing free running” stops.
Note:
1. When carrying out the movement “Swing free running”, operate the control lever
to lift the hook at the same time. In this way, the side force will be produced on
the wire rope to make load hook vertical to the boom.
2. Before each swing of the superstructure the crane operator must personally
make sure that there are no obstacles in the crane slewing area and no person
is in the danger zone. Give a short warning signal (horn) before starting a crane
movement.
3. When slewing with a load, initiate the slewing movement very carefully. It is
prohibited to stop slewing movement or change slewing direction jerkily.
7. In order to ensure safe operation, the customer should check slewing ring bolts
with 1800N.m tightening torque after initial 100 operating hours. Then check and
tighten them after 300 operating hours. After that, do the checks every 500
operating hours.
Slewing mechanism and Winch Left control lever(left and right)+ right control
1
1 lever(forwards and backwards)
Slewing mechanism and Left control lever(left and right)+ right control
2
derricking mechanism lever(left and right)
Slewing mechanism and winch Operate the left control lever in 20°~70°
3
2 range
Winch 1 and derricking Operate the right control lever in 20°~70°
4
mechanism range
Slewing mechanism + winch 1 Left control lever(left and right)+ right control
7
(luffing jib) lever(forwards and backwards)
Winch 1+ luffing jib derricking Operate the right control lever in 20°- 70°
8
winch range
Winch 1+ luffing jib derricking Left control lever(left and right)+ right control
10
winch lever(left and right)
The operator’s cab, an independent cabin, can make relative movement to the basic machine.
It can not only tilt forwards or backwards, but also swivel sideways. Under working condition,
the cab can not be swiveled out, but can be tilted forwards and/or backwards. Only when the
crane transfers from transport position to working position, can the cab be swiveled out.
0066340-200-04Y.C
Swivel arm of
Operator’s cab operator’s cab
To reduce the transport width of the basic machine on the low-loader, the operator’s cab must
be swiveled out of the side working position to the centre of slewing table.
Slewing
Traveling direction
table
Before swiveling the cab from transport position to working position, the operator must swivel
the swivel arm of cab 90 ° manually and then secure it with pin spindle.
Insert fixing pin spindle to secure the swivel arm after cab is in the working position.
0066340-200-04Y.C
Note:
1. Swiveling the operator’s cab to the transport condition is carried out in reverse
order.
2. Do not operate any other devices when swiveling the operator’s cab.
4. Take off the interior light on the roof of cab before swiveling the operator’s cab.
The cab should not collide with tilting-back support cylinders of main boom when
it is swiveled out.
In order to enlarge the view of crane operator, the cab can tilt forwards or backwards using
tilting cylinder.
When tilting cylinder is retracted, the cab will tilt backwards to a maximum of 20°.
This function can be achieved by operating “Tilt cab forwards/backwards” switch in operator’s
cab, which can make cab stop and maintain at any position within the range of 0°- 20°.
0066340-200-04Y.C
When cab is horizontal, turn the “tilt cab forwards/backwards” switch to the left, then the
cab will tilt backwards. After it tilts to proper position, turn the switch to neutral position.
Turn the “tilt cab forwards/backwards” switch on the right control panel to the left, the cab
will tilt backwards;
Turn the “tilt cab forwards/backwards” switch on the right control panel to the neutral
position, the cab will stop tilting backwards.
When operator’s cab is tilted backwards, turn the “tilt cab forwards/backwards” switch to
the right, then the cab will tilt forwards. After it tilts to proper position, turn the switch to
neutral position.
Turn the “tilt cab forwards/backwards” switch on the right control panel to the right, the
cab will tilt forwards;
Turn the “tilt cab forwards/backwards” switch on the right control panel to the neutral
position, the cab will stop tilting forwards.
0066340-200-04Y.C
The auxiliary remote control box, located on the right side of slewing table, is mainly used for
self-assembly & dismantling operation. The functions of switches on it are shown in following
figure.
Undercarriage control Only when this switch is turned on, can the support cylinder
106
switch control levers be operated. (For details, see Section 4.5.8)
Note:
As soon as the emergency stop switch is pressed, the power supply of machine is
cut off and the engine shuts down!
No. Description
109 Changeover switch, FL support cylinder / left crawler carrier extension cylinder
110 Changeover switch, RL support cylinder / right crawler carrier extension cylinder
Note:
1. As soon as the emergency stop button is pressed, the power supply of machine is
cut off and the engine shuts down!
2. Before carrying out the following operation, the undercarriage auxiliary device
switch should be switched on. Otherwise, no movements are performed.
Place the switch 109 in “FL support cylinder” position, and then push the
Extend toggle-switch 116 to “Extend” position. (Note: the switch 116 is a self-return
Front left switch. Release it after the cylinder is extended to prescribed position.)
support Place the switch 109 in “FL support cylinder” position, and then push the
cylinder toggle-switch 116 to “Retract” position. (Note: the switch 116 is a
Retract
self-return switch. Release it after the cylinder is extended to prescribed
position.)
Place the switch 110 in “RL support cylinder” position, and then push the
Extend toggle-switch 116 to “Extend” position. (Note: the switch 116 is a self-return
Rear left switch. Release it after the cylinder is extended to prescribed position.)
support Place the switch 110 in “RL support cylinder” position, and then push the
cylinder toggle-switch 116 to “Retract” position. (Note: the switch 116 is a
Retract
self-return switch. Release it after the cylinder is retracted to prescribed
position.)
Place the switch 111 in “FR support cylinder” position, and then push the
Front toggle-switch 116 to “Extend” position. (Note: the switch 116 is a self-return
right Extend
switch. Release it after the cylinder is extended to prescribed position.)
support
0066340-200-04Y.C
cylinder Place the switch 111 in “FR support cylinder” position, and then push the
toggle-switch 116 to “Retract” position. (Note: the switch 116 is a
Retract
self-return switch. Release it after the cylinder is retracted to prescribed
position.)
Place the switch 112 in “RR support cylinder” position, and then push the
Extend toggle-switch 116 to “Extend” position. (Note: the switch 116 is a self-return
Rear right switch. Release it after the cylinder is extended to prescribed position.)
support Place the switch 112 in “RR support cylinder” position, and then push the
cylinder toggle-switch 116 to “Retract” position. (Note: the switch 116 is a
Retract
self-return switch. Release it after the cylinder is retracted to prescribed
position.)
Place the switches 109, 110, 111 and 112 in “FL support cylinder”, “RL
support cylinder”, “FR support cylinder” and “RR support cylinder”
Extend positions, and then push the toggle-switch 116 to “Extend” position to
extend four cylinders simultaneously. (Note: the switch 116 is a self-return
All
switch. Release it after the cylinder is retracted to prescribed position.)
support
Place the switches 109, 110, 111 and 112 in “FL support cylinder”, “RL
cylinders
support cylinder”, “FR support cylinder” and “RR support cylinder”
Retract positions, and then push the toggle-switch 116 to “Retract” position to
retract four cylinders simultaneously. (Note: the switch 116 is a self-return
switch. Release it after the cylinder is retracted to prescribed position.)
Place the switch 109 in “Left crawler carrier extension cylinder” position,
and then push the toggle-switch 116 to “Extend” position. (Note: the switch
Left Extend
116 is a self-return switch. Release it after the cylinder is extended to
crawler
prescribed position.)
carrier
Place the switch 109 in “Left crawler carrier extension cylinder” position,
extension
and then push the toggle-switch 116 to “Retract” position. (Note: the switch
cylinder Retract
116 is a self-return switch. Release it after the cylinder is retracted to
prescribed position.)
Place the switch 110 in “Right crawler carrier extension cylinder” position,
and then push the toggle-switch 116 to “Extend” position. (Note: the switch
Right Extend
116 is a self-return switch. Release it after the cylinder is extended to
crawler
prescribed position.)
carrier
Place the switch 110 in “Right crawler carrier extension cylinder” position,
extension
and then push the toggle-switch 116 to “Retract” position. (Note: the switch
cylinder Retract
116 is a self-return switch. Release it after the cylinder is retracted to
prescribed position.)
0066340-200-04Y.C
Turn the “A-frame erecting/lowering” switch on right control panel to the left, A-frame
erection cylinder will be extended.
Turn the “A-frame erecting/lowering” switch on right control panel to the right, A-frame
erection cylinder will be retracted.
The above mainly introduces the operation of A-frame erection cylinder. As to the
operation of A-frame during self-assembly & dismantling, refer to section 5.2.2.
Turn “W1 Winch/Assembly” switch on the right control panel to “Assembly” position, as
described above.
Push right control lever forwards, the mounting cylinder will be extended to low the load;
Push right control lever backwards, the mounting cylinder will be retracted to lift the load.
0066340-200-04Y.C
When operating self-assembly & dismantling mechanism, turn the “W1 winch /
Assembly” switch to right.
The emergency control box is used only when the control system malfunctions.
Before operating the emergency control box, plug its 24-pin plug into the 24-hole socket
(X109) inside the electrical control box, which is near the slewing table.
(1) The emergency control box must only be used in an emergency to make crane do
safe motions.
(2) When control system is working normally, the emergency control box is not used
generally. It must be put in the waterproof toolbox, and the electrical connection
between emergency control box and electrical control box is disconnected.
0066340-200-04Y.C
Select proper load hook and rope reeving in accordance with operational planning and different
boom configurations.
Type of load hook Maximum rope reeving Weight of load hook (Ib)
573300 Ib 20 9300
352800 Ib /220500 Ib 12/8 6200
110250 Ib 4 3900
66150 Ib 2 2400
35280 Ib 1 2000
Winch 1 (1.3)
Winch 1 (1.3)
Winch 1 (1.3)
0066340-200-04Y.C
Winch 1 (1.3)
Winch 1 (1.3)
0066340-200-04Y.C
Winch 1 (1.3)
Winch 1 (1.3)
Winch 1 (1.3)
0066340-200-04Y.C
4.6.4.2 Hoisting rope guidance for tip boom on the luffing jib
Derricking pulley
in A-frame Derricking pulley in A-frame
beam
Derricking pulley at the tail
end of slewing table
Derricking pulley
Main boom
at the tail end of
derricking winch
Main boom derricking winch slewing table
0066340-200-04Y.C
WA-frame 1
WA-frame 2
Hoisting winch 1
Assembly and
Chapter 5 dismantling
0066340-200-05Y.C
b) The hoisting rope must be reeved between the rope pulley on the main boom head and
load hook in accordance with the corresponding hoisting rope reevings specified in
Rope Reeving in chapter 4.
d) For assembly work on the crane, a safety assembly scaffolding/ working platform
should be used. Improvisations are prohibited. Otherwise, there is a danger of falling
down.
e) Remove obstacles away from the ground on the site before assembling and
dismantling. In addition, the ground on the site should be cordoned off to prevent
access by unauthorized person.
f) Assembly of the boom must be done over the front or rear of the undercarriage of the
machine; attention must be given to choose flat and solid ground to ensure proper
support of the crane.;
g) The fly jib should be assembled in accordance with the maximum permissible boom
length, and the wire rope should be installed strictly according to the hoisting rope
reevings.
h) Each dismantled part should not only satisfy the requirement of load-bearing capacity
under operating conditions, but also meet the art technology requirement of
self-assembling /dismantling operation which must be carried out strictly in accordance
with design requirement since the self-assembling /dismantling operation is a
complicated lifting process.
i) Lattice components which are not in contact with the ground during
assembly/disassembly must be supported by appropriate and stable objects.
j) Make sure that no one is standing beneath the lattice boom when the lattice boom is
pinned or unpinned.
k) Following certain disassembly principles and methods, QUY260 crawler crane can be
divided into several parts for transportation. Main parts include undercarriage centre
section, slewing table, A-frame and luffing pulley blocks, whose gross weight should be
controlled within 105840Ib. The slewing table and undercarriage centre section should
be placed in the same direction, and operator’s cab should be swung in 90°. Crawler
carrier should be transported as a whole part. Boom system can be dismembered into
boom sections and fly jib can be placed in main boom and secured with two chains
during transportation. If lattice components are not secured, the inside lattice
components will slide out and fall down which may cause severe accident.
0066340-200-05Y.C
Only when the angle of luffing jib to main boom reaches 100°(main boom angle is
larger than 65°) and the luffing jib is not attached with a load hook, can it be raised up;
to lay down the luffing jib, make sure that the angle between the main boom and luffing
jib is equal to or larger than 10° when the tilting-back supports of luffing jib are yet not
dismantled.
a) Clearly define the duty and area of responsibility of all personnel concerned.
d) Check whether there are any live wires within the operating range of the crane and make
sure that any parts of the crane are not in contact with the live-wire when crane
movement is carried out.
e) Checks that appropriate operating site has been selected so that the crane movements
can be performed within maximum and minimum working radius.
f) Check whether there are obstacles which will hinder required crane operations.
h) Know clearly about the type of crane operation and working mode.
i) Check the distance between the lifting points and surrounding buildings;
o) Communication means must be agreed upon by both the signalman and crane
operator;
p) Take appropriate measures to keep people unconcerned and equipment away from the
working range;
Note:
To master the actual condition of lifting operation accurately and ensure safe operation,
the safety measures mentioned above should checked and a proper operational planning
should be carried out.
0066340-200-05Y.C
5.1.3 Inspection of wire rope, load hook, rope pulley and anchoring rods
The ropes must be checked by an expert before assembly and checks must be
performed at regular intervals in order to detect possible damage or wear and tear at an
early stage.
The ropes must be removed immediately if any of the following damage is detected:
a) Breakage of a strand;
b) Wire breaks;
c) reduction in the rope diameter by more than 10% of the nominal size
d) Rope deformation.
The replacement rope must comply with the original rope specifications, including length,
diameter and strength rating. The cam-type limit switch must be readjusted if a new
hoisting rope is used!
Damaged rope pulley should be repaired or changed prior to replacing wire rope;
otherwise, new wire rope will be damaged.
5.1.3.1.1 A small piece of rope is cut and clipped to the dead end. This method is good for regular
rope and is approved by ASME sTANDARD B30.5. Distance S
" " should be approximately
3xrope diameter or 75mm (3in),whichever is less,please see the warning in Clause E5 for its
use.
b) Inspect all bolts and screws, and ensure all cotter pins are complete.
0066340-200-05Y.C
c) Check that the rotary connection of hook can move easily, and the clearance is not
too large;
d) Check the easy rotation of the hook: rotate the hook by hand. If it is stiff, it indicates
that the bearing has been damaged;
b) If rope pulleys have been hit during crane operation (for example on buildings) or if
they were subjected to other stress factors, they must be then extensively checked
for damage or cracks.
c) Check for wear on the rope groove. Replace the pulley if the bottom of the rope
pulley has been worn down more than 1/4 of the rope diameter.
d) If any damage or cracks are found, then the rope pulley must be replaced
immediately. If this is not observed, there is great danger of causing a serious
accident!
e) Check rope pulley for tight fit and shakes; Loose and shaken rope pulley indicates
that the bearing and bearing bush is damaged.
b) The anchoring rods, if removed from boom frame for transportation, must be
re-assembled according to anchoring rods configuration;
d) The anchoring rods should be checked regularly. For the items to be checked,
please refer to the Section 7.6 “Inspection and maintenance of anchoring rods” in
Chapter 7.
0066340-200-05Y.C
When hydraulic lines are connected or disconnected using quick-release couplings please
ensure that the coupling procedure is being performed correctly.
a) Depressurize hydraulic system before connecting and disconnecting (switch off the
engine and wait for about 5 minutes).
b) Coupling parts (cathode end and anode end) are plugged into each other and
screwed together using the hand-tightened nut.
c) Turn the hand-tightened nut over the O-ring until a firm and tight fit is attained.
d) The hydraulic couplings may only be tightened or unscrewed by hand rather than by
tools which may cause damage to couplings.
Danger: Improperly connected couplings may lead to a loss of pressure or sudden leaking,
thereby causing accidents.
Before setting up and taking down the boom system, ensure that the following prerequisites
are met:
b) The counterweight plates have been attached in accordance with the load capacity
chart.
c) All limit switches has been correctly fitted and are fully operational;
d) The main boom and fly jib have been attached in accordance with the boom
configurations and operating instructions.
f) The hoisting rope has been correctly placed in the rope pulleys and prevented from
jumping out (from rope groove) using rope retaining pins.
h) In winter, the main boom, fly jib and associated components (limit switches, rope drums,
warming lamp, anemometer etc.) must be kept free of ice and snow.
Danger:
Incorrectly fitted or faulty limit switches and falling parts (pins, retaining pins, ice etc.) can
cause injury.
0066340-200-05Y.C
5.2 A-frame
The A-frame erecting mechanism consists of A-frame, erection cylinder and auxiliary
hydraulic system, etc. it is mainly used for the assembly, dismantling or conversion of the
machine on the site. Erect the A-frame by the erection cylinder to the upper tilt point at
approximately 110° (the angle of A-frame to the front horizontal line is 70°). When A-frame
tilts forwards under its own weight, the main boom derricking winch is simultaneously
operated in a lowering direction until A-frame reaches 165° (the angle of A-frame to the front
horizontal line is 15°). Under this condition, the A-frame erecting mechanism can be used to
connect anchoring rods and used as a mounting crane.
— After the A-frame is tilts forwards to a required position, the boom sections, and
0066340-200-05Y.C
crawler carriers and individual counterweight plate can be lifted by the mounting
cylinder on A-frame. in the process of self assembly & dismantling, the A-frame
erecting mechanism serves as a mounting crane, whose maximum lifting capacity
is 55125Ib in 16′4″working range;
— The derricking mechanism of the crane is composed of A-frame and the boom frame,
the A-frame is therefore an integral part of the derricking mechanism.
b) To connect the hydraulic lines, the operator just need to plug the anode end of
quick-release coupling into the cathode end of it.
c) To distinguish between the two quick-release couplings of the same type, on the
mounting plate are often installed a cathode end of one coupling and an anode end of
the other coupling.
Two quick-release couplings are fitted on the left arm of A-frame(see following diagram)
Quick-release coupling
0066340-200-05Y.C
Caution:
When hydraulic lines are connected and disconnected using quick-release couplings,
please ensure that the coupling procedure is being performed correctly.
1. Depressurize hydraulic system before connecting and disconnecting. Turn off engine and
wait for 5 minutes.
2. Coupling parts (cathode end and anode end) are plugged into each other and screwed
together using the hand-tightened nut.
3. Turn the hand-tightened nut over the O-ring until a firm and tight fit is attained.
4. The couplings may only be tightened by hand rather than by tools which will cause
damage to coupling.
Fit together the protective covers of the hydraulic couplings and hydraulic connectors.
Danger:
Improperly connected couplings may lead to a loss of pressure or sudden leaking, thereby
causing accidents.
0066340-200-05Y.C
Turn the switch (57) on the right control panel (4) to the left——erect A-frame
Turn the switch (57) on the right control panel (4) to the right——lower A-frame
Caution:
1. The control lever code and control panel code appeared in this chapter are detailed in section
4.1 “Control and operating instruments” of chapter 4 “Crane Operation”
2. The operation mentioned above should be performed by two persons. One worker gives
guidance (watch the A-frame, erection cylinder and rope guiding condition on the derricking
winch), while another worker operates.
Note: before operation, make sure that derricking rope is reeved between derricking pulley
block on A-frame and that on slewing table and sit well in the derricking pulley block.
a) Turn switch (57) in operator’s cab to the left or push up “A-frame erecting/lowering”
switch on the auxiliary remote control box, the erection cylinder will extend to erect
A-frame from 0°position upwards until the derricking rope between the slewing table
and the derricking pulley block is tensioned, and then move the right control lever (27)
to the right to reel off the derricking winch.
b) After A-frame is erected to 110° position, return the switch (57) or “A-frame
erecting/lowering” switch on the auxiliary remote control box to neutral position, and
then the erection cylinder will stop movement. At this time, A-frame tilts forwards under
its own weight, and the derricking winch is reeled off simultaneously.
c) When A-frame tilts forwards under its own weight to 165° limit position, return the right
control lever(27) to neutral position to stop the movement of “reel off the derricking
winch ”
0066340-200-05Y.C
Caution:
1. A-frame movement limit should not be exceeded; otherwise, the crane is likely to topple
over.
2. A-frame position can be adjusted within its movement limit depending on different
working requirements.
a) Move the right control lever (27) to the left to spool up the derricking winch, and the
A-frame will be raised backwards.
b) After A-frame is raised by the derricking rope to 110° position, turn the switch (54) in
operator’s cab to the right or push down “A-frame erecting/lowering” switch on the
auxiliary remote control box, the erection cylinder will retract, and A-frame will also
retract.
c) When the erection cylinder and A-frame return to original or required position, return the
switch (57) in operator’s cab or “A-frame erecting/lowering” switch on the auxiliary
remote control box to neutral position, and then the erection cylinder will spot motion. At
the same time, move the right control lever (27) to neutral position to stop the
movement of “spool up the derricking winch”.
Caution:
1. No person may stand underneath A-frame as long as A-frame is moving; otherwise there is a
risk of injury.
a) Jobsite
1) The ground on the jobsite must be firm and flat. If necessary, steal plate should be
padded.
2) It should be large enough for trailer traveling and auxiliary hoist operation.
All operators should be familiar with operating procedure and safety regulations and
clear about their areas of responsibility before operation.
a) After the basic machine reaches the jobsite, remove related fixing devices and the
package.
b) Swivel the operator’s cab from transport position to working position and then secure it
with “fixing pin for swivel arms”
Forward
Slewing table
direction
- pull out the fixing screw for support plates on the undercarriage centre section
- detach the support plates and assemble it under the support cylinder
e) Use bonded wooden plates or steel plates to underlay all support plates.
- Before operate the support cylinders and crawler carrier bolting cylinders, turn on
“undercarriage auxiliary control switch” in the auxiliary remote control box (see
Section 4.5.7), and then operate the undercarriage control levers.
- Each support cylinders and crawler carrier bolting cylinders can not only be controlled
0066340-200-05Y.C
Note: in the assembling process, the maximum force support cylinder can bear is
63945 Ib.
Caution:
1. In no circumstance, can the extending of support cylinders be carried out by one person. At
least two assistants are available to support the basic machine. One assistant operates the
control levers while another assistant watches the position of support cylinders and see
whether the crawler carrier bolting cylinder is extended to specified position.
2. When the support cylinders are operated, the engine should run at low-middle speed (about
1000-1500rpm).
3. The support cylinders should be extended on firm and even ground. During operation, pay
attention to the level state of basic machine.
0066340-200-05Y.C
a) Tilt the A-frame forwards according to the Section 5.2 “ Operation of A-frame”
b) Turn “self-assembly& dismantling” switch on the right control panel to right and push the
right control lever (27) forwards, and then the mounting cylinder on A-frame will be
extended. Connect the mounting cylinder to crawler carrier with assembling chain.
Caution:
Hang the twin hook on the loose end of the attachment in the holes of the floor plate
underneath to prevent the crawler carrier from hanging down during mounting of the crawler
carrier.
c) Push the right control lever (27) backwards to retract the mounting cylinder to lift the
first crawler carrier from the transport vehicle.
Slowly raise A-frame and adjust the mounting cylinder to align the crawler carrier
exactly on the bolting points on the undercarriage centre section. Carefully and
sensitively position the crawler carrier by the undercarriage centre section and upper
limit plate of crawler carrier.
0066340-200-05Y.C
Turn on “undercarriage auxiliary control” switch on the auxiliary remote control box,
and then extend the crawler carrier bolting cylinders with appropriate control lever. In
this way, the first crawler carrier is attached on the undercarriage centre section by the
bolting cylinders.
Positioned by the upper limit plate of crawler carrier and undercarriage centre section
Overhang beam
Upper limit plate of crawler
of undercarriage
carrier
centre section
Bolting
cylinder
Caution:
Bring the transport vehicle with the first crawler carrier as close as possible to the basic
machine to make sure that the distance between the centre of crawler carrier and the
rotation axis of the upper carriage is smaller than or equal to 5m.
Note: the slewing radius of hook attached to the mounting cylinder on A-frame must be
smaller than or equal to 5m.
0066340-200-05Y.C
a) Slew the superstructure to a position where the second crawler carrier can be attached.
The assembly sequence for the second crawler carrier is essentially the same as for the
first crawler carrier.
b) After the second crawler carrier is attached, it must be lowered on the ground by
retracting the support cylinders.
c) Detach the support plates from support cylinders and fixed them on undercarriage
centre section.
d) Retract the support cylinders completely. Swivel inwards the folding brackets and
secure them with locking pins.
e) Swivel in the locking plate on folding bracket and secure it with locking pin.
Caution:
1. The slewing radius of hook attached to mounting cylinder on A-frame must be no more
than 16′4″; otherwise the basic machine may turn over.
2. When mounting the crawler carrier, nobody is permitted to stand in the working radius.
3. Crawler carrier bolting cylinders which are used to connect the crawler carriers to
undercarriage centre section should be greased.
0066340-200-05Y.C
There are 8 hydraulic lines in total led out from the left and right sides of undercarriage
centre section, which are respectively connected to the left and right crawler carrier. Take
the hydraulic connection to the left crawler carrier for example:
To distinguish between the two quick-release couplings of the same type, a cathode end of
one coupling and an anode end of the other coupling are often installed on the mounting
plate.
Quick-release coupling
Fit together the protective covers of the hydraulic couplings and hydraulic connectors.
Note:
When hydraulic lines are connected and disconnected using quick-release couplings,
please ensure that the coupling procedure is being performed correctly.
1. Depressurize hydraulic system before connecting and disconnecting. Turn off engine and
wait for 5 minutes.
2. Coupling parts (cathode end and anode end) are plugged into each other and screwed
together using the hand-tightened nut.
3. Turn the hand-tightened nut over the O-ring until a firm and tight fit is attained.
4. The couplings may only be tightened by hand rather than by tools which will cause
damage to coupling.
Danger:
Improperly connected couplings may lead to a loss of pressure or sudden leaking, thereby
causing accidents.
0066340-200-05Y.C
The central counterweight consists of two central counterweight plates, which are located at
the front and rear of the undercarriage between the crawler carriers. After the basic machine
is fitted with the left and right crawler carriers, lift the first counterweight plate from transport
vehicle and lay it on the supports on the inside of crawler carriers after rotating the
superstructure to the front of crane. The second counterweight plate is installed at the rear
end of crane in the same way (for the operation of superstructure, A-frame and mounting
cylinder, please refer to Section 5.3 “attaching the crawler carriers”).
Central counterweight
Lift the counterweight base plate and lay it on a flat ground, and then lift the individual
counterweight plate one by one from the transport vehicle and stack them on the base
plate by aligning them over the fixing position (two circular prominences) at the two
sides of base plate. Fix the counterweight locking chain and secure it (the locking
chain passes through the center of counterweight).
0066340-200-05Y.C
b) Push up the “left and right counterweight control” switches on the auxiliary remote control
box, the left and right counterweight cylinders will extend to lift the counterweight.
Tail-end of slewing
table
c) If the counterweight is not level during the lifting process, adjust one counterweight
cylinder by the “counterweight left/right lifting cylinder” switch to make the counterweight
to be level. And then extend or retract the two counterweight cylinders simultaneously;
d) Turn on the “counterweight bolting cylinder” switch on the auxiliary remote control box to
extend the counterweight bolting cylinder to required position and secure the bolting
cylinder with retaining spring. After that, retract the counterweight cylinders.
0066340-200-05Y.C
e) The dismantling of counterweight plates is carried out in the reverse order to assembling.
Caution:
1. When stacking the counterweight plate on top of one another, align the upper
counterweight plate over the circular prominences at the two sides of the lower
counterweight plate and secure well.
3. In the process of self assembly& dismantling, A-frame can only be used to lift one
counterweight plate at a time.
0066340-200-05Y.C
G10
G22
G12
G25
G15 G29
G15
G15
G15
G15
G15
G15
G15
G15
G15
G15 G15
G14
G14
G13 G13
G11 G11
G70 G70
G17 G17
G32 G74
G41
G74 G34 G37
G75
G37
G31
G12
G75
G12
G15
G15
G15
G15
G15
G15
G15
G15
G15
G15
G15
G15
G13
G13
G11 G11
G70 G70
G1
G17
SF---Fixed jib on heavy duty boom SFV---Heavy fixed jib on heavy duty boom
0066340-200-05Y.C
G20
G22
G25
G25
G25A
G24
G24
G23
G27 G21
G28 G71
G12
G72
G15
G15
G15
G15
G14
G11
G70
G17
Danger:
1. Any other boom configurations and anchoring rods combination that have not been
stipulated in the operating manual are prohibited.
2. When attaching boom sections, make sure that the intermediate sections are assembled to
their specified positions; otherwise there is a risk of accidents.
0066340-200-05Y.C
The heavy duty boom, whose length varies from 65′7″~272′3″, comprises basic boom
and an optional number of main boom intermediate sections. The basic boom is 65′7″
long, including main boom pivot section (G11), main boom head (G12), tip boom (G10).
There are three types of main boom intermediate section: 9′10″ main boom intermediate
section (G13), 19′8″ main boom intermediate section (G14) and 29′6″ main boom
intermediate section (G15).
the longest heavy duty boom of 83m, overview:
G10
G12
G15
G15
G15
G15
G15
G15
G14
G13
G11
G70
G17
0066340-200-05Y.C
When different main boom length is required, crane operator only needs to disconnect
main boom pivot section from main boom head, and then install main boom intermediate
sections between them. In this way, main boom can be assembled to required length.
Principle for assembling main boom: when connecting main boom intermediate sections,
always bolt the shorter intermediate sections first.
Danger:
1. Pin different boom sections strictly in accordance with main boom assembly table.
2. The operator should not stand inside the boom or beneath it when the boom sections are
pinned.
5.7.1.2 Connecting the hydraulic lines to luffing winch(if luffing winch is used)
To connect the hydraulic lines, the operator just needs to plug the anode end of quick-release
coupling into the cathode end of it.
To distinguish between the two quick-release couplings of the same type, on the mounting
plate are often installed a cathode end of one coupling and an anode end of the other
coupling.
The mounting plate for quick-release coupling is installed on the left side of boarding (see
following fig.) on the mounting plate are fixed five ends of five quick-release couplings, and
the rest five ends are fixed on the left side plate of bottom section of A-frame.
0066340-200-05Y.C
Quick-release coupling
Fit together the protective covers of the hydraulic couplings and hydraulic connectors.
Caution:
When hydraulic lines are connected and disconnected using quick-release couplings, please
1. Depressurize hydraulic system before connecting and disconnecting. Turn off engine and wait
for 5 minutes.
2. Coupling parts (cathode end and anode end) are plugged into each other and screwed
3. Turn the hand-tightened nut over the O-ring until a firm and tight fit is attained.
4. The couplings may only be tightened by hand rather than by tools which will cause damage to
coupling.
0066340-200-05Y.C
Danger:
Improperly connected couplings may lead to a loss of pressure or sudden leaking, thereby causing
accidents.
Each kind of boom is assigned to anchoring rods of specific length, and the anchoring rods
should be connected strictly in accordance with the given method.
Now, we will illustrate the connection method of anchoring rods of different main boom, for
example basic boom of 65′7″.
0066340-200-05Y.C
0066340-200-05Y.C
Part
Description Illustration
No.
1 Pin spindle
2 Cotter pin
ISO1234-1997(0.4″×3.8″)
Anchoring rod
3 connected to main
boom
4 Pin spindle
5 Retaining pin
Single-anchoring
6
rod
7 Pin spindle
Double-anchoring
8
rod
0066340-200-05Y.C
Single-anchoring
9
rod
Double-anchoring
10
rod
11 Coupling link
12 Pin spindle
Double-anchoring
13
rod
14 Reducing piece
15 Cotter Pin
ISO1234-1997(0.48″×4.8″)
0066340-200-05Y.C
16 Pin spindle
Double reducing
17
piece
Single-anchoring
18
rod
19 Coupling link
20 Cotter Pin
ISO1234-1997(0.4″×4.8″)
21 Pin spindle
0066340-200-05Y.C
anchoring rod
22 connected to
A-frame
23 Cotter Pin
ISO1234-1997 (0.32″×2.4″)
24 Pin spindle
Note:
The part number of main boom anchoring rods given in Section 5.7.1.3 “combination of main
boom anchoring rods” is consistent with that in the above table, so the component parts of
anchoring rods can be found by referring to the part number.
41m
38m
35m
32m
29m
26m
23m
20m
0066340-200-05Y.C
Connecting diagram of main boom anchoring rods
0066340-200-05Y.C
G22
G25
G29
G15
G15
G15
G15
G15
G15
G14
G13
G11
G70
G17
0066340-200-05Y.C
When different main boom length is required, crane operator only needs to disconnect
pivot section from main boom head, and then install intermediate sections between them.
In this way, the main boom can be assembled to required length.
G11+ G11+
(282′0″) (301′9″)
G13+G14+6×G15+G29+G22 G13+G14+6×G15+G29+G24+G22
G11+ G11+
(291′11″) (311′7″)
G13+G14+6×G15+G29+G23+G22 G13+G14+6×G15+G29+G25+G22
Principle for assembling boom sections: when connecting boom intermediate sections,always bolt
the shorter intermediate sections first.
For this boom configurations, the first 239′5″ long boom is composed of main boom sections, and
the rest boom is either composed of 13′1″ reducing section (G29) and luffing jib head (G22), or
13′1″ reducing section (G29), lufffing jib head (G22) together with a luffing jib intermediate
section (i.e. G23, G24 or G25). See the table above.
To A-frame
To41m
light
anchoring rods
38m
38m
Anchoring rods of heavy duty boom (it length is 231′2″)
35m
35m
32m 32m
Caution:
32m
For 29m
part number of main boom anchoring rods, please see Section 5.7.1.3 “Combination of
29m
anchoring rods of heavy duty boom” 29m
26m 26m
26m
23m 23m
23m
20m 20m
20m
0066340-200-05Y.C
To anchoring
rods of heavy
To luffing jib
duty boom
head
0066340-200-05Y.C
Part
Description illustration
No.
1 Pin spindle
2 Retaining pin
Double-anchoring
3
rod
4 Coupling link
Single-anchoring
5
rod
6 Cotter pin
ISO1234-1997 (0.4″×3.8″)
7 Coupling link
0066340-200-05Y.C
Double-anchoring
8
rod
9 Pin spindle
Single-anchoring
10
rod
Double-anchoring
17
rod
Single-anchoring
19
rod
Single-anchoring
20
rod
Double-anchoring
21
rod
0066340-200-05Y.C
Note:
The part number of anchoring rods given in Section 5.7.2.2——b “light anchoring rods” are
consistent with those in the above table, so the component parts of anchoring rod can be found by
referring to the part number.
To luffing jib
To anchoring rods of heavy
head
duty boom
Note:
For the parts number of light anchoring rods given in the above table, please refer to
Section 5.7.2.2-b “light anchoring rods”
0066340-200-05Y.C
Installation position of intermediate tensioners for 291′11″ long light duty boom
13′1″reducing section
To luffing
To anchoring rods of jib head
heavy duty boom
Note:
For the parts number of light anchoring rods given in the above table, please refer to Section
5.7.2.2-b “light anchoring rods”.
0066340-200-05Y.C
Installation position of intermediate tensioners for 301′9″ long light duty boom
Tensioning rope
Part 10 of light anchoring
rods—single-anchoring rod Part 17 of light anchoring
rods—Double-anchoring rod
To anchoring rods of
heavy duty boom To luffing
jib head
Note:
For the parts number of light anchoring rods given in the above table, please refer to Section
5.7.2.2-b “light anchoring rods”.
0066340-200-05Y.C
Installation position of intermediate tensioners for 311′7″ long light duty boom
To anchoring rods of
heavy duty boom To luffing
jib head
Note:
For the parts number of light anchoring rods given in the above table, please refer to Section
5.7.2.2-b “light anchoring rods”.
0066340-200-05Y.C
Intermediate tensioners for 282′0″ and 291′11″ long light duty boom
Intermediate tensioners for 301′9″ and 311′7″ long light duty boom
Part
Description Illustration
No.
Double-anchoring
1
rod
0066340-200-05Y.C
2 Pin spindle
Single-anchoring
3
rod
Single-anchoring
4
rod
Double-anchoring
5
rod
6 Pin spindle
7 Retaining pin
Note:
Part numbers of intermediate tensioners given in Section 5.7.2.3 “intermediate tensioners on
the main boom” are consistent with those in the above table, so the component parts of
intermediate tensioners can be found by referring to the part numbers when assembling.
0066340-200-05Y.C
G32
G74
G34
G37
G31
G75
G12
G15
G15
G15
G15
G15
G15
G13
G11
G17 G70
0066340-200-05Y.C
FA-frame —G37
4′7″~7′4″
10′2″~12′9″
0066340-200-05Y.C
Fixed jib length (ft) assembly sequence of Fixed jib length (ft) assembly sequence of
fixed jib sections fixed jib sections
Part
Description illustration
No.
Double
1
anchoring rod
2 Pin spindle
3 Retaining pin
Reducing
4 double-
anchoring rod
Reducing
5 single-
anchoring rod
0066340-200-05Y.C
Single
6
anchoring rod
Double
7
anchoring rod
8 Cotter pin
ISO1234-1997 (0.4″×3.6″)
9 Pin spindle
Note:
The part numbers of anchoring rods given in Section 5.7.3.2——a “ Fixed jib front anchoring
rods” are consistent with those in the above table, so the component parts of anchoring rods
can be found by referring to the part numbers when assembling.
The width of fixed jib front anchoring rods is 1.8″, and the diameter of pin spindle is φ1.6″. When
fixed jib is 39′4″ long, the corresponding front anchoring rods is 49′0″ long. When fixed jib length
increases by 19′8″, a 10.8″-long double anchoring rod (part 1) and a 17′9″-long single anchoring rod
(part 6) should be added accordingly.
0066340-200-05Y.C
Combination of fixed jib front anchoring rods is shown in the following table
Combination of front anchoring rods of fixed jib
length of
fixed jib
Fixed jib Combination of fixed jib front anchoring rods (between FA-frame to
front
length (ft) fixed jib)
anchoring
rods (ft)
12m
18m
24m
30m
A view
To FA-frame
B
To main boom
C
C B
D
0066340-200-05Y.C
Part
Description illustration
No.
1 sleeve
2 Cotter pin
ISO1234-1997(0.16″×1.2″)
3 Nut
ISO4032-1999(M20-8)
4 Bolt
ISO4014-1999(M20×8″-8.8)
5 Anchoring rod
Single-anchoring
6
rod
Double-anchoring
7
rod
0066340-200-05Y.C
8 Pin spindle
9 Retaining pin
Single-anchoring
10
rod
11 Coupling link
Double-anchoring
12
rod
13 Reducing piece
0066340-200-05Y.C
14 Pin spindle
15 Cotter pin
ISO1234-1997(0.4″×3.6″)
Reducing
16 double-anchoring
rod
Single-anchoring
17
rod
Single-anchoring
18
rod
Note:
The part numbers of anchoring rods given in Section 5.7.3.2——b “Fixed jib rear anchoring
rods” are consistent with those in the above table, so the component parts of anchoring rods
can be found by referring to the part numbers when assembling.
0066340-200-05Y.C
Combination of fixed jib rear anchoring rods is shown in the following table
Combination of fixed jib rear anchoring rods
Length of
Fixed jib
fixed jib
angle to Combination of fixed jib rear anchoring rods (between main boom to
rear
main FA-frame )
anchoring
boom
rods(ft)
SFV boom comprises main boom (S) and heavy fixed jib (FV). The main boom length
varies from 134′5″~252′7″, and the heavy fixed jib length is 19′8″. The heavy fixed jib can
be assembled in the angle of 14° or 20° to main boom. When different main boom length is
required, operator only needs to disconnect main boom pivot section from main boom head,
and then install main boom intermediate sections between them. In this way, the main
boom can be assembled to required length.
Main boom sections in this boom configuration are pinned together in the same way as that
in S boom configuration.
252′7″ long main boom with 19′8″ heavy fixed jib, overview:
G74
G41
G37
G75
G12
G15
G15
G15
G15
G15
G15
G13
G11
G70
G17
0066340-200-05Y.C
The anchoring rods of SFV boom comprises main boom anchoring rods, heavy fixed jib
front anchoring rods and heavy fixed jib rear anchoring rods. For the combination of main
boom(heavy) anchoring rods, see Section 5.7.1.3. And the combination of heavy fixed jib
anchoring rods has been given as follows.
The heavy fixed jib front anchoring rods is composed by the following component parts, and
its length is unvaried.
0066340-200-05Y.C
A view
To FA-frame
B C
0066340-200-05Y.C
Part
Description illustration
No.
1 Pin spindle
2 Retaining pin
Double anchoring
3
rod
Single anchoring
4
rod
Double anchoring
5
rod
0066340-200-05Y.C
Reducing single
6
anchoring rod
7 Pin spindle
8 Cotter pin
ISO1234-1997(0.4″×3.6″)
Reducing double-
9
anchoring rod
10 Pin spindle
Note:
The part numbers of anchoring rods given in Section 5.7.4.2——a “ Heavy fixed jib front
anchoring rods” are consistent with those in the above table, so the component parts of
anchoring rods can be found by referring to the part numbers when assembling.
0066340-200-05Y.C
The width of heavy fixed jib rear anchoring rods is 1.8″, and the diameter of pin spindle is φ1.6″..
Since the heavy fixed jib can be mounted in the angle of either 14o or 20o to main boom, the
heavy fixed jib rear anchoring rods can be combined in two ways.
The following figure shows the combination of rear anchoring rods when heavy fixed jib is
mounted in the angle of 20o to main boom.
0066340-200-05Y.C
A view
To FA-frame
B
To main boom
C
D
C B
D
0066340-200-05Y.C
Part
Description illustration
No.
1 sleeve
2 Cotter pin
ISO1234-1997(0.16″×1.2″)
3 Nut
ISO4032-1999(M20-8)
4 Bolt
ISO4014-1999(M20×8″-8.8)
5 Anchoring rod
Single-anchoring
6
rod
Double-anchoring
7
rod
0066340-200-05Y.C
8 Pin spindle
9 Retaining pin
Single-anchoring
10
rod
11 Coupling link
Double-anchoring
12
rod
13 Reducing piece
14 Pin spindle
0066340-200-05Y.C
15 Cotter pin
ISO1234-1997(0.4″×3.6″)
Reducing double
16
anchoring rod
Note:
The part numbers of anchoring rods given in Section 5.7.4.2——b “heavy fixed jib rear
anchoring rods” are consistent with those in the above table, so the component parts of
anchoring rods can be found by referring to the part numbers when assembling.
Combination of heavy fixed jib rear anchoring rods is shown in the following table
Length of
Heavy fixed
heavy fixed jib Combination of heavy fixed jib rear anchoring rods (between main
jib angle to
rear anchoring boom to FA-frame)
main boom
rods (ft)
The luffing jib, whose length varies from 68′10″~196′10″, comprises luffing jib pivot section
(G21), luffing jib head (G22) and an optional number of luffing jib intermediate sections 9′10″
(G23), 19′8″ (G24) and 29′6″ (G25, G25A) in length.
203′4″ long main boom with 196′10″ luffing jib, overview:
0066340-200-05Y.C
0066340-200-05Y.C
WA-frame 2 (G28)
WA-frame 1 (G27)
9′1″~8′8″
10′9″~12′5″
6′2″~8′8″
0066340-200-05Y.C
When different luffing jib length is required, operator only needs to disconnect luffing jib pivot
section from luffing jib head, and then install luffing jib intermediate sections between them. In this
way, the luffing jib can be assembled to required length.
Combination of luffing jib sections:
Luffing jib assembly sequence of Luffing jib assembly sequence of luffing jib
length(ft) luffing jib sections length(ft) sections
(127′11″) G21+G23+2×G25+G22
Principle for assembling luffing jib sections: when connecting jib intermediate sections,always
bolt the shorter intermediate sections first.
The luffing jib anchoring rods comprises luffing jib front anchoring rods and luffing jib rear
anchoring rods. Their lengths are respectively determined by the length of luffing jib and length of
main boom. The width of luffing jib front anchoring rods is 2″, and the diameter of pin spindle is
φ1.8″.
When main boom is 75′5″ long, and the luffing jib is 68′10″ long, the combination of the
luffing jib front anchoring rods is shown in the following figure.
0066340-200-05Y.C
0066340-200-05Y.C
1 Cotter pin
ISO1234-1997(0.24″×3.2″)
2 Pin spindle
3 Anchoring rod
4 Pin spindle
5 Coupling link
6 Cotter pin
ISO1234-1997(0.4″×3.6″)
7 Pin spindle
Double-anchoring
8
rod
0066340-200-05Y.C
Reducing piece
9 (single)
10 Cotter pin
ISO1234-1997(0.4″×4.8″)
11 Pin spindle
Reducing piece
12
(double)
Single anchoring
13
rod
14 Coupling link
15 Pin spindle
16 Retaining pin
0066340-200-05Y.C
Double-anchoring
17
rod
Single anchoring
18
rod
Single anchoring
19
rod
Single anchoring
20
rod
Double-anchoring
21
rod
Single anchoring
22
rod
Double-anchoring
23
rod
0066340-200-05Y.C
Single anchoring
24
rod
Double-anchoring
25
rod
Single anchoring
26
rod
Note:
The part numbers of anchoring rods given in Section 5.7.5.2—a “luffing jib front anchoring
rods” are consistent with those in the above table, so the component parts of anchoring rods
can be found by referring to the part number when assembling.
1 Retaining pin
Double
2
anchoring rod
3 Pin spindle
4 Coupling link
5 Cotter pin
ISO1234-1997(0.4″×3.6″)
6 Pin spindle
0066340-200-05Y.C
Single
7
anchoring rod
Reducing
8
piece(single)
9 Pin spindle
10 Cotter pin
ISO1234-1997(0.4″×4.8″)
Reducing
11
piece(double)
Single
12
anchoring rod
0066340-200-05Y.C
13
Coupling link
Single
14
anchoring rod
Single
15
anchoring rod
Single
16
anchoring rod
Double
17
anchoring rod
0066340-200-05Y.C
Note:
The part numbers of anchoring rods given in Section 5.7.5.2—b “ luffing jib rear anchoring
rods” are consistent with those in the above table, so the component parts of anchoring rods
can be found by referring to the part numbers when assembling.
0066340-200-05Y.C
Note:
Before assembly or dismantling, set the “Boom configuration” switch to “main boom”
position.
b) Choose appropriate load hook and rope reeving for load to be lifted;
d) Make sure that an auxiliary crane is available and operating personnel get full prepared
and qualified for operation;
Caution:
1. After the “operating mode” is changed to “assembly mode”, all safety devices built in the
crane will be deactivated, the assembly, dismantling of the machine must be therefore
carried out with utmost care.
2. For assembly work on the crane, a safety assembly working platform must be used.
Improvisations are prohibited. Otherwise, there is a danger of falling down.
3. Any other boom configurations and anchoring rods combination that have not been
stipulated in the operating manual are prohibited.
5. If the main boom head is lifted by an auxiliary crane, at least two pieces of lifting chain with a
breaking force≥33100Ib should be used.
8. The use of squared timbers or pad block to support the chord in the middle position or web
members is prohibited; otherwise the boom sections will be damaged.
0066340-200-05Y.C
After unloading the basic machine, unload each boom section from the transport vehicle via
mounting cylinder on A-frame, and then attach such boom components as main boom head,
main boom intermediate sections according to actual working requirement.
a) After unloading the main boom pivot section from the transport vehicle, connect it to the
mounting cylinder on A-frame with two lifting chains.
b) - Derrick the A-frame up or down to proper position by moving the right control
lever(27) to left or right
- turn the “self assembly& dismantling” switch (55) on the right control panel to the right
- adjust the mounting cylinder on A-frame by pushing the right control lever(27)
forwards or backwards;
c) Align the main boom pivot section with connecting points on slewing table.
0066340-200-05Y.C
d) Activate the “pivot section bolting cylinder” switch on auxiliary remote control box to
extend the pivot section bolting cylinder, and then fit the locking plate. In this way, the
main boom pivot section is pinned on.
a) Preassemble main boom sections according to Section 5.7.1“heavy duty boom”. For
detailed operation, refer to following methods:
— Pin main boom intermediate sections of 3m, 6m or 9m to each other in the following
sequence:
1. Position two intermediate sections to be pinned in such a way that the connection
holes in one intermediate section are precisely aligned with those in the other
intermediate section (see following figure).
2. Join them with double tapered pins (1) and secure on both sides with retaining
springs (2).
— Pin main boom head to the assembled intermediate sections in the following
sequence:
1. Position the assembled intermediate section in such a way that the upper
connecting holes in it are aligned with those in the main boom head.
2. Join the upper connecting holes with double tapered pins (3) and secure with
retaining springs (2)
Part
Description illustration
No.
Double tapered
1
pin
2 Retaining spring
Double tapered
3
pin
0066340-200-05Y.C
1. Slowly drive the basic machine with main boom pivot section attached up to the
preassembled main boom.
2. Adjust the A-frame position by moving the right control lever (27) left or right to
make the upper connecting holes in adjacent main boom intermediate section
are aligned with the connecting holes in pivot section.
3. Join the upper connecting holes with double tapered pins (1) and secure
properly on both sides with retaining springs (2).
4. Adjust the mounting cylinder on A-frame until the lower connection holes in pivot
section are aligned with those in adjacent main boom intermediate section.
5. Join the lower connecting holes with double tapered pins (1) and secure on both
sides with retaining springs (2).
6. Disconnect the main boom pivot section from mounting cylinder on A-frame by
removing the lifting chain.
0066340-200-05Y.C
Part
Description illustration
No.
Double tapered
1
pin
2 Retaining spring
Warning:
1. It is prohibited to put hand or fingers into the connecting hole during installation.
2. While the connecting pin is being removed, no person is allowed to stand beneath or in
the boom.
Connect the anchoring rods on A-frame and on main boom pivot section together, and
then attach anchoring rods of main boom intermediate section and anchoring rods of
main boom head to each other by pin spindles and secure them with retaining pins. (The
arrangement and combination of main boom anchoring rods are specified in Section
5.7.1.3).
1) Move the right control lever(27) to the left to wind the derricking rope until the main
boom head is raised to a proper position a littler higher than the load hook, and then
position the load hook directly under the main boom head.
2) Turn the switch (60) to right or push down the “reeving winch” on the remote control
box to unwind the rope of reeving winch until it approach the load hook. Reeve the
rope of reeving winch in the reverse direction between the load hook and the rope
pulleys on main boom head and then pull it to tail-end of main boom (for the details,
please refer to Section 4.5.3.3 “Operation of reeving winch”).
3) Push the right control lever (27) forwards to unwind hoisting rope for winch 1 until it
reaches the tail-end of main boom. Attach rope end point of reeving winch to hoisting
rope for winch 1 with rope lock (see following figure).
4) Turn the switch (60) to left or push the “reeving winch” on the remote control box up
to wind the rope of reeving winch, simultaneously unwind the hoisting rope for winch
1. Guided by the rope of reeving winch, the hoisting rope for winch 1 will then reeve
between the rope pulley and load hook. After that, stop operation on winch 1 and
reeving winch, detach the rope lock. Finally, spool up the reeve winch to wind the
rope end point onto the reeving winch.
0066340-200-05Y.C
Rope pulleysⅠ
Rope pulleysⅡ
Hoisting rope reeving method for 260t load hook, for example, will be detailed here:
-- According to the method stipulated in Section 4.6.1.1 “hoisting rope reeving for winch 1”,
reeve the rope of reeving rope in the reverse direction between rope pulleys III and rope
pulleys II on main boom head and then through the rope pulleys I.
-- Attach rope end point of reeving winch to hoisting rope for winch 1 with rope lock.
-- Wind the rope of reeving winch and simultaneously unwind the hoisting rope for winch 1.
Guided by the rope of reeving winch, the hoisting rope for winch 1 will then reeve in desired
direction between the rope pulleys and load hook (see following figures.).
0066340-200-05Y.C
Rope reeving plans (the hoisting rope is led by rope of reeving winch):
Rope pulleysⅠ
Hoisting winch 1
Rope pulleys Ⅱ
Rope pulleys Ⅲ
Reeving winch
Rope pulleysⅠ
Hoisting winch 1
Rope pulleys Ⅱ
Rope pulleys Ⅲ
Reeving winch
Rope pulleysⅠ
Hoisting winch 1
Rope pulleys Ⅱ
Rope pulleys Ⅲ
Reeving winch
Winch 1
573300 Ib load hook(rope reeving:14)
0066340-200-05Y.C
Rope pulleysⅠ
Hoisting winch 1
Rope pulleys Ⅱ
Rope pulleys Ⅲ
Reeving winch
Winch 1
Rope pulleysⅠ
Hoisting winch 1
Rope pulleys Ⅱ
Rope pulleys Ⅲ
Reeving winch
Caution:
1. Working personnel who guides the wire rope should take great care to prevent against falling
down when walking on the boom frame; otherwise, serious accident may occur.
2. The rope unwinding speed from winch 1 must be faster than rope-winding speed on reeving
winch.
0066340-200-05Y.C
Note:
The following figure shows the connected electrical parts on main boom. Before erecting the
boom, make sure that all electrical lines are connected and safety measures are checked.
0066340-200-05Y.C
202 Cable drum 1 main boom pivot section(if luffing jib is used)
Control box for Load Moment Main boom head(if luffing jib is used)
209
Limit on luffing jib
210 Cable drum 3 Main boom head(if luffing jib or fixed jib is used)
211 Hoisting limit switch weight Connected with hoisting rope on main boom head
Insert the cable plug of X15 on main boom pivot section into the X15 socket at the front of
slewing table. If a luffing winch is fitted on the main boom, insert the cable plug of X16
into the X16 socket at the front of slewing table.
Unplug the cable plug of cable drum 2, pull the cable plug along the main boom and then
insert it into the “lead to junction box” socket on main boom junction box. Establish the
0066340-200-05Y.C
electrical connections from the junction box on the main boom head to associated
components respectively.
The main boom junction box, installed on main boom head, has 9 input and output
sockets in total, including:
— “lead to junction box” sockets (12-hole) on the left side, which is used to establish a
connection to main boom cable drum 2
Other sockets at the bottom of the junction box, from the left to right, are respectively:
— “Hoisting limit switch for H1” socket (3-pin), which is used to a establish connection to
hoisting limit switch for H 1 connected to main boom head;
— Insert the two cable plugs of main boom warming lamps (2) into the two “warning lamp”
sockets respectively in the junction box
— insert the cable plug of hoisting limiter for H1 into the “hoisting limit switch for H1” socket in
the junction box.
— insert the cable plug of hoisting limiter for H2 into the” hoisting limit switch for H2” socket in
the junction box.
— insert the cable plug of anemometer into the “anemometer” socket in the junction box
Caution:
See the Installation Guide& User’s Manual for Load Moment Limiter.
Set the Master Lighting Switch 39 (see Section 4.1.4) to the second position, and press
“warning lamp on/off” switch 41 at the same time, check that the warning lamp lights up..
Rotate the vane of anemometer to check whether the wind velocity shown on the display in
the operator’s cab is normal.
0066340-200-05Y.C
Support and hold the hoisting limit switch weight for H1 to ensure that the switch is
triggered, and then check that the Icon “upper limit switch on H1” on the screen will flash
and the buzzer will sound.
d) Check hoisting limit switch for H2(when the tip boom is used)
Support and hold the hoisting limit switch weight for H2 to ensure that the switch is
triggered, and then check that the Icon “upper limit switch on H2” on the screen will flash
and the buzzer will sound.
c) Select appropriate boom configurations according to the load to be lifted and the
load capacity charts; ensure that boom sections have been connected and secured;
d) All limit switches has been correctly fitted and are fully operational;
f) The hoisting rope has been correctly placed in the rope pulleys and prevented from
jumping out (from rope groove) using rope guard tube;
i) In winter, the main boom, fixed jib and associated components (limit switches, rope
drums, warning light, anemometer etc.) must be kept free of ice and snow.
Danger:
Incorrectly fitted or faulty limit switches and falling parts (pins, retaining pins, ice etc.)
can cause injury.
a) Move the right control lever (27) to the left to spool derricking winch up, and the main
boom anchoring rods will be tensioned gradually.
Note: During the erecting process, to prevent the load hook from being dragged on the
ground, while moving the right control lever (27) in 45° direction, press the
“simultaneously operation ” button(29)at the same time until main boom reaches 30°
position. When the main boom reaches 30° position, the “assembly mode” will
automatically be changed into “operating mode”. Then return the right control lever (27) to
0066340-200-05Y.C
neutral position.
b) Continue to move the right control lever (27) to left until the main boom is erected to
required position.
Caution:
1. The main boom angle can be changed between 0° to 85°. When main boom is
raised to 80°, acoustic warning will be given out, but main boom can still be
derricked up. And when main boom is raised to 83°, the movement of derricking
boom up will be switched off automatically along with warning being sent out, but
the main boom can still be derricked up by pressing the “bypass key button”(54).
However, when main boom is raised to 85° position, the movement of derricking
0066340-200-05Y.C
boom up will be switched off automatically along with warning being sent out.
Under this condition, even though “bypass key button” is pressed, the main boom
can not be raised any further.
2. Always monitor the wire rope in process of erecting main boom to make sure that
the wire rope is kept in the rope groove all the time.
3. The boom-raising movement should be performed slowly and stably. And during
the operation, the crane operator must observe the data shown on the display,
while other workers must observe the surrounding areas for potential dangers.
5. Working radius stipulated in the Load Capacity Charts should be adhered to, even
if no load is attached on the load hook! Non-observance of it is likely to cause the
crane turnover.
a) Move the right control lever (27) to the right to reel derricking winch off, and then the
main boom will be lowered gradually. When the main boom is lowered to 30° position,
return the control lever (27) to neutral position.
b) Push the right control lever(27) forwards to reel off hoisting winch 1 to lower stably the
load hook on the ground;
c) Move the right control lever (27) to the right until the main boom head comes into contact
with the ground. Return the right control lever (27) to neutral position.
Caution:
1. In the process of lowering main boom, the hoisting winch 1 must be reeled off to
avoid the hook’s collision with the pulley head.
3. The boom-lowering movement should be performed slowly and stably. And during the
operation, the crane operator must observe the data shown on the display, while
other workers must observe the surrounding areas for potential dangers.
4. To prevent the crane from overturning, the counterweight must be removed prior to
the dismantling of main boom pivot section.
0066340-200-05Y.C
a) After the anchoring rods are lowered down on the anchoring rod supports on the
relevant boom sections, remove the pin spindles from anchoring rods, and then
secure them on anchoring rod supports with pin spindles for transportation.
Note:
2. Warnings and safety precautions for assembly should be followed during assembly
operation.
Caution:
1. Before operation, turn the “Boom configuration” switch to “luffing jib” position.
2. The luffing jib can be derricked up or down by hoisting winch 1 or luffing winch.:
By hoisting winch 1: push the right control lever (27) forwards or backwards- derrick the jib
down or up.
By luffing winch: move the right control lever(27) to left or right- derricking the jib up or
down.
Only when the “Boom configuration” switch is turned to “main boom” position, can the main
boom be derricked up or down by pushing the right control lever (27) forwards or backwards.
In other words, if the crane operator wants to derrick main boom or luffing jib up/down, he
should first turn the “Boom configuration” switch to “main boom” or “luffing jib” position.
b) Choose the correct load hook and rope reevings for the load to be lifted;
e) The safe load indicator system of Load Moment Limiter is set according to the data given
0066340-200-05Y.C
f) Make sure that an auxiliary crane is available and operating personnel get full prepared
and qualified for operation;
Caution:
1. After the “operating mode” is changed to “assembly mode”, all safety device built in the
crane will be deactivated, the assembly, dismantling of the machine should therefore be
carried out with utmost care.
2. For assembly work on the crane, a safety assembly working platform should be used.
Improvisations are prohibited. Otherwise, there is a danger of falling down.
3. Any other boom configurations and anchoring rod combination that have not been
stipulated in the operating manual are prohibited.
5. If the main boom head is lifted by an auxiliary crane, at least two pieces of lifting chain
with a breaking force≥15t should be used.
7. The use of squared timbers or pad block to support the chord in the middle position or
web members is prohibited; otherwise the boom sections will be damage.
During transportation, the luffing jib pivot section (G21), WA-frame 1 (G27) and WA-frame 2
(G28) as well as tilting-back support accumulator cylinder (G73) of WA-frame 1 are
assembled together. See following diagram.
0066340-200-05Y.C
b) - Lift the luffing jib pivot section (together with WA-frames 1 and 2) with an auxiliary
crane and swing to main boom head.
- Attach the luffing jib pivot section to the main boom head from above.
- Continue lowering the luffing jib pivot piece until it can be pinned to main boom head.
- Pin the luffing jib pivot piece to main boom head with pin spindles (24) and secure with
bolts (21), locking plates (23), retaining springs (25) and washer (26). (See following
figure.)
A view
G27—WA-frame 1 G28—WA-frame 2
0066340-200-05Y.C
Part
Description Illustrations
No.
17 Locking plate
18 Bolt
ISO4017-1999(M12×1.4″-8.8)
19 Washer
(0.48″)
20 Pin spindle
21 Bolt
ISO4017-1999(M16×2.2″-8.8)
22 Washer
(0.64″)
0066340-200-05Y.C
23 Locking plate
24 Pin spindle
25 Retaining spring
G24
G23
G21
G22
G25
G24— 6m luffing jib intermediate section G25—9m luffing jib intermediate section
Connecting parts of luffing jib section have been shown in the following table:
Part
Description Illustration
No.
Double
1
tapered pin
Retaining
2
spring
After the attachment of luffing jib is completed, preassemble partial anchoring rods to WA-frame
2(for the part number appear in the following figure, please refer to Section 5.7.5.2-b “luffing jib rear
anchoring rods”) and pin adjacent anchoring rods on the jib intermediate sections to one another.
A
0066340-200-05Y.C
A view
11 8 7 4 2
2 14 2 16 2 13 12 To WA-frame 2
C
B
0066340-200-05Y.C
C
B
0066340-200-05Y.C
A B
2 4
1 3
Part
Description Illustration
No.
1 Pin spindle
2 Cotter pin
3 Pin spindle
0066340-200-05Y.C
4 Cotter pin
5 Pin spindle
6 Cotter pin
7 Pin spindle
8 Cotter pin
1) Turn the switch (60) to right or push down the “reeving winch” on the remote control
box to unwind the rope of reeving winch;
2) Reeve the rope of reeving winch in the reverse direction between the load hook and
the rope pulley on luffing jib head and then pull it to the tail-end of main boom pivot
section. Attach rope end point of reeving winch to rope for hoisting winch 1(or luffing
rope) with rope lock.
3) Turn the switch (60) to left or push the “reeving winch” on the remote control box up
to wind the rope of reeving winch, while simultaneously moving the right control
lever (27) forwards to unwind the rope for hoisting winch 1(if luffing winch is used to
raise or lower the luffing jib, move the right control lever (27) to right to unwind the
luffing rope).
0066340-200-05Y.C
Caution:
1. Before operation, the operator must choose the correct boom configuration by turning “boom
configuration” switch to required position.
2. Working personnel who guides the wire rope should take great care to prevent against falling
down when walking on the boom frame; otherwise, serious accident may occur.
3. The rope unwinding speed from winch 1 must be faster than rope winding speed on reeving
winch.
4) Guided by the rope of reeving winch, the rope for hoisting winch 1(or luffing rope) will
then reach luffing jib head. When the rope for hosting winch 1(or luffing rope) is
unwound long enough, reeve it between the rope pulley on luffing jib head and load
hook according to the method given in Section 4.6.6 “luffing rope reeving”.
5 5
G27
2
2
3
4
1 3
1
G28
W1
Winch 1
G27—WA-frame 1 G28—WA-frame 2
f) - Connect required main boom anchoring rods according to assembled main boom
length (See the arrangement and combination of anchoring rods in Section 5.7.1.3 );
- lift the WA-frame 2 and swing it 90° by an auxiliary crane, and push the right control
lever(27) forwards at the same time to unwind the rope from winch 1(if luffing winch is
used to raise or lower the luffing jib, move the right control lever(27) to right to unwind
luffing rope from luffing winch).
- Attach the luffing jib rear anchoring rods (see Section 5.7.5.2-b “lufffing jib rear
anchoring rods”).
0066340-200-05Y.C
- Connect the other end of tilting-back support of WA-frame 2 to main boom head with
a pin spindle(1) and secure it with a cotter pin (2), then remove the pins on WA-frame
2.
Connecting parts
Part
Description Illustration
No.
1 Pin spindle
2 Cotter pin
0066340-200-05Y.C
- push the right control lever(27) backwards to wind the rope onto winch 1(if luffing
winch is used to raise or lower the luffing jib, move the right control lever(27) to left
to wind luffing rope onto luffing winch) until the luffing jib rear anchoring rod is
tensioned slightly.
Connecting parts
Part
Description Illustration
No.
1 Locking bolt
(M12)
2 Pin spindle
0066340-200-05Y.C
3 Retaining pin
h) - Remove the attachment chain that ties the WA-frame 1 to luffing jib.
- push the right control lever(27) backwards to wind the rope onto winch 1(if luffing winch is
used to raise or lower the luffing jib, move the right control lever(27) to left to wind luffing
rope onto luffing winch) so as to raise the WA-frame 1 to proper position.
- select appropriate length of front anchoring rods according to luffing jib length and then
connect the front anchoring rods with WA-frame 1 (see Section 5.7.5.2-a “luffing jib front
anchoring rods” ).
0066340-200-05Y.C
i. Connect the tilting-back support accumulator cylinder of WA-frame 1 to main boom head as
shown in following figure.
j) - Turn the switch (60) on right control panel (4) to right or push down the “reeving winch”
on the remote control box to unwind the rope of reeving winch.
- Reeve the rope of reeving winch through the rope pulley on luffing jib head and then
pull it back to the tail-end of main boom pivot section.
- Return the switch (60) or the “reeving winch” on the remote control box to neutral
position to stop unwinding rope.
- push the left control lever(17) forwards to unwind the hoisting rope of winch 2 to
tail-end of main boom pivot section, and then attach the rope of reeving winch to
hoisting rope of winch 2 with rope lock.
- Turn the switch (60) to left or push the “reeving winch” on the remote control box up to
wind the rope of reeving winch, while simultaneously unwinding the hoisting rope for
winch 2. Guided by the rope of reeving winch, the hoisting rope for winch 2 will then
reach luffing jib head.
0066340-200-05Y.C
Note:
The following figure shows the connected electrical parts on main boom pivot section. Before
erecting the boom, make sure that all electrical lines are connected and safety measures are
checked.
Layout of electrical parts between main boom head and luffing jib pivot section
Description of electrical parts between main boom head and luffing jib pivot section
215 Hoisting limit switch weight Connected with hoisting rope on luffing jib head
Connect all electrical parts on main boom according to electrics connecting requirement;
Establish electrical connection from the “titling-back support of luffing jib” socket on the
main boom junction box to the “Tilting-back support” switch on tilting-back support of
luffing jib.
0066340-200-05Y.C
1) insert the one-end cable plug of cable drum 3 into “to cable drum ” socket on main
boom junction box, meanwhile, pull the other-end cable plug of cable drum 3 to luffing
jib head and insert it into “lead to junction box” socket on luffing jib junction box.
The luffing jib junction box, installed on luffing jib head, has 5 input and output sockets in total,
0066340-200-05Y.C
including:
— “Lead to junction box” socket (12-hole) on the left side, used to establish connection to
cable drum 3 on main boom head.
Other sockets at the bottom of the junction box, from the left to right, are respectively:
— “Warning lamp” socket (2-hole), used to establish connection to warning lamp on luffing
jib head
— “Warning lamp” socket (2-hole), used to establish connection to warning lamp on luffing
jib head
— “Hoisting limit switch for H1” socket (3-pin), used to establish connection to hoisting limit
switch for H 1 connected to luffing jib head.
Insert the cable plug of cable drum on main boom pivot section into the “lead to junction box”
socket on main boom junction box.
Insert the two cable plugs of luffing jib warming lamps respectively into the two “warning
lamp” sockets on the luffing jib junction box.
Inset the cable plug of hoisting limiter for H2 into the “hoisting limit switch for H1” socket on
luffing jib junction box.
Insert the cable plug of anemometer on luffing jib head into the “anemometer” socket on
luffing jib junction box.
Insert the cable plug of titling-back support switch into the “tilting-back support of luffing jib”
socket on main boom junction box.
Caution:
See the Installation Guide& User’s Manual for Load Moment Limiter.
Set the Master Lighting Switch 39 (see Section 4.1.4) to the second position, and press
“warning lamp on/off” Switch 41 the same time to check that the warning lamp lights up.
Rotate the vane of anemometer to check whether the wind velocity shown on the display in
0066340-200-05Y.C
Support and hold the hoisting limit switch weight for H2 to ensure that the switch is
triggered, and then check that the icon “upper limit switch on H2” on the screen will flash
and the buzzer will sound.
5.9.5.1 Requirements
b) The limit switch control lever has been checked for smooth movement.
g) Operate the hoisting winch, and adjust the hoisting limit switch on luffing jib head manually.
Requirement for this operation: the hoisting movement of hoisting winch should be
stopped when the upper limit has been exceeded, and icon “upper limit switch” on the
screen will flash.
b) Select appropriate boom configurations according to the load to be lifted and the load
capacity chart; ensure that boom sections have been connected and secured;
c) All limit switches has been correctly fitted and are fully operational;
e) The hoisting rope has been correctly placed in the rope pulleys and prevented from
jumping out (from rope groove) using rope guard tube;
h) In winter, the main boom, fixed jib and associated components (limit switches, rope
drums, warning light, anemometer etc.) must be kept free of ice and snow.
Danger:
1. Incorrectly fitted or faulty limit switches and falling parts (pins, retaining pins, ice etc.) can cause
0066340-200-05Y.C
injury.
2. Before erecting the boom, check that the tilting-back support for luffing jib is installed correctly.
And ensure the spherical ends of tilting-back support move smoothly in the two guides on luffing
jib pivot section when luffing jib is raised to the limit position. Otherwise, the luffing jib is liable to
tilt backwards if the tilting-back support is not fixed properly.
a) Set the “luffing jib” operating mode in Load moment limiter in accordance with boom
configurations.
Caution:
Performing slewing motion while the boom is erected from the ground is prohibited.
--slowly raise the main boom to a proper position by moving right control lever (27) to the
left;
--unwound wipe rope off winch 1 by pushing right control lever (27) forwards
-- Slowly raise main boom by moving the right control lever (27) to the left;
--after main boom is raised to a proper position, turn “boom configuration” switch to
“Luffing jib” position;
--unwind luffing rope off luffing winch properly through moving right control lever (27) to
the right.
Carry out the movements “Raise main boom” and “unwind luffing rope” repeatedly and
ensure that the luffing jib head is running with the running wheels on the ground. when the
angle between main boom and luffing jib reaches 90°, move right control lever (27) to
neutral position to stop erecting.
Note:
1. The total weight of luffing jib should be loaded on the running wheel.
3. In no circumstances can the angle between the main boom and luffing jib be
smaller than 90°. Otherwise, the luffing jib head and luffing jib may be damaged.
c) - Turn the “boom configuration” switch to “main boom” position, and then move right
control lever (27) to the left to raise the boom. When luffing jib head is lifted to a proper
position, place the selected load hook under the luffing jib head.
- At this time, turn the “reeving winch” rotary switch (60) on the right control panel (4) to
the right, or push the “reeving winch control” switch on auxiliary remote control box
downwards, to unwind the rope of reeving winch and reeve it in the reverse direction
between rope pulleys on luffing jib head and load hook, finally attach it to hoisting rope
with rope lock.
- After that, turn the switch (60) to the left, or push “reeving winch” switch down, to spool
up reeving winch. At this moment, the hoisting rope, under the guidance of rope of
reeving winch, will be reeved between the rope pulleys on luffing jib head and load hook,
and the rope end point is fixed on the luffing jib head or load hook.
d) Turn the “boom configuration” switch to “main boom” position, and then move right control
lever (27) to the left to raise main boom, at the same time push the left control lever (17)
forwards to unwind the wire rope off the winch 2 to make sure that the load hook will not
be dragged on the ground. After main boom is raised to the required position, return the
left and right control levers (17, 27) to neutral position to make main boom and load hook
stop moving.
Danger:
1. In the erecting process, when main boom is raised to 65° position, the
0066340-200-05Y.C
2. To prevent the luffing jib front anchoring rods from swinging to and fro, the luffing
jib should be erected at constant speed slowly.
e) Turn the “Boom configuration” switch to “luffing jib” position, and then push right control
lever (27) backwards to spool up winch 1 so as to raise the luffing jib. (if luffing jib is
raised/lowered by luffing winch, move right control lever (27) to the left to spool up luffing
winch to raise luffing jib.) Meanwhile, push the left control lever (17) forwards to unwind
the wire rope off the winch 2 to prevent the hook block from being dragged on the ground.
After luffing jib is erected to the working position, return the left and right control levers (17,
27) to neutral position to make luffing jib and load hook stop moving.
f) Push left control lever (17) backwards to spool up winch 2 until the load hook is lifted.
0066340-200-05Y.C
Caution:
1. When main boom angle is 85°, the luffing jib angle can be adjusted from 15° to 75°.
2. When main boom angle is 75°, the luffing jib angle can be adjusted from 15° to 65°.
3. When main boom angle is 65°, the luffing jib angle can be adjusted from 15° to 55°.
4. When boom angle varies from 65°to 75°or 75°to 85°, we should determine the
corresponding smaller value in the chart as the rated lifting capacity. In order to give full
play to the crane’s performance, please operate the crane under the operating
conditions with three prescribed boom angles.
5. Under crane operation with main boom and luffing jib (with main boom angle of 85°):
when luffing jib angle exceeds 60°, the luffing jib with a load should not be
raised/lowered at high speed. And the load should be the min. lifting capacity under this
boom configuration; otherwise the luffing jib is liable to overturning. Before the load is
detached from the hook, lower the luffing jib to a position less than 60° by the pulling
force of load.
a) Push left control lever (17) forwards to reel off hoisting winch 2 so as to lower the load
hook. After the load hook is lowered on the ground, it must be moved away from the
position where the boom will lowered;
b) Push right control lever (27) forwards to operate winch 1 in the lowering direction to lower
luffing jib (or move right control lever (27) to the right to lower luffing jib If luffing jib is
lowered with luffing winch.) when the angle between luffing jib and main boom reaches
90°, return right control lever (27) to neutral position to make luffing jib stop moving.
c) Turn the “boom configuration” switch to “main boom” position, and then move right control
lever (27) to the right to lower main boom until the luffing jib head touches the ground with
the running wheels.
Caution:
1. In the lowering process, when main boom is lowered to 65° position, the “operating
mode” must be changed to “assembly mode”.
2. In the process of lowering main boom, the winch 1 must be reeled off to avoid the
hook’s collision with the pulley head.
4. The boom-lowering movement should be performed slowly and stably. And during
the operation, the crane operator must observe the data shown on the display, while
other workers must observe the surrounding areas for potential dangers.
0066340-200-05Y.C
d) If winch 1 is used to raise/lower luffing jib, turn the “boom configuration” switch to “main
boom” position, and then push the right control lever (27) backwards to spool up winch 1.
And then move the right control lever (27) to the right to lower main boom. Carry out the
movements “Spool up winch 1” and “Lower main boom” repeatedly to ensure that the
luffing jib head is running with the running wheels.
(if luffing winch is used to raise/lower luffing jib, turn the “boom configuration” switch to
“luffing jib” position, and then move right control lever(27) to the right to lower luffing jib.
After that, turn the “boom configuration” switch to “main boom” position, and then push left
control lever(17) backwards to spool up winch 2. when main boom and luffing jib are
lowered on the ground, return right control lever (27) to neutral position.
Caution:
3. To prevent the wire rope from being damaged due to crush, it should be guided
by a person.
4. In the process of lowering the boom, make anchoring rods of luffing jib hang
down a little.
Note:
b) Push right control lever (27) forwards to reel off winch 1 (or move right control lever to the
right to reel off luffing winch when luffing jib is lowered with luffing winch). After WA-frame 1
is lowered forwards to proper position, return right control lever(27) to neutral position. At
this moment, separate the anchoring rods of WA-frame 1 from those of luffing jib. And then
lower the WA-frame 1 on the luffing jib and secure them with slings.
0066340-200-05Y.C
c) push right control lever (27) backwards slightly to spool up winch 1 (or move right control
lever to the left to spool up luffing winch when luffing jib is controlled by luffing winch) until
the luffing jib rear anchoring rods is tensioned. At this moment, remove the positioning
pin for tilting-back support of WA-frame 2. After that, push right control lever (27)
forwards to reel off winch 1 (or move right control lever to the right to reel off luffing winch).
Lower WA-frame 2 backwards until the tilting-back support are retracted completely, and
then insert the positioning pin.
Caution:
1. In order to avoid breaking mounting sling, the force should not be too large when
wind luffing rope to tighten the luffing jib rear anchoring rods. Otherwise,
accident will occur.
2. The end of tilting-back support should slide in guiding rails provided for that
purpose.
d) Dismantle the tilting-back support of WA-frame 2 with the help of auxiliary crane ,and then
disconnect luffing jib rear anchoring rods from WA-frame 2;
Note:
When wind luffing wire rope, the mounting sling should not bear any load to prevent it
from being broken.
e) Push right control lever (27) forwards to reel off winch 1 (or move right control lever (27) to
the right to reel off luffing winch when it is controlled by luffing winch), slowly put WA-frame
2 on the WA-frame 1 with the help of auxiliary crane.
Danger:
1. At this time, WA-frame 2 is lowered down with the help of auxiliary crane, not the
hoisting wire rope.
f) Retract the rope of winch 1. push right control lever (27) backwards to wind the rope on the
winch 1 (or move right control lever to the left to spool up luffing winch when luffing jib is
raised or lowered by luffing winch) and fixed it on the winch.
g) Spilt luffing jib sections one by one, leaving the luffing jib pivot section assembled.
h) Detach the luffing jib pivot section (together with WA-frames 1 and 2) from the main boom
0066340-200-05Y.C
head.
Caution:
All crane movements should be carried out smoothly, and all safety precautions
should be followed, otherwise accident may occur.
0066340-200-05Y.C
The SL boom comprises main boom sections and luffing jib sections. Its first 73 long boom is
composed of main boom sections, and the second part of it is composed of luffing jib sections.
The first part of it is connected to the second part by 4 reducing section (G29). The assembly
sequence of boom sections for both parts of it and the arrangement and combination of
anchoring rods as well as safety precautions have detailed in Section 5.7.2 “Light duty boom”.
The connection of 4m reducing section to main boom section and to luffing jib section has
been shown in the following figure.
1 2 3 4
0066340-200-05Y.C
Connecting parts
Double
1
tapered pin
Retaining
2
spring
Double
3
tapered pin
Retaining
4
spring
Connecting electrics
Insert the cable plug of X15 on main boom pivot section into the X15 socket at the front of
slewing table.
Insert the cable plug of cable drum 2 into “lead to junction box” socket on luffing jib junction
box.
For electrical connections to other parts, please see the “Connecting electrics to luffing jib” in
Section 5.9.3.1.
Note:
For erection and lowering of light duty boom as well as safety precautions, please
refer to Section 5.8.4 “Erecting main boom” and Section 5.8.5.1 “Setting down main
boom”
0066340-200-05Y.C
5.11 Assembly and dismantling of main boom with fixed jib (SF)
5.11.1 Preparations
e) The safe load indicator system of Load Moment Limiter is set according to the data given
in the load capacity charts;
g) Choose the correct load hook and rope reeving for the load to be lifted.
Danger:
1. After the “operating mode” is changed to “assembly mode”, all safety device built
in the crane will be deactivated, the assembly, dismantling of the machine
should therefore be carried out with utmost care.
2. Any assembly work on crane should be carried out on safety working ground;
otherwise there is a risk of accident.
Caution:
Before operating the crane, set the “Boom configuration” switch to “fixed jib” position.
During transportation, the fixed jib pivot section (G31) and FA-frame (G37) are assembled
together. See following diagram.
0066340-200-05Y.C
G37
G31
a) Assemble required main boom sections in accordance with Section 5.7.1 “ heavy duty
boom”;
b) - Raise the fixed jib pivot section (together with FA-frame) with an auxiliary crane and
swing to main boom head.
- Attach the fixed jib pivot section to the main boom head from above
- Continue lowering the fixed jib pivot piece until it can be pinned to main boom head.
- Pin the fixed jib pivot piece to main boom head with pin spindles (2) and secure with
bolts (5), locking plates (3), retaining springs (1) and washer (4). (See following
figure.)
0066340-200-05Y.C
2
3
4
5
Connecting parts connect fixed jib pivot section to main boom head
Retaining
1
spring
2 Pin spindle
3 Locking plate
4 Washer
(0.64″)
5 Bolt
ISO4017-1999 (M16×2.2″-8.8)
0066340-200-05Y.C
G32
G33
G31
Double
1
tapered pin
Retaining
2
spring
d) - Connect required main boom anchoring rods according to assembled main boom length
(See Section 5.7.1.3 “combination of main boom anchoring rods”).
- Preassemble partial fixed jib rear anchoring rods to FA-frame (see following A-view, for
the part number appear in the following figure, please refer to Section 5.7.3.2-b “fixed jib
rear anchoring rods”)
- Connect required front anchoring rods according to fixed jib length (for the arrangement
and combination of front anchoring rods, please refer to section 5.7.3.2—a “fixed jib front
anchoring rod”).
0066340-200-05Y.C
e) - Assemble the outer pipe of one end of front tilting-back support (G74) and rear
tilting-back support (G75) to FA-frame (G37), and secure them with cotter pin (1).
- lift FA-frame (G37) with an auxiliary crane until the fixed jib front anchoring rods is
tensioned slightly.
- attach the inner pipe of the other end of front tilting-back support (G74) to fixed jib pivot
section with pin spindle (2) and secure with cotter pin (3).
- attach required fixed jib rear anchoring rods (see Section 5.7.3.2-b “fixed jib rear
anchoring rods”).
0066340-200-05Y.C
C A
B
0066340-200-05Y.C
Connecting parts
1 Cotter pin
ISO1234-1997(0.32″×2.4″)
2 Pin spindle
3 Cotter pin
ISO1234-1997(0.32″×2.4″)
Double tapered
4
pin
5 Retaining spring
f) - Turn the switch (60) on right control panel (4) to right or push down the “reeving winch”
on the remote control box to unwind the rope of reeving winch.
- Reeve the rope of reeving winch through the rope pulley on fixed jib head and then pull
it back to the tail-end of main boom pivot section.
- Return the switch (60) or the “reeving winch” on the remote control box to neutral
position to stop unwinding rope.
- push the left control lever(17) forwards to unwind the hoisting rope of winch 2 to tail-end
of main boom, and then attach the rope of reeving winch to hoisting rope of winch 2 with
rope lock.
0066340-200-05Y.C
- Turn the switch (60) to left or push the “reeving winch” on the remote control box up to
wind the rope of reeving winch, simultaneously unwind the hoisting rope for winch 2.
Guided by the rope of reeving winch, the hoisting rope for winch 2 will then reach fixed jib
head.
g) Move the right control lever (27) to left to wind derricking rope onto derricking winch.
When main boom is raised to a proper position, lift the rear titling-back support of fixed jib
(G75) with an auxiliary crane, and then connect it with main boom head with pin spindle (2)
and secure with cotter pin(1).
G75
1
Connecting parts
Part
Description Illustration
No.
2 Pin spindle
3 Cotter pin
ISO1234-1997(0.32″×2.4″)
Caution:
1. Make sure that hoisting rope on fixed jib head is not exposed to crushing force.
2. Ensure that the fixed jib head is rolling forwards on the running wheel all the
time.
3. The attachment of rear tilting-back support to main boom head should be carried
out with utmost care.
h) -- Move the right control lever (27) to left to wind derricking rope onto derricking winch.
-- When main boom and fixed jib are raised to a proper position a littler higher than the
height of a load hook, position the selected load hook under the fixed jib head.
-- reeve the rope of reeving winch in reverse direction between rope pulley on fixed jib
head and load hook.
-- attach the rope end point of reeving winch to hoisting rope of winch 2 with rope lock.
-- Turn switch (60) on right control panel (4) to left or push the “reeving winch” switch on
the remote control box up to wind the rope of reeving winch. Guided by the rope of reeving
winch, the hoisting rope for winch 2 will be reeved in desired direction between the rope
pulley on fixed jib head and load hook.
0066340-200-05Y.C
0066340-200-05Y.C
Note:
The following figure shows the connected electrical parts on main boom with fixed jib. Before
erecting the boom, make sure that all electrical lines are connected and safety measures are
checked.
0066340-200-05Y.C
212 Hoisting limit switch weight Connected to hoisting rope on fixed jib head
Connect all electrical parts (except anemometer and warning lamp) on main boom
according to electrics connecting requirement
1) insert the one-end cable plug of cable drum 3 into “to cable drum ” socket on main
boom junction box, meanwhile, pull the other-end cable plug of cable drum 3 to fixed
jib head and insert it into “lead to junction box” socket on fixed jib junction box.
The fixed jib junction box, installed on fixed jib head, has 5 input and output sockets in
total, including:
— “Lead to junction box” socket (12-hole) on the left side, used to establish connection to
cable drum 3 on main boom head.
Other sockets at the bottom of the junction box, from the left to right, are respectively:
0066340-200-05Y.C
— “Warning lamp” socket (2-hole), used to establish connection to warning lamp on fixed jib
head
— “Warning lamp” socket (2-hole), used to establish connection to warning lamp on fixed jib
head
— “Hoisting limit switch for H1” socket (3-pin), used to establish connection to hoisting limit
switch for H 1 connected to fixed jib head.
Insert the cable plug of cable drum on main boom pivot section into the “lead to junction
box” socket on main boom junction box.
Insert the cable plug of fixed jib warming lamp respectively into “warning lamp” sockets
on the fixed jib junction box.
Inset the cable plug of hoisting limiter for H2 into the “hoisting limit switch for H1” socket
on fixed jib junction box.
Insert the cable plug of anemometer on fixed jib head in the “anemometer” socket on
fixed jib junction box.
Caution:
See the Installation Guide& User’s Manual for Load Moment Limiter.
Set the Master Lighting Switch 39 (see Section 4.1.4) to the second position, and
press “warning lamp on/off” Switch 41 at the same time to check that the warning
lamp lights up.
Rotate the vane of anemometer to check whether the wind velocity shown on the
display in the operator’s cab is normal.
Support and hold the hoisting limit switch weight for H2 to ensure that the switch is
triggered, and then check that the icon “upper limit switch on H2” on the screen will
flash and the buzzer will sound.
5.11.5.1 Requirements
b) The limit switch control lever has been checked for smooth movement.
g) Operate the hoisting winch, and adjust the hoisting limit switch on fixed jib head manually.
Requirement for this operation: the hoisting movement of hoisting winch should be
stopped when the upper limit has been exceeded, and icon “upper limit switch” on the
screen will flash.
b) The counterweight plates have been attached in accordance with the lifting capacity
charts
c) Select appropriate boom configurations according to the load to be lifted and the load
capacity chart; ensure that boom sections have been connected and secured;
d) All limit switches has been correctly fitted and are fully operational;
f) The hoisting rope has been correctly placed in the rope pulleys and prevented from
jumping out (from rope groove) using rope guard tube;
i) In winter, the main boom, fixed jib and associated components (limit switches, rope
drums, warning light, anemometer etc.) must be kept free of ice and snow.
Danger:
Incorrectly fitted or faulty limit switches and falling parts (pins, retaining pins, ice etc.)
can cause injury.
0066340-200-05Y.C
a) Select the “fixed jib” operating mode in the Load Moment Limiter in accordance with boom
configurations.
Caution:
Performing slewing motion while the fixed jib is being erected off the ground is
prohibited.
b) - Move the right control lever (27) to the left to raise the boom, and push the left control
lever(17) forwards at the same time to reel off hoisting winch 2 so that the load hook will
not be dragged on the ground.
- when main boom is raised to 30° position, the “assembly mode” will change to
“operating mode” automatically.
- move the left control lever(17) and right control lever (27) to neutral position.
c) Move the right control lever(27) to the left to erect the boom . When the main boom with
fixed jib is raised to requried working position, move the right control lever (27) to neutral
position.
Caution:
1. when main boom is raised to 83°, the movement of derricking boom up will be switched off
automatically along with warning being sent out, but the main boom can still be derricked up
by pressing the “bypass key button”(54). However, when main boom is raised to 86° position,
the movement of derricking boom up will be switched off automatically along with warning
being sent out. Under this condition, even though “bypass key button” is pressed, the main
boom can not be raised any more.
a) Move the right control lever (27) to the right to lower the boom. When the main boom is
lowered to 30° position, return the right control lever (27) to neutral position.
b) Push the left control lever (17) forwards to lower the hook on the ground.
Note:
To avoid load hook’s colliding with the pulley head, the load hook must not be lifted too high in the
process of lowering main boom with fixed jib.
c) Move the right control lever (27) to the right to reel off the derricking winch so as to make
the fixed jib head come into contact with the ground, then disconnect the inner pipe of rear
tilting-back support of fixed jib (G75) from the main boom head(See following figure).
0066340-200-05Y.C
G75
1
Connecting parts
Part
Description illustration
No.
2 Pin spindle
3 Cotter pin
ISO1234-1997(0.32″×2.4″)
0066340-200-05Y.C
d) -Keep on moving the right control lever (27) rightwards to reel off the derricking
winch so as to make the fixed jib head rolls forwards on the running wheel until the entire
boom gets into contact with the ground.
- Move the right control lever (27) to neutral position to stop the movement.
Caution:
1. The boom-lowering movement should be performed slowly and stably. And during
the operation, the crane operator must observe the data shown on the display,
while other workers must observe the surrounding areas for potential dangers.
2. Standing within an area where the crane movement is carried out is prohibited.
3. To prevent the wire rope from being damaged due to crush, it should be guided by
a person.
e) Push right control lever (27) backwards to wind the hoisting rope onto the winch 2 and
secure it.
Caution:
f) - Lift FA-frame by an auxiliary crane, and then dismantle the front and rear tilting-back
support of fixed jib.
- with the help of the auxiliary crane, tilt the FA-frame forwards to an appropriate position,
and then disassemble the fixed jib front and rear anchoring rods;
g) Spilt the fixed jib sections one by one, leaving the fixed jib pivot section assembled.
h) Detach the fixed jib pivot section (together with FA-frame) from the main boom head.
Caution:
All crane movements should be carried out smoothly, and all safety precautions
should be followed, otherwise there is a risk of accident.
0066340-200-05Y.C
5.12 Assembly and dismantling of main boom with heavy fixed jib (SFV)
For the assembly, dismantling and erecting as well as lowering of main boom with heavy
fixed jib, please refer to section 5.11 “Assembly and dismantling of main boom with fixed
jib”.
For electrical connections to main boom, please refer to section 5.8.3 “Connect electrics”;
In this boom configuration, the hoisting limit switch is mounted on heavy fixed jib, it should be
connected to “hoisting limit switch for H1” on junction box.
Crawler crane QUY260 has two tip booms, i.e., tip boom on main boom head, and tip boom
on luffing jib head.
1
2
G12
3
G10
1 Pin spindle
Retaining
2
spring
3 Pin spindle
0066340-200-05Y.C
G22
C
A
G20
C
B
5
4
6 7
3
0066340-200-05Y.C
1 Pin spindle
2 Retaining spring
3 Pin spindle
4 Retaining spring
5 Pin spindle
6 washer
(0.64″)
0066340-200-05Y.C
7 Retaining spring
0066340-200-05Y.C
Basic machine—(105800Ib)
Crawl
er carrier—54000Ib×2
a) After being dismembered, the crawler crane can be transported by a low-loader, train
or by other transport equipment for a long distance. During transportation, the crane
is fixed by rope, with its doors and windows locked up. If necessary, take preventive
measures against rain. The crawler crane should be dismembered and transported in
accordance with the permissible load carrying capacity of transport vehicle and the
weight, dimensions of dismantled parts which are shown in the previous figures. The
transport vehicle is forbidden to be overloaded.
b) During transportation, all component parts should be fixed to prevent them from
jostling and sliding.
If the crane is permanently inactive for more than 6 months, take the following protective
measures.
a) Wipe off the dust and oil dirt to keep the crane clean;
c) Put the battery in a dry and ventilating place and charge it periodically;
e) Clean the wire ropes and grease them again with ZG-3 graphite calcium base
grease;
f) The crane should be stored in a garage. If it is placed in the open air, it must be
covered up with water-proof cloth to prevent it from corroding, and in winter
antifreeze measure should be taken;
g) Starting the machine once a month and running all mechanisms with no load to
check whether they are in good condition;
h) Assign a person responsible for completeness of the crane so that it can be put into
operation at any time.
0066340-200-05Y.C
a) After being dismembered, the crawler crane can be transported by a low-loader, train
or by other transport equipment for a long distance. During transportation, the crane
is fixed by rope, with its doors and windows locked up. If necessary, take preventive
measures against rain. The crawler crane should be dismembered and transported in
accordance with the permissible load carrying capacity of transport vehicle and the
weight, dimensions of dismantled parts which are shown in the previous figures. The
transport vehicle is forbidden to be overloaded.
b) During transportation, all component parts should be fixed to prevent them from
jostling and sliding.
If the crane is permanently inactive for more than 6 months, take the following protective
measures.
a) Wipe off the dust and oil dirt to keep the crane clean;
c) Put the battery in a dry and ventilating place and charge it periodically;
e) Clean the wire ropes and grease them again with ZG-3 graphite calcium base
grease;
f) The crane should be stored in a garage. If it is placed in the open air, it must be
covered up with water-proof cloth to prevent it from corroding, and in winter
antifreeze measure should be taken;
g) Starting the machine once a month and running all mechanisms with no load to
check whether they are in good condition;
h) Assign a person responsible for completeness of the crane so that it can be put into
operation at any time.
Chapter 6 Maintenance
0066340-200-06Y.C
6.1 General
In order to ensure a good and safe condition of the crane all the time, the maintenance worker
must service and maintain the crane periodically.
6.1.1Crane maintenance
Before inspecting and maintaining the crane, following prerequisites must be fulfilled:
—The key is taken out from the ignition starter switch to prevent the engine from being
switched on by an unauthorized person.
Caution:
b) The crane should be set up on level and firm ground, where a warning board marked
“Inspection” is placed around the crane;
c) Use ladder and safety belt when working in high position 2m above the ground;
d) When there is a need to move the crane for maintenance, the operator must operate
the crane according to the signals;
e) When inspecting or maintaining the hydraulic system, dust and impurities are not
allowed to enter into the system;
f) If several parts need to be repaired and adjusted, please repair and adjust them
immediately;
g) If the crane needs to be repaired, the customer must contact a local service station of
Mobile Crane Branch Company of Zoomlion;
h) In order to ensure the performance of the crane, please use the accessories and
lubricating grease specified by Zoomlion;
i) The expendable parts such as filter cartridge must be changed in time to avoid the
malfunction;
k) Place crane where it will cause the least interference with other equipment or
operations in the area.
l) Set all controls in the off position and ensure all operating features are secured from
inadvertent motion by brakes, pawls, or other means.
m) Lower the boom to the ground, if possible, or otherwise secure against dropping.
n) Relieve hydraulic oil pressure from all hydraulic circuits before loosening or removing
hydraulic components.
Before carrying out the inspection and maintenance, put a warning board marked
“Never start engine during inspection and maintenance.” on the ignition starter switch.
The room for storing lubricating grease must be kept clean. Never allow dust and
water to enter into container. Ensure that the used lubricating grease is not mixed with
water.
Note:
1. After cleaning the machine, lubricate the propeller shafts and rotary parts.
2. The steering wheel, operating desk, control panel and floor inside the operator’s cab
must only be washed by warm water with cleaning agent.
d) Oil clean up
When adding or changing fuel, hydraulic oil and lubricating grease, or when replacing
the filter cartridge, the oil will be spouted out. At this moment, wipe off oil to prevent a
fire.
e) Never spray water on the electric elements and the fittings when washing the
machine.
f) Prevent a fire
The rubbish attached with oil stain or other flammable substances must be placed in a
safe place. Know about the position of fire extinguisher and master its use methods.
When checking the fan belt or the water pump, the operator could be hurt. Therefore,
he should first switch off engine, and then check the belt or the water pump.
It is very dangerous to drain water, oil or replace filter cartridge immediately after the
engine stops. This operation must be done only when the temperature of engine has
fallen down. If the oil temperature is too low, heat oil to make its temperature reach
20~50℃, and then drain the oil.
Check if there has metallic bits or impurities when changing the oil or filter cartridge.
The dismantled hydraulic pipes and hydraulic elements must be protected by plugs or
sealing covers to avoid dust entering into these pipes and elements.
0066340-200-06Y.C
After dismantling O ring or other washer, clean the sealing surface and replace the
sealing elements with new ones. During assembly, apply oil on the sealing elements.
As there is pressure produced in the hydraulic system, air compressing system and
fuel system, the operator must release pressure first before dismantling their pipelines,
fittings and other components.
Cut off power supply; disconnect power lead of battery; never constantly apply the
voltage more than 200v; set up the grounding device away from the welding point 1m.
Never install the sealing device or bearing between the welding point and the
grounding point. Before carrying out welding operation in the vicinity of load moment
limiter or controller, demount them first to prevent them against damage.
First drain waste oil into a container, and then deal with it according to the
requirements for industry discharge substances.
o) Unauthorized personnel are prohibited to maintain the crane and replace the parts.
0066340-200-06Y.C
In order to know about the working conditions of crawler crane and its components, please
carry out inspection in accordance with the following requirements. Inspect them before the
crane is working for the first time, after the crane has not been used for a long time, or before
the crane is working for the first time after maintenance. The inspection result list refers to
attached table.
a) Check the daily record of work to ensure that all regular inspections, maintenance and
repair work is performed.
b) Check lowering limiter, boom angle indicator, tilting-back supports and other safety
devices for functional work.
c) Check the load-bearing parts carefully, such as wire rope (hoisting rope, derricking rope
and sling etc.), boom frame, support cylinders and load hook.
d) Check if there are some bolts, nuts and pins lost, and the components are cracked or
damaged.
e) Ensure that no modification has been made to the crane without permission, e.g.,
increase or decrease in counterweight plates, and improper repair of boom frame.
f) Check the fuel lines and the hydraulic oil lines for leakage.
g) Check if the values shown on instruments are correct after starting up the engine.
i) Check brake and clutch. Test the braking performance by lifting a load away from the
ground and holding it in the air for a moment.
j) Under working condition, the brakes for hoisting and derricking system will bear a limit
torque which is 33% larger than the torque transmitted from winding drum to brakes.
k) Mechanisms with dynamic brake systems (e.g. hydraulic brake valve, electrical braking)
shall have a secondary holding brake system which is independent of the dynamic
brakes restraining the same torque as for the primary holding brake.
l) In order to avoid free fall of winch, the holding brake shall perform the function of an
emergency brake in the event of failure of dynamic brake system. The holding brake will
work automatically when energy supply is switched off.
m) The deceleration in an emergency case should not lead to damage to the structure, wire
rope and winding drum as well as mechanisms.
0066340-200-06Y.C
Serial Serial
Code Designation Quantity
No. No.
1 CSH G1/4″/WD Test joint 1 1
7 VDDKO10-L Joint 1 7
8 VDDKO15-L Joint 1 8
9 A15-ML/WD Joint 2 9
6.2.4 Visual
32 Slewing table Damage and crack
Every 6 inspection
months or
every 600
33 Engine air filter Change
hours
Note: The serial number in above table should be consistent with that in following context.
Note:
1. If pipeline leaks oil, wipe it clean at once and repair the leaking point completely.
2. If maintenance work will be carried out near the engine, the person must not step
onto the fuel pipe.
2) A-frame
Note:
If A-frame is damaged, please contact a local service station of Mobile Crane Branch
Company of Zoomlion.
3) Engine
Start the engine and check it for starting condition and abnormal noise.
4) Slewing brake
Check slewing brake for functional work. (Turn slewing brake switch in “ON” position to
operate the slewing movement. If the slewing brake is valid, the slewing movement will
not be carried out.)
5) Slewing lock
Check that slewing lock pins can be inserted smoothly, and check the lock pins and
connecting rods for deformation.
Switch on the switches to check that the horn, lamps and wiper work properly.
7) Air filter
When air filter is clogged, the indicator will display red color.
Check connecting pins, anchoring rods and cotter pins for damage or tight fit.
Often wipe the glass, ladder, handrail and guardrail with a clean cloth, especially when
they are polluted by grease.
6.2.2 Maintain and inspect superstructure every month or every 100 hours
Check the tension of fan belt. Press its middle position; if deflection is between 10mm and
15mm, it is normal.
Caution:
Switch off engine before checking the fan belt; otherwise serious injury may occur.
Clean the radiator core and check the radiator and the oil cooler for deformation and
abnormal condition.
Check the foundation bolt for tight fit and damping rubber cushion for damage.
17) Valves
6.2.3 Maintain and inspect superstructure every 3 months or every 250 hours
Please change these five devices in accordance with the requirements after 250 operating
hours.
Note:
On no conditions should diesel oil be attached on the engine house, otherwise, the fire will
arise. Keep the engine house clean to the utmost, especially when changing the filter and
releasing the air. If diesel oil is spilled on the engine house, wipe it off at once. Before
replacing the filter, the operator had better put a cloth on the house to absorb the fuel.
6.2.4 Maintain and inspect superstructure every 6 months or every 600 hours
If the icon at upper right-side of control panel flashes, it means that the engine air
filter is clogged. At this time, the engine air filter must be changed.
Check connecting pins, anchoring rods and cotter pins for damage and tight fit.
6.3.2 Maintain and inspect undercarriage every month or every 100 hours
Check hydraulic motor and reducer for leaks and abnormal sound.
5) Valves
8) Slewing ring
a) When slewing ring leaves from the factory, a little No.2 extreme pressure lithium
base grease (GB7323-1994) is applied on the inside of roller. The user can supply
new lubricating grease according to different working conditions.
b) Generally speaking, lubricate ball-type slewing ring every 100 hours, and roller-type
slewing ring every 50 hours. However, when slewing ring is running continuously
under adverse circumstances (e.g., high moisture, full of dust, considerable change
in temperature), it must be lubricated every week.
Supply enough lubricating grease before or after the machine stops working for a
long time.
Supply lubricating grease to the inside the roller of slewing ring until the grease flows
out from the sealing positions. When supplying lubricating grease, run the slewing
ring slowly to apply the lubricating grease evenly.
c) Clean the surface of slewing ring teeth and apply lubricating grease every 10 days.
0066340-200-06Y.C
Support Lubricating
Working condition Quality
structure point Name
indicator
Extreme pressure
No.1 /2
lithium base grease
Roller bed
-40℃
M0S2 compound
~ No.2
calcium base grease
120℃
Metal separate High No.4
block temperature, Gear high-temperature No.4
Labyrinth seal moisture grease
M0S2 compound
Roller bed No.2
80℃ calcium base grease
~ No.4
180℃ Gear high-temperature No.4
grease
No.2 compound
Normal temperature, Roller bed aluminium base No.2
corrosion resistance grease
~50℃ No.4 aluminium
Gear No.4
base grease
Since the working conditions of slewing ring are complicated, the user can adopt the
optimum lubricating grease according to actual conditions.
d) Check the pre-tightening force of fixing bolts after the slewing ring is operated for
100 hours. And check them again after 500 operating hours to ensure sufficient
pre-tightening force. Generally speaking, change the bolts after 14000 operating
hours or 7 service years.
e) Pay attention to the running condition of slewing ring during operation. If noise
becomes loud, impact force and power increase suddenly, check the vehicle
immediately and eliminate the failures. If necessary, dismantling of the vehicle is
also needed.
f) The slewing ring in use should not be exposed to strong sunlight. Never wash the
slewing ring directly using water in order to prevent the water from entering the roll
path. Precautions are taken against hard objects from approaching to or entering
the meshing area.
g) Check sealing strip regularly. The sealing strip, if damaged, should be changed, and
0066340-200-06Y.C
9) Crawler
Caution:
1. If track shoes are connected with each other tightly, they will be worn out quickly so as to
make connecting elements broken. On the other hand, if they are connected loosely, the
crawler will fall off from drive sprocket and driven sprocket.
2. It is normal that the crawler tension length varies from 10mm to 20mm. As long as
crawler travels the same distance forward as its length, the upper crawler will appear a
certain degree of relaxation.
6.3.3 Maintain and inspect undercarriage every 3 months or every 250 hours
Note:
If the bolt looses, demount it for check. If it is damaged, replace it. If the demounted
bolt is not damaged, wipe it clean, grease NO. 242 LOCTITE glue (or similar glue)
on it and then screw it down with 2.8KN.m (2060ft-lbs) tightening torque.
6.3.4 Maintain and inspect undercarriage every 6 months or every 600 hours
Check undercarriage centre section and crawler carrier for crack and damage.
Note:
If uncertain failures are found during inspection or maintenance, please contact local
service station of Mobile Crane Branch Company of Zoomlion.
Maintain and inspect following components of boom frame system every day or every 5 hours.
0066340-200-06Y.C
Check upper & lower pulley block for deformation and crack.
Note:
1. It is prohibited to touch wire rope with bare hands. Otherwise, the operator will
be injured by rope’s convex section.
2. Keep yourself away from rotary drum and running wire rope.
4. Keep ladder, platform and guardrail clean and dry. When climbing the crane,
tighten the safety belt. Otherwise, the operator may fall down from crane.
Check pulley, bearing of load hook and safety catch for damage.
0066340-200-06Y.C
3) Rope support
Check rope support in boom intermediate sections and boom head for deformation,
damage and wear.
4) Rope pulley
Deflection pulley
Do not use deformed and (or) damaged main boom and jib.
Note:
Since main boom and jib are made of high-tensile steel, if they need special art
technology for maintenance, please contact a local service station of Mobile Crane
Branch Company of Zoomlion.
8) Tilting-back supports
Check tilting-back support of main boom and tilting-back support of jib for damage and
deformation.
0066340-200-06Y.C
Note:
If they need special art technology for maintenance, please contact a local service
station of Mobile Crane Branch Company of Zoomlion.
9) A-frames
Note:
If they need special art technology for maintenance, please a contact local service
station of Mobile Crane Branch Company of Zoomlion.
a、Check wire rope for damage and deformation. Never use wire rope with wire breaks
and knot. If wire rope is broken during operational period, serious accident will occur.
Therefore, wire rope must be inspected periodically. It is forbidden to use the corroded,
abraded wire rope or wire rope with wire breaks. As to the determinant of safety degree
and discard standard for wire rope, please refer to the 《Practical Criterion for Inspection
and Scrap Wire Rope of Crane ISO 4309;1990》 or local relevant regulations for
machine use. The methods for common situations are listed in following table.
Serial
Conditions of wire rope Measures
No.
There is 10% wire breaks in a strand (not including filling thread).
It is very difficult to check the inner wire breaks. Bend wire rope
1 forcibly to expose wire breaks in groove. If there is wire breaks in
groove, which means there is wire breaks inside the rope.
Therefore, wire rope reaches its fatigue limit. Change wire rope at
once
The diameter of wire rope is narrowed by 7% than nominal size
2
due to corrosion.
3 The evidence of knot
c、All rope which has been idle for a period of a month or more due to shutdown
or storage of a crane on which it is installed shall be given a thorough
inspection before it is used. This inspection shall be for all types of
deterioration and shall be performed by an appointed or authorized person
whose approval shall be required for further use of the rope.
d、Rotation-resistant rope shall be given special care during installation as it is
easily damaged.
e、Socketing shall be done in the manner specified by the manufacturer of the
wire rope or fitting.
f、 maintenance of the rope shall conform to ANSI B30.5:2007 section 5-2.4
11) Maintenance of load hook 1 and 2
Since load hook 1 and 2 are used in different operating conditions, they should be
inspected every day (begin with alternate operation). Carefully observe any deficiencies
that may impair safety in operational period. Do not use load hook 1 and 2 until the
deficiencies are overcome.
b. Lubricate rope pulley (when equipped with grease nipple), rotary part and other
parts which are mentioned in “Lubrication Guide”, and equipped with grease nipple;
c. Check all bolts and screws, and ensure all cotter pins are complete;
d. Check whether the groove and flange of rope pulley are abraded evenly, and
inspect whether rope pulley is fitted tightly; if not, it means bearing or bearing bush
are damaged;
e. Check that the rotary connection of load hook can move easily, and the clearance is
not too large. If hook rotates stiffly, it means the bearing and bearing bush are
damaged or lubricated insufficiently;
f. Check load hook for easy rotation: rotate the hook by hand. If it is stiff, it indicates
that the bearing has been damaged;
g. Check the load hook 1 is damaged due to overloading: side plate and diameter of
bore are extended, and bolt is bended, extended or cracked;
h. Check the rope fixation for wear and wire breaks. Check the rope lock for crack and
tighten the bolt on the rope clamp;
Check load hook and snap ring at least once a year by using coloring, magnetic
particle methods, ultrasonic wave methods or X radiographic methods.
0066340-200-06Y.C
Note:
1. The load hook and snap ring should not be repaired by welding, furthermore, the load
handling devices are not allowed to be welded without the permission of manufacturer and
they should be welded with proper methods if necessary.
2. The safety catch must keep loosening sling and other load handling devices on the hook,
however, it can not be loaded. The sling and other load handling devices must be placed on
the hook, and not on safety catch.
This chapter only briefly introduces some notes on maintaining engine. As to how to maintain
and service engine, please read Engine Maintenance Manual carefully.
Maintenance must be carried out conscientiously within the specified intervals. Apply the
maintenance interval that comes first.
5) Engine suspension
Note:
1. It is not allowed to repair or maintain engine or its parts especially those relevant
to safety of engine. However, the parts listed in our operating manual and
engine maintenance manual should be repaired or serviced periodically.
2. Before carrying out welding operation on the machine, the operator must
disconnect cables from positive pole and negative pole of battery. When
connecting electric welding machine to its earthing cable, make sure that this
cable is not farther than 0.61m from the welded part. Do not connect the
earthing cable with ECM or cooling plate of ECM. Never perform welding
operation on engine or the parts of engine.
3. When cleaning the parts with solvent, acid cleaning agent or alkaline cleaning
agent, the operator must wear goggles and put on protective clothing to protect
him from damage. And he must adhere to methods recommended by engine
manufacturer to clean parts.
4. When cleaning the parts with steam, the operator must wear goggles and put on
protective clothing.
a) Electrical parts;
0066340-200-06Y.C
b) Conducting wire;
c) Fuel injector;
f) ECM;
g) ECM connector
5. When ambient temperature is less than -18℃ or more than 38℃, or when crane
works in dust conditions or engine is shut down frequently, the maintenance
interval of engine should be shortened accordingly.
6. Take particular precautions regarding cleanliness when replacing diesel and oil
filters. Any fuel or diesel oil that has leaked shall be completely cleaned up.
Check oil pipeline and hydraulic system for leaks.
7. All electrical lines and wires must be arranged and fastened properly. They
should be kept away from exhaust pipes. Examine all wiring insulation or
casings for signs of chafing or brittleness as a result of operational activities.
Any wiring that is not in perfect condition shall be immediately and professionally
replaced.
8. Over the years, fuel and oil lines can become brittle or porous due to aging. Any
lines that appear to be excessively porous should be replaced immediately.
10. To prevent pollution, engine oil, gear oil, hydraulic oil, lubricating grease and fuel
as well as coolant should not be spilled onto the ground and they also should
not flow into ground water, sewage or wastewater system. Comply with the
regulations specified by local authorities before disposing of any of these items
or substances.
12. Relief valve settings shall be specified and any change in relief valve settings
without the consent of the manufacturer shall be the responsibility of the user.
—Before putting these components into service, ensure to add specified oil to the max.
marking; for the type of oil, check data tag and lubrication chart.
When crane is delivered to you from the factory ready for operation, it is supplied with hydraulic
oil GB 11118.1-94(The hydraulic oil used in the crane now corresponds with ESSO NUTO H32
hydraulic oil.) or low condensed hydraulic oil L-HV32. The volume is of 800 liter.
Note:
The product is full hydraulic driven. The quality, viscosity and cleanliness of
hydraulic oil are the most important factors to crane’s functional working. The
customer’s ignoring replacing hydraulic oil in time will bring on various kinds of
malfunctions and reduce its service life greatly. Our company will not take the
responsibility for all the consequences caused by customers failing to comply with
the requirement stipulated in this manual to replace and filter hydraulic oil.
The normal oil change interval is 2000 operating hours. If hydraulic oil is obviously polluted,
it must be changed in time without considering operating hour. The inspected item and oil
change interval are shown in following table.
0066340-200-06Y.C
Take a sample of hydraulic oil for inspection periodically. For crane working under normal
condition, its hydraulic oil should be checked every 3 months; for crane working frequently
or working in adverse environment, its hydraulic oil should be checked every month. The
inspected item and limitation value should comply with the requirements in following table.
For hydraulic oil which does not reach limitation value, change it at once.
between ☆ESSO
-20°C and -20℃ -10℃ 5℃ 80-85℃(*) NUTO H46
40°C
ESSO
above NUTO H68
-5℃ -3℃ 20℃ 100℃ ( **)
40°C
Caution:
1. If crane starts in cold area, it should first run without load for a while. After the lowest
working temperature is reached, the load can be added gradually and the system can
work.
2. The oil property should be identical with that of the original brand when changing oil. The
original oil should be washed away thoroughly. The hydraulic oil of different types and
different brands can not be mixed together!
3. The domestic brand of hydraulic oil mainly includes Kunlun, the Great Wall, Tongyi,
Haibrand, Daqing, Hengyun, Guta, Jiali, Jiarun, Haili, etc. and foreign brand such as
ESSO, Mobil, etc. are also available in china.
4. If you find any special operating conditions which are not listed in the above table,
please consult the related departments of our company.
6. The suitable oil temperature for hydraulic system in working condition is 20℃ to 80℃.
The 85℃ may occur for a short time or in some position.
7. When the oil temperature is too high (nearly 100°), pay attention to the cooling of
system. The working load should not be too heavy and the working frequency should not
be too high.
First change hydraulic oil in the tank. Drain hydraulic oil from the tank, and then
dismember the master oil return pipe. Clean the tank and the oil filter carefully. First clean
them by using the chemical cleaning agent of solid particle pollution grade less than
18/15. After airing, wash them with the clean hydraulic oil of solid particle pollution grade
less than 18/15 and then add new hydraulic oil after draining off oil.
Actuate engine and run it at low speed to let the oil pump start to control mechanisms.
0066340-200-06Y.C
Use new hydraulic oil to drain used oil out of every circuit in the system until the new oil
flows out of the master oil return pipe. The used oil is not allowed to return to the
hydraulic oil tank. At this time, the oil pump stops running. While the used oil in each
return line is changed, the new oil should be added into hydraulic oil tank continuously to
prevent the oil pump from inhaling air.
Connect master oil return pipe with oil tank, make each component to initial state and add
hydraulic oil to oil tank until the oil level reaches prescribed position.
Note:
4. Service life of hydraulic oil can not exceed 24 months. The hydraulic oil can not
be used even though it is filtered, if it has been used for 24 months.
Observe the temperature of hydraulic oil from the scale on the liquid temperature meter,
and the highest temperature of hydraulic oil is 80°C.
When crane is in traveling condition, inspect oil level. Observe the temperature and the
level of hydraulic oil from the scale on the liquid temperature meter. The scale of 0°C is the
lowest oil level. So when oil level is below this line, top crane up with oil.
Prior to the initial starting of engine or after the oil changing of hydraulic system, remove
the upward oil drain plug on the motor and main hydraulic pump, and add oil with an oiler,
then tighten the oil drain plug, finally restart engine.
If the engine has not worked for more than a day, the hydraulic system must be deaerated
after engine starts. To exhaust the air in hydraulic system, you should first run the engine at
low speed of less than 1000rpm for 10 minutes and keep the motor in low-load(or no- load)
condition and then operate the mechanisms of crane in proper order for 3-4 times.
Use gear oil recommended in this manual. Before crane leaves the factory, such devices as
hoisting winch reducer, derricking winch reducer, slewing reducer and reeving winch have
0066340-200-06Y.C
already been filled with L-CKD220 industrial closed gear oil. The power divider of drive gear
has been filled with GL-5 85W/90 heavy-duty vehicle gear oil.
Delivery
Three months Add oil Replace
date Every 12 months
oil
Caution:
1. If gear oil is polluted seriously, replace it at once even though it has not reached the oil
change interval.
4. Use proper gear oil according to ambient temperature, since unqualified gear oil or gear
oil with improper viscosity will damage reducer mechanism.
a) Change gear oil of hoisting winch reducer and derricking winch reducer
1) Unscrew and remove oil drain plug and oil filler plug on the winch reducer, and drain
original gear oil;
3) Put funnel head into oil filler to add specified gear oil to inspection hole until the oil is
visible in the middle of inspection hole;
0066340-200-06Y.C
1) Unscrew and remove oil drain plug and oil filler plug on slewing reducer, and drain original
gear oil;
3) Put funnel head into oil filler to add specified gear oil to inspection hole until the inspection
hole is completely full of oil;
There is volume of lubricating oil on name plate of transfer case for reference. However, the
oil level must be subject to the mark left on oil dipstick. Therefore, the inspector should check
oil level with oil dipstick according to the specified requirements. After adding oil to transfer
case for the first time, the inspector should check oil level when power is started for 15mins
to 30mins. If oil is going down, add oil to specified position.
Generally speaking, change lubricating oil after first 200 operating hours. After that, change
lubricating oil after 2000 operating hours or 12 months at least.
Use the lubricating grease recommended in this manual and this crane uses ZL-2 and ZG-3
lubricating grease.
In order to keep crane in good working condition, all machinery parts that need lubrication
0066340-200-06Y.C
should be supplied with specified grease periodically. All of them, except for those purchased
components, are marked in following diagram.
Every day or
1
every 5 hours
2
Every week or
every 25 hours
3
Every year or
every 1000 hours
4
5
6
0066340-200-06Y.C
Note:
1. The oil cup and the surface to be oiled should be wiped clean before adding
oil.
2. The sliding surfaces which are not listed in above table must be greased
periodically.
4. Add grease to bush, shaft and bearing until the used grease is squashed out.
6. Keep ladder, platform and guardrail clean and dry. When climb the crane,
tighten safety belt. Otherwise, the operator may fall down from crane.
8、Set all controls in the off position and ensure all operating features are
secured from inadvertent motion by brakes, pawls, or other means。
Check engine oil level before operation. Take out the dipstick, wipe it with a clean cloth
and re-insert it as far as possible. If oil level is between the MIN and MAX markings on the
dipstick, it is normal.
Caution:
The crane must be level when checking engine oil level. Otherwise, the oil level will be
measured inaccurately.
a) Unscrew and remove oil drain plug at the bottom of oil pan, and drain original engine
oil.
c) Put the funnel head into oil filler to add specified engine oil until oil level is within the
MAX and MIN markings on the dipstick.
Caution:
1. When replace engine oil, the filter cartridge should be replaced together.
2. Don not remove oil drain plug when engine oil is still hot. Otherwise, you may get
scalded.
6.6.5 Fuel
Caution:
3. Smoking is forbidden when add fuel. Otherwise, fire hazard will arise, which will
lead to property loss and personnel injuries.
All fuels shall be transported, stored, and handled to meet the rules of Subpart F of 1926.550.
When fuel is transported by vehicles on public highways, Department of Transportation rules
contained in 49 CFR Parts 177 and 393 concerning such vehicular transportation are considered
applicable
6.6.6 Coolant
Note:
The above change interval is applicable to normal conditions. For other kinds of coolant,
change it every 6 months.
0066340-200-06Y.C
a) Remove radiator cover to check coolant level, and check fluid level of auxiliary water
tank.
b) When coolant is insufficient, add softened water to water injection hole, and top up
auxiliary water tank.
Caution:
1. Do not open the radiator cover when crane is warm up. Remove cover with thick cloth or
gloves after coolant does not bolt. When engine is in working temperature, the coolant has
high temperature and pressure.
b) Mix softened water with durable coolant, and then add the mixed fluid to radiator until it
is visible at the bottom of water injection hole. In order to avoid air entering into the
radiator, the water should be added slowly. When the fluid level no longer falls down,
screw down the lid.
c) Start engine and run it for one minute, then stop to check the fluid level. If the fluid level
is not enough, add water again.
Caution:
1. Do not drain coolant when crane is warm up, since hot coolant may burn the skin. Only
when coolant has been cooled down, can it be drained out.
Item Measures
Air filter Clean or replace in time
Radiator, oil cooler Clean in time to prevent them from being blocked.
Filter, filter cartridge Replace them in time
Engine oil Replace oil in time
Slewing gear ring Lubricate it in time
0066340-200-06Y.C
Item Measures
Lubricate all lubricating points and joints which have not been fitted with grease
Lubrication
nipple completely and carefully.
Basic machine Clean crane body, radiator and oil cooler in time to get rid of salt.
7.1 General
Initial Inspection. Prior to initial use, all new and altered cranes shall be inspected by a
The crane must be inspected by a competent inspector, depending on the application situations
and the operating conditions, at least once a year, counting from the day of initial service.
Before operating the crane, a visual inspection must be performed to prevent accidents by
detecting deficiencies in a timely fashion.
Note:
1. When significant changes are made to the crane or repairs are made to the load bearing
parts, the operator must have the crane inspected by a competent inspector before putting
it into service.
A number of important examples of items that are particularly important during crane
re-inspections are listed in the following. Adhere to the following inspection guidelines and
intervals; otherwise, serious accident may occur.
0066340-200-07Y.C
Steel bearing components such as boom must be carefully inspected at least once a year. Even
though weld joints are not normally situated at maximum load locations, it is nevertheless
important that they should be inspected with particular care during the periodic inspections.
If the crane was subjected to excessive operating loads, for example an unusual shock or
impact, the load bearing components must be inspected immediately.
If damage (e.g., cracks) is found in any part of the steel structure, the total extend of the
damage must be determined by qualified specialists using appropriate material test methods,
such as magnetic crack detection, ultrasound or X-ray. The specialists should then advise
whether or not the damaged area can be repaired by welding or other means.
The welds or steel structural zones that require inspection may be present more than once and
in various forms. The joints or zones must be inspected all around at the locations identified by
arrows.
Note:
The scope and extent of all inspections remain the sole responsibility of the inspectors.
The following diagrams are provided to assist the inspector. The diagrams are only examples
and are not necessarily 100% complete!
The hoisting and luffing winches and slewing reducer are designed using integrated planetary
gears. The gears are designed for long service life and the drive shaft and drive gear are rated
for endurance. Even though these gears are designed for long service life, an external visual
inspection is not adequate, since their life can be significantly affected by bad maintenance
(insufficient oil), defective seals, improper operation or overuse. The inspection must therefore
be carried out by a competent inspector in accordance with the following guidelines.
7.3.1 Inspections
a) Inspection intervals
Caution:
These repairs may only be carried out by specialists with appropriate equipment
knowledge.
f) Visual inspection
The drive devices shall be checked for leakage, since any loss of oil, in addition to polluting
the environment, can lead to gearbox failure.
g) Inspection the drive device breaks.
Check the brakes at the same check the drive devices.
0066340-200-07Y.C
If the brakes cannot hold the specified test load of 33% rope tension increase on a single
rope strand and fully spooled drum, they shall be dismantled to determine the cause.
Whenever a planetary gearbox is dismantled because of increased contamination, the
brakes shall also be inspected.
Caution:
Only qualified personnel with specialized knowledge can inspect the gearboxes and
brakes.
h) Documenting the completed inspection
The results of the annual inspections and maintenance work, including all competed tasks,
shall be documented by the competent inspector, if necessary, and signed off by inspection
station or specialty shop.
Caution: the “theoretical service life” is not equal to the real (true) life of a winch.
The actual life of a winch is affected by many additional outside factors, for example:
--corrosive atmosphere
--dust and dirt
Note: For mobile cranes in assembly operation, we normally use the load collective
Load Load
Operating time
collective Definition collective Graph
components
classification factor
Light Drive 10% of the running Km=0.125 Load %
Q1 device or time at maximum
L1 parts load(dead load and
thereof are 1/1 working load)
subjected 40% of the running
to time with dead load
maximum and 1/3 working
loading in load
exceptional 50% of the running Running time%
cases, but time only with dead
normally load
only
operate at
very light
load.
0066340-200-07Y.C
operating time for the superstructure can be estimated at 60% of the total operating hours
of the crane. If the hoist winch proportions is estimated at 20% of the superstructure
operating hours, the resulting hours as a percent of the total crane operating hours is:
12%.
Note:
The percentage staged above normally applies to main hoist winches. For auxiliary hoist
winches or lufffing winches, the proportion of the total operating hours can be significantly less
and should therefore be estimated by the operator.
Note:
1. A general overhaul of the winch is required not later than 10 years after putting the crane into
service
2. The general overhaul shall be arranged by operator and carried out by the manufacturer or the
manufacturer’s authorized representatives and must be documented in the inspection log.
Example
According to the manufacturer’s operating manual, a mobile crane with a separate elapsed
time meter for the crane engine and the crane drive is classified as follows:
Drive gear group: M2
Load collective: light L1, km = 0.125
theoretical service life: D = 1600 h
0066340-200-07Y.C
Actual used proportion S of the theoretical service life is calculated using the individual
inspection intervals as follows:
First inspection (year 1)
The crane was used for assembly work during the past year:
Load collective L1, which means km1 = 0.125.
The hour meter for crane engine indicates 1800 hours. The winch operated about 12% of the
time, i.e. T1=216.
The actual used proportion S of the theoretical service life at the time of the first inspection is
therefore:
0.125
S1 = ————× 216 h =216 h.
0.125
Remaining theoretical service life:
D1 = 1600 h – 216 h = 1384 h
Note:
In case corrosion and wear is found on the threads, the load hook may no longer be used. In
such a case, contact the mobile crane branch company of Zoomlion.
Caution:
If any damage or cracks are found, then the rope pulley must be replaced immediately. If this
is not observed, there is great danger of causing a serious accident!
0066340-200-07Y.C
Note:
If any of the damaged listed above is detected, the anchoring rod must be replaced
immediately; damaged and faulty anchoring rods may lead to serious accident!
0066340-200-07Y.C
Being a crucial component for crane lifting, the wire rope will directly affect the assembling
work and safety on the construction site. Therefore, much emphasis should be put on the use,
maintenance and regular inspection of wire rope.
The wire rope should be handled and transported with utmost care. When loading a wire rope
down, never push it down directly from a higher position in order to avoid causing any damage
to the rope or to the reel.
A proper means of transport is to make use of a steel bar through the middle hole or axle of the
reel. The reel can then be lifted with a forklift or directly with a sling attached to a crane. When
the reel or coil is rolling on the ground, the illustrated bar can only be placed underneath both
flanges of the reel, without getting in contact with the rope. The ground should be even, and
the rope is not allowed to contact the sharp objects or the fork of the forklift, even if the outer
lay of the rope is protected.
Improper methods:
Proper methods:
0066340-200-07Y.C
Any torsional stresses and sudden acceleration of load caused by impact loaded on wire rope
and load hook will cause serious damage to wire rope, a comprehensive check should be
therefore performed on the wire rope. While checking, pay attention to the following points:
d) Type and number of wire breaks, and location and consequence of wire break;
Caution:
For crane that has been idle for a period of over 6 months shall be give a complete
inspection by a qualified person conforming with the requirement of this clause before
being placed in services.
Wire rope must be discarded immediately if any one of the following defects is found:
a) Broken strand or formation of broken wire clusters(In running ropes, six
randomly distributed broken wires in one lay or three broken wires in one strand
in one lay)
b) Wear of one-third the original diameter of outside individual wires. Kinking,
crushing, bird caging, or any other damage resulting in distortion of the rope
structure (Figure 1).
c) Basket formation( Figure 2);
d) sharp protruding strands or strand clusters(figure 3)/loop formation;
e) Reductions from nominal diameter of more than one-sixty-fourth inch for
diameters up to and including five-sixteenths inch, one-thirty-second inch for
diameters three-eighths inch to and including one-half inch, three-sixty-fourths
inch for diameters nine-sixteenths inch to and including three-fourths inch,
one-sixteenth inch for diameters seven-eighths inch to 1 1/8 inches inclusive,
three-thirty-seconds inch for diameters 1 1/4 to 1 1/2 inches inclusive;
f) 10% corrosion or wear (figure 4);
g) loosening of the rope structure(figure 4);
h) contractions(figure 5);
i) flattening and sharp bends(figure 6+8);
0066340-200-07Y.C
Caution:
1. If there is any doubt about the operational safety of any ropes, please consult with crane
specialist.
2. Should any of the above damages are discovered or any other damages occur, the cause
must be established before attaching or mounting a new rope.
3、wire rope safely factors shall be in accordance with American National Standards Institute
B30.5-1968 or SAE J959-1966
Wire ropes are sensitive and they should be kept clean and dray, and be prevented from
coming in contact with the ground; Wire rope transporting and replacing must be carried out
according to actual requirements;When replacing ropes, the new ropes must be of the same
strength rating and diameter as the old ones. Should another type of wire rope be used,
permission must first be obtained from the crane manufacturer.
Procedure for changing wire ropes and Notes
a) Preparation
1) The rope is usually replaced with a rope that is of the same type as the original. If the
spare rope is of another type, the user must ensure that the rope characteristics are
at least as good as those of the rope that was taken down;
2) When cutting a certain length of wire rope out of a longer one, the area where the cut
will take place should be treated properly beforehand, or appropriate technical means
should be taken to prevent the rope from coming loose at the cutting point;
0066340-200-07Y.C
3) Before installing a new wire rope, the grooves of the rope drums and pulleys must be
checked in order to ensure that they can accommodate the spare rope correctly;
4) Before starting to use the rope on an equipment the user must ensure that all
components that are associated with the rope have been set up in such a way that
they will operate correctly.
The wire rope can be unwound from a reel or uncoiled on the floor. If the later method is
applied, the floor should be clean and even; otherwise, foreign substances such as sand
grains stuck to lubricating grease will damage the wire rope when it passes through the
rope pulley.
In no circumstances shall the rope be pulled from a reel or a coil which is laying on its side,
otherwise a twisting force will be inevitably generated on each rope layer. Every twisting
force will change the twist pitch of rope strand; alter the proportion of each component part
in every section of rope length; and at last change load-bearing location of wire rope.
Since the unwound wire rope from the reel will resist the previous twisting force, the rope
will form loops and be kinked permanently.
The optimal installation of wire rope can be achieved depending on different type of crane.
The installation of a rope must be carried out very carefully to ensure that the rope can be
unwound from a reel or uncoiled from a coil without generating torque and causing any
outer damages. This point also applies when reeving the rope in the rope pulley. If the
rope is not installed under a load, any contact area between the wire rope and the
equipment should be protected properly.
0066340-200-07Y.C
It is recommended that the old rope should be removed prior to fitting a new rope. If the old
rope is used as a lead rope to pull the new one through the reeving system, do not
connect them together by directly welding or binding their rope ends; instead, they should
be connected with a Chinese finger. There is still another way to change a rope: use a
thinner rope as a lead rope to pull the new one through the reeving system. This way is
usually applied to the installation of a rope on new equipment.
In the manufacturing process, when a rope is wound onto a reel, the rope suffers bending
with a special direction. After the rope is delivered to customer, it is also bended towards
the same direction. Therefore, when the rope is unwound from a reel onto drum, it is
advantageous to maintain the direction of bending as it leaves the reel (see the above
figure).
If the above mentioned method is not observed, the wire rope will be kinked between the
reel and the drum or resume its original bending direction when used, which will result in
changes in the structure of rope.
If the first rope layer is not tensioned on the rope drum, the outer rope layer will cutting into
the lower rope layer under loading, which would result in serious damage to wire rope.
And the unwound rope can even get stuck, which will result in the reverse rotation of the
rope drum during the unwinding of rope, and thus causing the sudden increase in tension
0066340-200-07Y.C
The tensioning load should be 1-2% of the minimum breaking force. In many cases, the
rope should be unwound or wound properly with the help of an external force.
Enough tensioning load can be generated on the reel by depressing the wooden board
underneath one flanges of the reel or holding the braking bar that is connected with the
reel axles (see the figure above).
Note: we should on no account produce the tensioning force by means of compressing the
wire rope, such as putting the wooden board directly underneath the wire rope,
because the changes incurred in rope structure will make the rope deformation
irremediable.
3) Installing a new rope with the help of the old rope or a lead rope
For the spooling operation itself, the new rope is attached to the old rope or to a lead rope.
They can be connected by means of a rope hose or welded ring. However, please make
sure that the new rope is not twisted by the old or lead rope.
After the installation of wire rope and before starting to use it on the crane system, the
rope should experience normal “trial running” with a low load several times. After
0066340-200-07Y.C
undergoing “trial-running”, all components of the rope can be adjusted to real operating
condition.
The crane should be used for lifting at approximately 10% of the normal load in order to
stabilize the rope.
During the trial-running, crossing, kinking, twisting, and excessive bending as well as
scratch of wire rope should be avoided.
The wire rope should be protected against exposure to such dangerous medium as heat
source, acid and alkali. And it should be free of sands and dirty adhered, and be greased.
Regular maintenance and care of the ropes enhances the safety of crane operation and
substantially increases the rope’s service life.
a) Wire ropes must be greased or oiled at regular intervals, especially around the drums and
pulleys, areas where they are turned and flexed the most. The grease or oil must be
compatible with that already on the ropes. Well lubricated wire ropes demonstrate 4 times
as much flex-play as unduplicated ones.
b) Dirty wire ropes must be cleaned regularly; the best results may be achieved by brushing.
c) If the lower layers on the drum are hardly used or not used at all, they are loose and must
be unwound and then rewound under a preliminary tension.
d) A rope works most economically when its entire length is used. Therefore, an
appropriately adapted rope length should be used for crane operation of long durations. If
partial sections of a rope are subject to different and varying loads, the rope, after a
certain time, can be turned around. In doing so, the previously free end of the rope is
attached onto the drum so that the part of the rope which has been subjected to the most
wear and hard use is now in the “quiet” zone, and vice-versa. The service life of a rope
can be noticeably increased.
e) If wear results mainly from the multi-layer winding of the drum, the service life of the rope
can be increased by shortening it by a length equivalent to 1/3 of the drum circumference.
f) Extension torsion in torsion free hoisting rope and its elimination
1) A torsion compensation is not only required after a new rope has been placed, but also
if extension torsion has been established after a long working period, resulting from
stretching and settling of the rope structure.
2) Torsion compensation can be noticed when the hook block turns in multi reeve
operation and when the load is set down and / or the outer strand seem to loosen up.
In extreme cases, the rope shows an arch formation.
3) If a crane is operated for a long period of time with the same reeving, without
unreeving or changing the hoisting rope reeving, then we recommend installation of a
rope twist catcher on the fixed point of the hoisting rope.
0066340-200-07Y.C
Note: it is important that the correct reference point is taken and that the crane operator
Since a non-stretch rope construction is relatively safe from torsion and it can only be
stretched a little (actually, the torsion will not make the rope deviate from the groove of
rope pulley), the hoisting movements without a load must be repeated several times.
after getting the compensating turn to the end of the rope, reattach the rope end again
to the fixed point and repeat the hoisting movements without a load one or several
times so that the torsion compensation can be distributed over the complete length of
the rope past the rope pulley.
Note: if necessary, in case the stretch was especially severe (multiple twisting of the
lower pulley block and /or slackening of the outer strands over a long stretch, or
at several points) then repeat this procedure several times, depending on hoist
rope length.
0066340-200-07Y.C
7.7.5 Wire rope shall be taken out of service when any of the following conditions exist:
Oil and fuel tanks shall be inspected at lest once a year and checked all around for leakage in
the subsequent inspections every four years.
Repairs shall only be carried out by trained and knowledgeable specialists.
Improper repairs such as welding, brazing or soldering are not permitted without
consulting our company.
Diameter of
Bolts Mounting
Specification(ISO7412) hole
(mm)
Strength grade(ISO898-1) 10.9
2
M33 36 Limit of strength σsmin (N/mm ) 900
3
Pre-tightening moment(10 N) 412
b) Pay attention to the running condition of slewing ring during operation. If noise becomes
large, impact force and power increase suddenly, check vehicle immediately and
eliminate the failures. If necessary, dismantling of the vehicle is also needed.
c) The slewing ring in use should not be exposed to strong sunlight. Never wash the slewing
ring directly using water in order to prevent the water from entering the roll path.
Precautions are taken against hard objects from approaching to or entering the meshing
area.
d) Check sealing strip regularly. The sealing strip, if damaged, should be changed, and if
falls off, should be retuned to original position.
0066340-200-07Y.C
a) The engine must be inspected prior to every operation; i.e., daily check that all oil and fuel
lines are leak-free and dry. The fuel filter, oil filter and injection pumps shall also be
inspected for leakage.
b) Every day, check that the hydraulic components, fan drive hydraulic motors and their
supply lines are properly sealed and do no leak.
c) Check the exhaust system, especially the exhaust flanges and the exhaust flap brakes,
and make sure that they seal and move properly. The return springs that open the exhaust
flaps must function properly, because seized (therefore closed) exhaust flaps during
operation will cause increases in temperature and considerable overheating.
d) Check if electrical lines are functioning and mounted properly, and ensure that there is
sufficient clearance to hot exhaust pipes. Ensure that they are not damaged and still
properly insulated.
e) To reduce noise emission, noise reducing mats are installed in the engine area (engine
covering) for certain types of cranes. The fiberglass mats, after being cleaned, are
flame-resistant and fireproof.
f) If engine compartments are not cleaned regularly, oil and fuel may splash on the mats
while conducting maintenance and repair work. Oil and fuel soaked on noise reducing
mats must be removed, as they are flammable. The same is true for insulating mats in the
exhaust system area.
g) Clean the engine compartment only with nonflammable cleaning fluid. In addition, the fluid
may not be corrosive or chemically damaging to hoses and cables.
7.11 Cranes Not in Regular Use
a) A crane that has been idle for a period of 1 month or more, but less than 6 months,
shall be given an inspection by a qualified person conforming with the requirements
of paras. Chapter 6 6.2 before being placed in services.
b) A crane that has been idle for a period of over 6 months shall be give a complete inspection
by a qualified person conforming with the requirement of paras. Chapter 6 6.2、6.3 before
being placed in services.
c) Standby cranes shall be inspected by a qualified person at least semiannually in
accordance with the requirements of paras. Chapter 6 6.2、6.3 Cranes that are exposed to
adverse environmental conditions should be inspected more frequently.
7.12.1 "Initial inspection." Prior to initial use all new and altered cranes shall be inspected to
insure compliance with provisions of this section.
7.12.2 "Regular inspection." Inspection procedure for cranes in regular service is divided into two
general classifications based upon the intervals at which inspection should be performed.
The intervals in turn are dependent upon the nature of the critical components of the crane
and the degree of their exposure to wear, deterioration, or malfunction. The two general
0066340-200-07Y.C
classifications are herein designated as "frequent" and "periodic", with respective intervals
between inspections as defined below:
7.12.3 "Frequent inspection." Items such as the following shall be inspected for defects at intervals
as defined in paragraph (d)(2)(i) of 1910.180 or as specifically indicated including observation
during operation for any defects which might appear between regular inspections. Any
deficiencies such as listed shall be carefully examined and determination made as to whether
they constitute a safety hazard
a) All control mechanisms for maladjustment interfering with proper operation: Daily.
b) All control mechanisms for excessive wear of components and contamination by lubricants or
other foreign matter.
e) Crane hooks with deformations or cracks. For hooks with cracks or having more than 15 % in
excess of normal throat opening or more than 10 deg. twist from the plane of the unbent hook.
f) Rope reeving for noncompliance with manufacturer's recommendations.
g) Electrical apparatus for malfunctioning, signs of excessive deterioration, dirt, and moisture
accumulation.
7.12.4 "Periodic inspection." Complete inspections of the crane shall be performed at intervals as
generally defined in paragraph (d)(2)(ii) of 1910.180 depending upon its activity, severity of
service, and environment, or as specifically indicated below. These inspections shall include
the requirements of paragraph (d)(3) of 1910.180 and in addition, items such as the following.
Any deficiencies such as listed shall be carefully examined and determination made as to
whether they constitute a safety hazard:
a) Deformed, cracked, or corroded members in the crane structure and boom.
b) Loose bolts or rivets.
c) Cracked or worn sheaves and drums.
d) Worn, cracked, or distorted parts such as pins, bearings, shafts, gears, rollers and locking
devices.
e) Excessive wear on brake and clutch system parts, linings, pawls, and ratchets.
f) Load, boom angle, and other indicators over their full range, for any significant inaccuracies.
g) Gasoline, diesel, electric, or other power plants for improper performance or noncompliance with
safety requirements.
h) Excessive wear of chain-drive sprockets and excessive chain stretch.
i) Travel steering, braking, and locking devices, for malfunction.
0066340-200-07Y.C
7.12.6 "Inspection records." Certification records which include the date of inspection, the signature
of the person who performed the inspection and the serial number, or other identifier, of the
crane which was inspected shall be made monthly on critical items in use such as brakes,
crane hooks, and ropes. This certification record shall be kept readily available.
7.13 The employer shall comply with the manufacturer's specifications and limitations applicable to
the operation of any and all cranes and derricks. Where manufacturer's specifications are
not available, the limitations assigned to the equipment shall be based on the
determinations of a qualified engineer competent in this field and such determinations will be
appropriately documented and recorded. Attachments used with cranes shall not exceed
the capacity, rating, or scope recommended by the manufacturer.
7.14 Hand signals to crane and derrick operators shall be those prescribed by the applicable
ANSI standard for the type of crane in use. An illustration of the signals shall be posted at
the job site.
7.15 The employer shall designate a competent person who shall inspect all machinery and
equipment prior to each use, and during use, to make sure it is in safe operating condition.
Any deficiencies shall be repaired, or defective parts replaced, before continued use.
7.16 A thorough, annual inspection of the hoisting machinery shall be made by a competent
person, or by a government or private agency recognized by the U.S. Department of Labor.
The employer shall maintain a record of the dates and results of inspections for each
hoisting machine and piece of equipment.
Chapter 8 Additional equipment
8章
0066340-200-08.CY
And the heating is achieved by utilizing the heat of engine circular water supplied by
the evaporator fan.
The air conditioning in the cab is a heating & cooling air conditioning. Its control
panel is on the air conditioning cover behind the seats.
1 2 3
When air conditioning is used for the first time, turn the switch (1) to high gear
position and hold it for 5 minutes after engine starts, then turn the switch (2) to
“COOL” position. At this time, the temperature in the cab starts to fall down.
When the required temperature is obtained, turn the switch (2) anticlockwise slowly
until the indicator light goes out and the compressor stops working. At this moment,
set this temperature to the rated value.
When the temperature in the cab is higher than this value, the indicator light lights up,
the compressor starts automatically and the cooling system begins to work.
When the temperature in the cab is lower than this value, the indicator light goes out,
and the compressor and cooling system stop working.
Adjust the angle of air outlet to change the direction and angle of cold wind;
Adjust the switch (1), one of three fan speeds can be set for the heating or air
conditioning.
Note: Do not turn switch (2) to “COOL” position and rotate switch (1) to low gear
position when using air conditioning. Otherwise, evaporator may get frost and
cooling performance may be influence.
Note:
3. Wash off the dirt on the surface of condenser radiating rib. In this way, the
cooling performance can be protected.
4. When changing the components of air conditioning system, add freezing oil
according to the requirements. As there’s difference between compressors in
system, the brand and type of new freezing oil should be the same as that of
freezing oil used in the compressor. Different freezing oil, which is not given
explanation of being capable of mixing with the freezing oil in the system, is
never permitted to fill into the system.
5. When add or change refrigerant, its brand and type should be the same as that
of refrigerant used by original system.
6. Lower the temperature in the cab with the evaporator at high gear position, and
keep the temperature in cab at middle gear position or low gear position.
7. When the components in the system break down, they should be replaced with
the spare parts supplied or designated by manufacturer. Otherwise, the system
0066340-200-08.CY
may be damaged.
8. Under the condition of low temperature & high humidity, the evaporator should
not work at low speed. Otherwise, it may be frozen.
9. If air conditioning is not used in winter, switch air conditioning on once a month
and let it run for about 10mins. This minimum running is required to keep the
whole system adequately lubricated.
QUY260 crawler crane can be equipped with radio or CD, DVD player according to
customer’s demands.
Note:
Radio or CD, DVD player are not the basic allocations of crane. Customers can
select to assemble according to their different demands.
Crane
Chapter 9
inspection log
9-0
0066340-200-09
Table (1)
Actions
No. (inspection, testing, Component inspected Date
maintenance, repair)
9-1
1340-000-09
Table(2)
Actions
No. (inspection, testing, Component inspected Date
maintenance, repair)
1340-000-09
Table(3)
Actions
No. (inspection, testing, Component inspected Date
maintenance, repair)
1340-000-09
Table(4)
Actions
No. (inspection, testing, Component inspected Date
maintenance, repair)
1340-000-09
Table(5)
Actions
No. (inspection, testing, Component inspected Date
maintenance, repair)
1340-000-09
Table(6)
Actions
No. (inspection, testing, Component inspected Date
maintenance, repair)
1340-000-09
Table(7)
Actions
No. (inspection, testing, Component inspected Date
maintenance, repair)
1340-000-09
Table(8)
Actions
No. (inspection, testing, Component inspected Date
maintenance, repair)