STAAD - Pro Report: R.R. Ispat (A Unit of Gpil) Raipur 20 M High Mast
STAAD - Pro Report: R.R. Ispat (A Unit of Gpil) Raipur 20 M High Mast
STAAD - Pro Report: R.R. Ispat (A Unit of Gpil) Raipur 20 M High Mast
Pro Report
To: From:
RAIPUR
20 M HIGH MAST
Job Information
20/02/2021
20.000m
Y
X
Z Load 3
20/02/2021
PAGE NO. 1
****************************************************
* *
* STAAD.Pro V8i SELECTseries6 *
* Version 20.07.11.33 *
* Proprietary Program of *
* Bentley Systems, Inc. *
* Date= NOV 12, 2020 *
* Time= 11:18:14 *
* *
* USER ID: HIRA GROUP *
****************************************************
1. STAAD SPACE
INPUT FILE: F:\HIRA GROUP\HM20M\HM20.STD
2. START JOB INFORMATION
3. *20 MTR HIGH MAST 8 FIXTURES LIGHTING SYSTEM
4. *TOP DIA. = 150MM
5. *BOTTOM DIA. = 410 MM
6. *THICKNESS - TOP PORTION = 3MM
7. * -BOTTOM POTION =4 MM
8. *MATERIAL -
9. * FOR MAST - S355 GRADE AS PER BS-EN-10 025
10. *FOLLOWING CONSIDERATION HAVE BEEN TAKEN
11. * WIND SPEED 44 M/SEC
12. *WIND LOAD AS PER IS:875
13. *LOADS- LOAD-1 SELF WEIGHT OF STRUCTURE
14. *LOAD-2 DEAD WEIGHT OF PANEL,AND ACCESARIES
15. *LOAD-3 WIND LOAD
16. *LOAD-4 COMBINATION OF LOAD1+LOAD2+LOAD3
17. ENGINEER DATE 19-JUL-18
18. END JOB INFORMATION
19. INPUT WIDTH 79
20. UNIT METER MTON
21. JOINT COORDINATES
22. 7 0 0 0; 8 0 -20 0; 11 -0.250025 0 -0.25; 12 0.25 0 -0.25; 14
0.250025 0 0.25
23. 15 -0.25 0 0.25; 16 -1.18 0 0.25; 17 1.18 0 0.25; 18 -1.18 0 -0.25
24. 19 1.18 0 -0.25; 20 0.66 0 -1.19; 21 -0.66 0 -1.19; 22 0.66 0 1.19
25. 23 -0.66 0 1.19; 24 -1.18 0 -0.5; 26 -1.18 0 0.5; 27 1.18 0 -0.5
26. 28 1.18 0 0.5; 41 0 -8 0; 46 -0.250013 0 0; 47 -0.715012 0 -0.25
27. 48 0.715 0 -0.25; 49 0.715012 0 0.25; 50 -0.715 0 0.25; 51 0.25 0
-1.19
28. 52 -0.250025 0 -1.19; 53 -0.25 0 1.19; 54 0.250025 0 1.19
29. MEMBER INCIDENCES
30. 1 7 15; 2 7 11; 3 7 14; 4 7 12; 5 8 41; 6 11 12; 7 15 14; 8 11 47;
9 12 48
31. 10 19 17; 11 17 49; 12 15 50; 13 16 18; 14 15 46; 15 14 12; 16 21
52; 17 22 54
32. 18 18 24; 19 24 21; 20 20 27; 21 27 19; 22 17 28; 23 28 22; 24 23
26; 25 26 16
33. 26 46 11; 27 47 18; 28 48 19; 29 49 14; 30 50 16; 31 41 7; 32 51
20; 33 12 51
20/02/2021
STAAD SPACE -- PAGE NO. 2
20/02/2021
STAAD SPACE -- PAGE NO. 3
P R O B L E M S T A T I S T I C S
-----------------------------------
68. PARAMETER 1
69. CODE INDIAN
70. CHECK CODE ALL
20/02/2021
STAAD SPACE -- PAGE NO. 4
20/02/2021
STAAD SPACE -- PAGE NO. 5
20/02/2021
STAAD SPACE -- PAGE NO. 6
20/02/2021
STAAD SPACE -- PAGE NO. 7
20/02/2021
STAAD SPACE -- PAGE NO. 8
71. PARAMETER 2
72. CODE INDIAN
73. PRINT SUPPORT REACTION LIST 7 8
SUPPORT REACTION LIST 7
20/02/2021
STAAD SPACE -- PAGE NO. 9
74. FINISH
************************************************************
* For technical assistance on STAAD.Pro, please visit *
* http://selectservices.bentley.com/en-US/ *
* *
* Details about additional assistance from *
* Bentley and Partners can be found at program menu *
* Help->Technical Support *
* *
* Copyright (c) 1997-2015 Bentley Systems, Inc.
* http://www.bentley.com *
************************************************************
20/02/2021