PM PC1250SP-8

Download as pdf or txt
Download as pdf or txt
You are on page 1of 25

KOMATSU

PC1250SP-8
PREVENTIVE MAINTENANCE

Presented By :

ROFI’UDIN DAROJAT
TTA Banjarmasin
OUTLINE

RECOMMENDED FUEL, COOLANT, & LUBRICANT


CAPACITY OF FUEL, COOLANT, & LUBRICANT
SAFETY CRITICAL PART
DAILY CHECK (CHECK BEFORE STARTING)
SERVICE PROCEDURE
OIL SAMPLING PROCEDURE
PERFORMANCE TEST & FINAL INSPECTION
RECCOMMENDED FUEL, COOLANT, AND LUBRICANT
CAPACITY OF FUEL, COOLANT, AND LUBRICANT
SAFETY CRITICAL PART
CHECK BEFORE STARTING
INITIAL SERVICE (ONLY AFTER THE FIRST 100 HOURS)
 Clean strainer of PTO lubricating oil filter

INITIAL SERVICE (ONLY AFTER THE FIRST 500 HOURS)


 Change oil in swing machinery case
 Change oil in PTO case
 Change oil in final drive case
WHEN REQUIRED
CHECK, CLEAN AIR CLEANER ELEMENT
WHEN REQUIRED
CLEAN INSIDE COOLING SYSTEM
WHEN REQUIRED
CLEAN INSIDE COOLING SYSTEM
WHEN REQUIRED
CHECK AND TIGHTEN TRACK SHOE BOLT
WHEN REQUIRED CHECK AND ADJUST TRACK TENSION
WHEN REQUIRED CHECK AND ADJUST TRACK TENSION
EVERY 250 HOURS SERVICE
CHECK LEVEL OIL FINAL DRIVE RH LH
CHECK LEVEL OF BATTERY ELECTROLYTE
EVERY 250 HOURS SERVICE
CHECK BOLT TRACK FRAME
EVERY 500 HOURS SERVICE
REPLACE FUEL PRE-FILTER CARTRIDGE

1
EVERY 500 HOURS SERVICE
REPLACE MAIN FUEL FILTER CARTRIDGE REPLACE OIL FILTER CARTRIDGE & CHANGE ENGINE OIL

1 G

G
1
EVERY 500 HOURS SERVICE
REPLACE PILOT FILTER ELEMENT CLEAN STRAINER PTO LUBRICATION
EVERY 500 HOURS SERVICE
REPLACE DRAIN FILTER CARTRIDGE
EVERY 1000 HOURS SERVICE
REPLACE HYDRAULIC OIL FILTER ELEMENT CLEAN HYD TANK RETURN STRAINER

REPLACE BREATHER ELEMENT HYD TANK

ELEMENT BREATHER
1
RETURN STRAINER
EVERY 1000 HOURS SERVICE
CHANGE OIL SWING MACHINERY

SWING MACHINERY FRONT SIDE SWING MACHINERY REAR SIDE


EVERY 1000 HOURS SERVICE
CHANGE OIL IN PTO CASE
OIL SAMPLING

• Mengevaluasi dan mengukur kandungan


logam dan kontaminasi pada oli
• Menentukan secara tepat problem yang
sedang terjadi
PERFORMANCE TEST & FINAL INSPECTION

• Untuk mengetahui performa unit setelah dilakukan maintenance maka dilakukan PPM dan
dituangkan pada check sheet MCR (Machine Condition Report) / QA3