Nothing Special   »   [go: up one dir, main page]

Op-3-74. Checklist For Pull Out Test (Soil Nail) : Work Instructions For Engineers

Download as pdf or txt
Download as pdf or txt
You are on page 1of 5

Section: OP-3-74

G&P GEOTECHNICS SDN BHD


Revision: 0
Date: 12-3-2007
CHECKLIST FOR PULL OUT TEST (SOIL NAIL) Page 1 of 5

WORK INSTRUCTIONS FOR ENGINEERS

LST
Compiled by : _____________________________________

CCM
Checked by : _____________________________________

LSS
Approved by :_____________________________________

OP-3-74. CHECKLIST FOR PULL OUT TEST


(SOIL NAIL)
Section: OP-3-74
G&P GEOTECHNICS SDN BHD
Revision: 0
Date: 12-3-2007
CHECKLIST FOR PULL OUT TEST (SOIL NAIL) Page 2 of 5

CHECKED BY
No. CHECKLIST ITEMS G&P ENGINEER
1.0 NAIL INFORMATION
Type of pull-out test: Preliminary (Verification test)/Working (Proof test)*
* delete wherever not applicable
Nail ID/Location: _____________________
1.1 Length: ____ m (minimum 3m of bonded length)
Design Test Load: ______ kN
Load Cycle: ______ cycles

2.0 INFORMATION PRIOR TO TESTING AT SITE


Is pull out test to be carried out at least 72 hours after grouting of the
2.1
soil nail or achieve minimum 20N/mm2?
At least six (6) numbers of cube samples to be prepared for the 7 days
2.2 and 28 days compression test.
Is the cube result (i.e 7 days) submitted to G&P for review? Yes No

Is the nail installation record(s) reviewed and approved by the Yes No


2.3
consultant?
Are the typical contents of the pull-out test report and loading schedule Yes No
2.4
(sequence) made known to the contractor?
Calibration certificates of the following measuring devices:
a) Pressure Gauge (Hydraulic Jack) - Serial No:______________
The capacity shall be at least 1.2 to 2.0 times maximum test load.
b) Load Cell - Serial No: ________________
2.5 c) Dial Gauges-Serial No: 1)____________ 2)_____________
3) ____________ 4) _____________
d) Data logger (if any) - Serial No: _________________
Yes No
Is the date of calibration of the above measuring devices not
exceeding six (6) months?
The description and layout/cross section of test setup shall be
2.6
submitted for Engineer’s approval prior to testing at site.
Is the pressure gauge and load cell capable of loading up to the
required test loads at site? Confirm with the contractor first before Yes No
2.7
carrying out at site (sometimes it cannot due to setting-up and slope
condition issue)
3.0 SLOPE CONDITION PRIOR TO TESTING
3.1 Localised uneven slope profile shall be trimmed when necessary.
To prevent excessive disturbance to the existing slope, large scale
3.2
slope trimming is prohibited.
If test nail is at higher ground and requiring staging, sufficient bracing
3.3 and strutting shall be fixed to ensure that the staging is rigid and safe
prior to pull-out testing and during monitoring works.
The bearing capacity of the subsoil at the slope is adequate for pull-out Yes No
3.4 test? (Check if it will subside if load increases gradually when load to
the required test load).
Section: OP-3-74
G&P GEOTECHNICS SDN BHD
Revision: 0
Date: 12-3-2007
CHECKLIST FOR PULL OUT TEST (SOIL NAIL) Page 3 of 5

4.0 TESTING SETUP


Seating base for the pull-out test is
a) steel plate b) shotcrete surface c) concrete pad *
* delete wherever not applicable
4.1
Dimension of the seating base: L ( )XB( )XH( )

Independent Reference Beam (IRB) [distance, rigid, IRB legs shall be


4.2 firmly installed, not too close to the soil nail position (minimum distance
1.0m away from the nail position and/or outside the seating base)].
No compressible material between the hydraulic jack and the soil nail
4.4
head.
The seating preparation for the hydraulic jack (pressure gauge) shall be
directly contacted on the seating base. Independently support and
centre the jack over the nail bar so that the bar does not carry the
4.5 weight of the testing equipment.

The contact face should be even and perpendicular to the soil nail
position.
Visually align the dial gauges to be parallel with the axis of test
nail. Sometimes, alignment load (<5% of design test load) is
4.6
required to align the testing apparatus. Dial gauges should be set
to ‘zero’ after the alignment load has been applied.
Check whether the soil nail is in contact with the abovementioned
4.7
seating base. (please refer to Figures below)
Are the adopted pressure gauge, load cell, dial gauges, datalogger (if
4.8 any) similar with the submitted calibration certificates to the consultant?
Check the serial no of the measuring devices prior to start monitoring.
Check and record the seating of the dial gauges and the direction
of the dial gauges’ readings during loading and unloading. This is
4.9 to confirm the reading corresponding to tensile or compression
nail movement. This is important when corrections are necessary
during results interpretation.

5.0 DURING LOAD SEQUENCE, MONITORING AND RECORDING

5.1 Did testing follow loading sequence and its holding period?
Take and record readings before and after load increment/decrement
and record all necessary info. Actual readings of load cell and pressure
5.2
gauge shall be recorded, not the calculated values from the loading
schedule. Refer to Soil Nail Field Record Sheet.
Check the following critical movement:
a) For preliminary pull-out test, 0.8 times steel characteristic strength:
5.3 b) For working pull-out test, creep test (1.5 times working load):
The load during the creep test shall be maintained within 2% of the
intended load by use of the load cell.
For creep test, is the nail movement more than 1mm within the holding
periods of 1 to 10 minutes? If yes, extend to total of 60 minutes and
monitor the movement and check whether more than 2mm in total.
Measure nail movement at 1,2,3,5,6,10,20,30,50 and 60 minutes
5.4 during creep test.
Section: OP-3-74
G&P GEOTECHNICS SDN BHD
Revision: 0
Date: 12-3-2007
CHECKLIST FOR PULL OUT TEST (SOIL NAIL) Page 4 of 5

6.0 REPORT PREPARATION


The following information to be included in the report submission:
a) Introduction
b) Methodology
c) Description of Apparatus
d) Test Procedure (with setting up sketch)
e) Table of the Load Increment / Cycle
f) Summary of Test Results
g) Graphs [Applied Load (kN) vs Deflection (mm) and Applied
6.1 Load (kN) vs Time (min)]
h) Pull out Test Field Record Form (with verification by Site
Supervising Staff)
i) Detail Results of Pull Out Test
j) Datalogger Output (with verification by Site Supervising Staff)
k) Copies of Calibration Certificates
l) Actual photos at site drawing showing the setting-up and
arrangement of the apparatus/instrument adopted for the pull-
out test.
7.0 MISCELLANEOUS
Ensure the following are provided at site:
- Stop watch and clock
- Field recording form
- Loading Sequence
- Bubble level
- Additional dial gauges
- Digital camera

Note: The abovementioned practice should be prohibited as it will produce false result.
Section: OP-3-74
G&P GEOTECHNICS SDN BHD
Revision: 0
Date: 12-3-2007
CHECKLIST FOR PULL OUT TEST (SOIL NAIL) Page 5 of 5

Annulus and seating


plate shall be larger
than grout diameter

Note: Option A is adopted when the nail is fully grouted.

Note: Option B is highly recommended.