Nothing Special   »   [go: up one dir, main page]

Ufford Street, London: Prelim Programme Nr.10

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

Ufford Street,London

Prelim Programme
Nr.10
2019 2020
Jan February March April May June July August September October November December January February March April May
Line Name Duration Start Finish
21 28 4 11 18 25 4 11 18 25 1 8 15 22 29 6 13 20 27 3 10 17 24 1 8 15 22 29 5 12 19 26 2 9 16 23 30 7 14 21 28 4 11 18 25 2 9 16 23 30 6 13 20 27 3 10 17 24 2 9 16 23 30 6 13 20 27 4
26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93
1 BLOCK B - 162 BEDROOMS 58w 11/02/2019 14/04/2020 1

2 Construct Basement 7w 11/02/2019 29/03/2019 2

3 Metsec Frame 15w 01/04/2019 18/07/2019 3

4 Windows 14w 2d 29/04/2019 08/08/2019 4

5 Brickwork 19w 07/05/2019 18/09/2019 5

6 Roofing 7w 4d 08/07/2019 30/08/2019 6

7 Fit-Out (152 Beds) 29w 2d 01/07/2019 05/02/2020 7

8 Finals / Snagging 12w 20/01/2020 14/04/2020 8

9 BLOCK A - 122 BEDROOMS 58w 11/02/2019 14/04/2020 9

10 Basement / Concrete Frame 15w 11/02/2019 30/05/2019 10

11 Metsec Frame 8w 10/06/2019 02/08/2019 11

12 Windows 6w 2d 24/06/2019 06/08/2019 12

13 Brickwork 14w 1d 01/07/2019 08/10/2019 13

14 Roofing 21w 4d 01/07/2019 29/11/2019 14

15 Fit-Out (122 Rooms) 29w 3d 19/08/2019 26/03/2020 15

16 Finals / Snagging 12w 20/01/2020 14/04/2020 16

ACTUAL PROJECT PRELIMS


Supervision
17 Contracts Manager 58w 11/02/2019 14/04/2020 17

18 Site Manager 61w 2d 11/02/2019 08/05/2020 18

19 Engineer 1 58w 11/02/2019 14/04/2020 19

20 Engineer 2 31w 11/02/2019 20/09/2019 20

21 Design Manager 15w 11/02/2019 30/05/2019 21

22 Site Supervisor 58w 11/02/2019 14/04/2020 22

23 Fitout Foreman (Block B) 162 46w 03/06/2019 07/05/2020 23

24 Sangging Forman (Block B) 30w 02/09/2019 14/04/2020 24

25 Fitout Foreman (Block A) 112 11w 4d 08/07/2019 27/09/2019 25

26 Sangging Forman (Block A) 15w 16/12/2019 14/04/2020 26

27 Envelope Foreman 37w 4d 08/04/2019 16/01/2020 27

Watching -
28 Day Gaurd 58w 11/02/2019 14/04/2020 28

29 Guard Out Of Hours 26w 30/09/2019 14/04/2020 29

30 Gateman / Traffic Marshal 58w 11/02/2019 14/04/2020 30

31 Gateman / Traffic Marshall 4w 11/02/2019 08/03/2019 31

32 General Operative (no.1 External) 58w 11/02/2019 14/04/2020 32

Block B
33 General Operative (no. 2) 46w 3d 26/02/2019 14/04/2020 33

34 General Operative (no. 3) 40w 2d 12/06/2019 14/04/2020 34

35 General Operative (no. 4) 45w 2d 14/05/2019 14/04/2020 35

Block A
36 General Operative (no. 5) 37w 2d 12/06/2019 14/04/2020 36

37 General Operative (no. 6) 38w 12/06/2019 14/04/2020 37

38 General Operative (no. 7) 20w 24/10/2019 14/04/2020 38

39 Accommodation 52w 11/02/2019 28/02/2020 39

40 Footpath Charges/Closures 32w 1d 11/02/2019 30/09/2019 40

41 Road Sweeper 6w 11/02/2019 22/03/2019 41

42 Fork Lift / Driver 41w 3d 10/06/2019 09/04/2020 42

43 Total Station ( no. 1) 39w 2d 11/02/2019 27/03/2020 43

44 Total Station (no. 2 ) 14w 11/02/2019 22/05/2019 44

45 Scaffolding 40w 04/03/2019 13/12/2019 45

46 Tower Crane 39w 11/02/2019 15/11/2019 46

47 Driver 41w 3d 23/01/2019 15/11/2019 47


48 Banksman 39w 11/02/2019 15/11/2019 48

49 Mobile Crane 44w 11/02/2019 20/12/2019 49

50 Driver 44w 11/02/2019 20/12/2019 50

51 Banksman 43w 4d 11/02/2019 19/12/2019 51

52 Lift Supervisor 43w 4d 11/02/2019 19/12/2019 52

53 Builders Clean 25w 3d 23/09/2019 01/04/2020 53

26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93
21 28 4 11 18 25 4 11 18 25 1 8 15 22 29 6 13 20 27 3 10 17 24 1 8 15 22 29 5 12 19 26 2 9 16 23 30 7 14 21 28 4 11 18 25 2 9 16 23 30 6 13 20 27 3 10 17 24 2 9 16 23 30 6 13 20 27 4
Line Name Duration Start Finish
Jan February March April May June July August September October November December January February March April May
2019 2020
Ufford Street
Block B Block A Present Planned Services Extra
Drawn by: Planner - Dheeraj Kumar Issue Date: 25/01/2019 Revision No. A Rev Date: 25/01/2019
Planned by Asta Powerproject
Project Ref. C:\Users\kumard\OneDrive - Gilbert-Ash Ltd\Asta Powerproject\Projects\465 - NYM Ufford Street\Prelim Programme\Final Prelim Programme_01-10-2019.pp