Hazard Identification 2. Risk Assessment
Hazard Identification 2. Risk Assessment
Hazard Identification 2. Risk Assessment
RISK ASSESSMENT
3. RISK CONTROL LEGAL DUE COST
PIC
DATE
HAZARD LIKE- SEVE- RISK CONSE- RISK
NO WORK EFFECT LIHOOD RITY SCORE QUENCE RATING
. ACTIVITY ANTICIPATED
1 Children Acute Effect: 5 3 15 Serious HIGH Elimination
playing in Limbs stuck in the Cut and 1. Eliminate the broken tube
the tube broken tube slides bruises slide
slides (Physical Hazard)
Chronic Substitution
Effect: 1. Use straight slide instead LANDSCAPE
Broken bones of tube slide because the PLANNING AND
and spiral children cannot be seen OPERATION
fractures inside the tube slide DIVISION
Engineering control
1. Do regularly maintenance
once in 6 months
2. Surrounded the broken
part with caution tape
Administration control LANDSCAPE
1. Do inspection on the DEVELOPMENT
playground once in 6 AND
months RECREATION
2. Close the area for DIVISION
maintenance
3. Ensure your child for not PARENTS
wearing or playing with
anything that could get
caught on equipment
4. Ensure your child did not
play at the broken slides
5. Parents must check the
equipment before let the
children play
Personal protective equipment
1. Shoes or slipper
2. Use proper clothes
PARENTS