E-Circular: Pradhan Mantri Awas Yojana Credit Linked Subsidy Scheme (CLSS)
E-Circular: Pradhan Mantri Awas Yojana Credit Linked Subsidy Scheme (CLSS)
E-Circular: Pradhan Mantri Awas Yojana Credit Linked Subsidy Scheme (CLSS)
Dear Sir/Madam,
Please refer to our e-circular no. NBG/RE-HL/42/2015-16 dated 24th February, 2016
advising the details of Credit Linked Subsidy Scheme (CLSS) under Pradhan Mantri
Awas Yojana.
2. Ministry of Housing and Urban Poverty Alleviation (MoHUPA) has recently issued
certain clarifications in respect of maximum tenure of the loan, ownership of the
proposed house/flat, carpet area of the house/flat, etc. under Credit Linked Subsidy
Scheme. Based on the clarification issued by Ministry, our operational guidelines
under Credit Linked Subsidy Scheme have been revised suitably. The revised
guidelines under CLSS will be as under:
1
• The residence of the borrower and also the location of the housing property
proposed to be acquired/constructed should be located in 4041 statutory
towns (list of eligible towns are uploaded in SBI Times->Department 2->
REHBU->PMAY).
• The credit linked subsidy is available for loan amount upto Rs. 6 lacs.
However, loan above Rs. 6 lacs may be sanctioned to the eligible customers
but the subsidy will remain available for loan amount upto Rs. 6 lacs only.
• The ownership of the house should either in the sole name of the female
member of the household or joint ownership with the wife. However, this
condition will not be made mandatory in cases of construction of house on an
existing plot or extension/renovation of existing Kuccha/Semi-pucca house.
• The EWS/LIG beneficiaries under this Scheme have been defined as under:
2
• Subsidy will be disbursed maximum in 4 installments in proportion to the
disbursements made in loan account. Bank will directly credit subsidy amount
to beneficiary’s loan account which will effectively reduce loan amount of the
beneficiaries.
• EMIs for Home Loan borrowers under CLSS will be reset on full disbursement
of loan and credit of full subsidy amount in the account.
• The borrower has to complete the construction of house or to take possession
of the house within a period of 36 months. CPCs/Branches shall have to
submit a consolidated certificate on completion of the housing unit along with
digital photograph of borrowers with the financed house property within one
year period from the completion of construction or a maximum of 36 months
from the date of the disbursement of the 1st installment of the loan amount. In
case of default in not providing completion certificate by the CPCs/Branches
within stipulated period, Bank will require to recover the subsidy amount
already released for refund to the Government of India.
• In the event of default in repayment of the loan by the borrowers and the loan
becoming NPA, the CPCs/Branches will proceed for recovery of the dues
through appropriate recovery measures. In all such cases, the recovery will be
charged to the subsidy amount on a proportionate basis (in proportion to the
loan outstanding and subsidy disbursed).
• The other eligibility criteria viz. EMI/NMI norms, LTV norms etc. and other due
diligence norms stipulated under our Home Loan Scheme will continue to be
complied with while handling Home Loan proposals under CLSS.
3. The loan accounts sanctioned on or after 17.06.2015 to the borrowers who are
complying with the eligibility norms stipulated under CLSS may also be covered
under this Scheme. CPCs/Branches are required to scrutinize all such accounts and
submit the subsidy claim form on prescribed format enclosed as Annexure-‘B’ in
respect of eligible borrowers to REH/PBBU Department of the Circle. The product
codes for such accounts should also be changed accordingly. The detailed SOP,
process for claim of subsidy, etc. has been uploaded in SBI Times->Department 2->
REHBU->PMAY.
Yours faithfully,
(Vaijinath M.G.)
Chief General Manager (REH)
3
Annexure-‘A’
Dear Sir,
2. The details of other family members (above 18 years age) excluding borrower/co-
borrower and with maximum of 4 members in the descending order of age are as
under:
i) Name 1:_________________________________
Unique Identification Proof Type and Number [Aadhaar/Voter’s
Card/PAN Card/Passport No.]:____________________________
ii) Name 2:________________________________
Unique Identification Proof Type and Number [Aadhaar/Voter’s
Card/PAN Card/Passport No.]:___________________________
4
iii) Name 3:__________________________
Unique Identification Proof Type and Number [Aadhaar/Voter’s
Card/PAN Card/Passport No.]:___________________________
iv) Name 4:_______________________
Unique Identification Proof Type and Number [Aadhaar/Voter’s
Card/PAN Card/ Passport No.]:________________________
3. I understand and accept that if at any stage, it is found that the information given
by me is false/not true, all benefits given to me under the schemes would be
withdrawn and legal action as deemed fit, would be taken against me.
Yours faithfully,
*The beneficiaries have been defined as a family comprising of husband, wife and unmarried
children. Only the spouse and unmarried children will be permitted to join the loan as co-
borrowers/guarantors.
5
Annexure-‘B’
Format to be submitted by CPC/Branch for claiming subsidy under CLSS
6
23. Complete postal address of property with PIN Code:
a. Address1 (Plot/House/Flat/Door No. & Street etc):
b. Address2 (Locality Colony Name):
c. Address3 Place Name (City/Taluq/Village):
d. Address4 (Pin-code):
24. Stage of Construction [ Yet to Start (00), Ground Level(01), Plinth Level(02),
Roof Level(03), Finishing Stage (04), Superstructure Completed(For multi-
storey only) (05), Completed(06)]:
25. Ownership mode (only in case of enhancement). Whether
• Self-Owned
• Inherited
26. a) Loan Amount: b) Loan Account No.:
27. Purchase of Loan (For purchase/construction/extension):
28. Tenure of Loan:
29. Housing Loan Interest:
30. Moratorium Period if any:
31. Repayment Start Date[DD-MM-YYYY format]:
32. Subsidy Claim No. [Single Installment -00, Multiple Installments –Respective no.]
• Loan amount disbursed for this claim (in Rs):
33. Source of the application (whether direct/ULB/NGO/Developers):
We confirm that the account is eligible for subsidy under CLSS scheme in
terms of extent instructions.
Stamp
Dated:
(Strike out whichever is not applicable)