Slab (t):
Use t = 0.14 m
DEAD LOADS
ROOF:
Slab: 3.304
ROOD DECK:
Ceiling:
Gypsum Board(10mm) 0.08
Mechanical Duct Allowance 0.2
Electrical Fixtures 0.18
Slab: 3.304
Total: 3.764
Ceiling:
Gypsum Board(10mm) 0.08
Mechanical Duct Allowance 0.2
Electrical/Mecahnical Fixtures 0.18
Slab: 3.304
Slab Finishes:
Ceramic Tile 1.1
Total: 4.864
Partitions:
CHB (150mm) 2.68
CHB (100mm) 2.61
Glass(12mm) 0.681
Partition load: 1
Railings: 0.5
Elevator load
735.75 N/m^2
1.4715 KN/m^2
LIVE LOADS EARTHQUAKE LOADS
Unit
ROOF: 1 kpa ROOF:
Unit ROOF DECK: 1 kpa
3rd Floor:
kpa Offices 2.4 kpa
2nd Floor:
Stores (Retail) 4.8 kpa
kpa
kpa
kpa
kpa
kpa
kpa
kpa
kpa
ROOF DECK:
kpa
kpa
kpa
kpa
kpa
kpa
kpa
kpa
kpa
kpa
3rd FLOOR:
2nd FLOOR:
EARTHQUAKE LOADS
Weight of Beams:
102.6895 KN Seismic Parameters:
Slab
3.304 KN Zone IV
Partitions: Soil Profile Type: Sd
197.784 KN Nv= 1
Cv= 0.64*Nv 0.64
Volume of Columns: R 3.5
V 2.304 m^3 Iw 1
Ct 0.0731
Weight of Columns Na 1
54.3744 KN Ca 0.44
Total W roof: 358.1519 KN T=Ct*(hn)^0.75 0.471
Z 0.4
Volume of Columns:
V1 4.224 m^3
V2 7.2 m^3
V(total) 11.424 m^3
Weight of Columns
269.6064 KN
Others:Water Tank 171.675 KN
Area: 677.7
Volume of Beams:
V1 38 m^3
V2 6 m^3
V3 21.6 m^3
V5 5 m^3
V6 7.6 m^3
V(total) 78.2 m^3
Weight of Beams:
1845.52 KN
Slab,Finishes,Ceiling:
3296.333 KN
Partitions:
CHB (150mm)
234.5 KN
CHB (100mm) 221.85 KN
Glass(12mm) 231.54 KN
Partition: 120 KN
Railings 58.465 KN
Volume of Columns:
V1 18.24 m^3
V2 2.4 m^3
V(total) 20.64 m^3
Weight of Columns
487.104 KN
Area: 677.7
Volume of Beams:
V1 38 m^3
V2 6 m^3
V3 24 m^3
V5 5 m^3
V6 7.6 m^3
V(total) 80.6 m^3
Weight of Beams:
1902.16 KN
Slab,Finishes,Ceiling:
3296.333 KN
Partitions:
CHB (150mm)
234.5 KN
CHB (100mm) 221.85 KN
Glass(12mm) 231.54 KN
Partition: 120 KN
Railings: 69.095 KN
Volume of Columns:
V 23.04 m^3
Weight of Columns
543.744 KN
Unit
KN
KN
KN
KN
se Shear:
6829.134
5528.397 KN (Use as V)
851.3732
1608.261
DEAD LOADS
Roof:
Unit
Roof Deck:
Ceiling:
Gypsum Board(10mm) 0.08 kpa
Mechanical Duct Allowance 0.2 kpa
Electrical and Plumbing Allowance 0.18 kpa
kpa
Water Tank:
Total People to serve: 250 pax
Daily Water requirements/pax: 135 Lpcd
Volume water needed: 250 x 135 = 33750 Liters
33.75 cu.m
Water Tank Type: SRP- 4000
Capacity: 17500 L
17.5 cu.m
Quantity: 2 tanks
Total Wei17.5 m^3 x 9.81 KN/m^3 171.675 KN
Ceiling:
Gypsum Board(10mm) 0.08 kpa
Mechanical Duct Allowance 0.2 kpa
Electrical and Plumbing Allowance 0.18 kpa
Slab: 23.6 KN/m^3 x 0.120m= 2.832 kpa
Slab Finishes:
Ceramic Tile 1.1 kpa
LIVE LOADS
1 kpa
Roof: 1 kpa
Roof Deck:
3rd Floor: 2.4 kpa
Offices
2nd Floor: 4.8 kpa
Stores (Retail)
With reference to Appendix (), the Dead Loads for corresponding floor levels:
Weight of Columns
23.6x20.64
Total W 2nd Floor:
ROOF DECK:
ROOF WEIGHT:
Area:
Volume of Beams:
V1 0.3mx0.2mx6mx4
V2 0.3mx0.2mx6mx5
V3 0.3m x0.25mx2.5m x2
V4 0.35mx0.25mx2.15x2
V(total)
Weight of Beams:
Slab
23.6 X 0.14
Partitions:
2.68kpa x 1.8 x 41
Volume of Columns:
V
Weight of Columns
Total W roof:
Area:
Volume of Beams:
V1 0.35mx0.4mx5mx30
V2 0.35mx0.4mz6mx18
V3 0.35mx0.4mx2.5mx10
V4 0.35mx0.4mx6mx4
V5 0.5mx0.5mx6
V(total)
Weight of Beams:
Slab &Ceiling:
3.764 x 491.8
Partitions:
CHB (150mm)
2.68kpax2mx10m=
2.68kpa x0.75m x96m=
2.68kpa x1.25mx20m=
Volume of Columns:
V1 0.4mx0.4mx3.3mx8
V2 0.4mx0.4mx1.5mx3
V(total)
Weight of Columns
23.04 m^3
Level Height Weight WiHi Cvx Force
543.744 KN 3 9.2 4470.881 41132.1 0.403243 2210.267
2 6.2 6456.382 40029.57 0.392434 2151.021
6513.022 1 3.2 6513.022 20841.67 0.204323 1119.944
Total 102003 5481.232
Summary:
Level No.of columns (x) No. of columns (z) Force
38 m^3 3 38 38 2210.267
4.8 m^3 2 48 48 2151.021
24 m^3 1 48 48 1119.944
5 m^3
4.3 m^3
2.4 m^4
1.5 m^5
76.1 m^3
1795.96 KN
3296.333 KN
234.5 KN
221.85 KN
231.54 KN
120 KN
69.095 KN
18.24 m^3
2.4 m^4
20.64
487.104 KN
6456.382
99.9 m^2
1.8
1.8
0.375
0.37625
4.35125 m^3
102.6895 KN
3.304 KN
197.784 KN
2.304 m^3
54.3744 KN
358.1519 KN
491.8 m^2
21 m^3
15.12 m^3
3.5 m^3
3.36 m^3
1.5 m^4
44.48 m^3
1049.728 KN
1851.135 KN
53.6 KN
192.96 KN
67 KN
170.314 KN
110.925 KN
115.77 KN
60 KN
4.224 m^3
7.2 m^3
11.424 m^3
269.6064 KN
171.69 KN
4470.881 KN
F(x)/colu F(z)/column
58.16492 58.16492
44.81294 44.81294
23.33217 23.33217
Seismic Parameters:
**(NSCP 2015 References)
With reference to Appendix (), the Dead Loads for corresponding floor levels:
Area: 491.8
Slab &Ceiling:
3.764 x 491.8 1851.135
Partitions:
CHB (150mm)
2.68kpax2mx10m= 53.6
2.68kpa x0.75m x96m= 192.96
2.68kpa x1.25mx20m= 67
170.314
CHB (100mm) 2.61kpax1.55m8x41m= 110.925
Glass(12mm) 0.681kpax1.25mx136m= 115.77
Partition: 1kpax1.25mx48m = 60
m^2 Summary:
Level No.of columns (x) No. of columns (z) Force F(x)/column
KN 3 38 38 1458.158 38.3725713
KN 2 48 48 1383.097 28.8145306
KN 1 48 48 713.8568 14.8720158
m^2
KN
KN
KN
KN
KN
KN
KN
KN
KN
KN
F(z)/column
38.3725713
28.8145306
14.8720158