1 PDF
1 PDF
1 PDF
CV GV WATER
SEWER
TR
FD
SH
VS
TR
VS
1. ALL PLUMBING WORKS INCLUDED HEREIN SHALL BE EXECUTED ACCORDING TO THE
CO
CO
LAV
PROVISIONS OF THE PLUMBING CODE AND THE NATIONAL BUILDING CODE.
E
LIN
WC
GUEST ROOM LIVING AREA VS
TR
RO
OF
SOIL
RISER
DS
TO
RM
PIP
E
2. COORDINATE THE DRAWING WITH OTHER RELATED DRAWINGS AND SPECIFICATION.
PORCH
CS
SERVICE AREA
1/2" DIA. WATER LINE
PV
2"
ON
Y THE ENGINEER SHALL NOTIFIED IMMEDIATELY OF ANY DISCREPANCY FOUND THEREIN.
C
UP
BAL RT
O
EN RP 3. ALL PIPES SHALL BE INSTALLED AS INDICATED ON PLANS. ANY RELOCATIONS
OP TO OW CA
L
BE M REQUIRED FOR PROPER EXECUTION OF OTHER TRADE SHALL BE PRIOR APPROVAL OF THE
HB
R OO
ED
E
RO
OF
LIN
E
S T DS
DIRTY KITCHEN KS KS
MA
LC
DRAIN WATER SOIL HB
M1 WN
WCR LINE CO L
TE
AV
4. PROPOSED SANITARY UTILITIES SHALL CONFORM TO THE ACTUAL LOCATION, DEPTH
OO
RISER RISER RISER
DC WA
DO
"D
IA. FD EIP
R EP
AND INVERT EXECUTION OF ALL EXCAVATION OF ALL EXISTING PIPES AND STRUCTURE
1/2" DIA. WATER LINE 1/2" DIA. WATER LINE 1/2
CB CB CB ST
BED
LC A
4" PVC WASTE PIPE 4" PVC WASTE PIPE
DS PIP
E SH PV
CW
RMAIN 4"
CO 6" PVC SOIL PIPE 6" PVC SOIL PIPE TO DRRISER
C STER
INE PV BT E
TAP TO DS
E
CB 4" PVC WASTE PIPE
PUBLIC
V CS
OIL
PIP
ER
ILRIS
"P
SO
PLUMBING LAY-OUT TO
TAP UBLIC R
P EWE
S 6. ALL SLOPES FOR HORIZONTAL DRAINAGE SHALL MAINTAIN 1% UNLESS OTHERWISE
1 GROUND FLOOR PLAN
M
INE
HB 4"
PV
PO
DS DS
CH R
CA
LC
INE
WORKS WITH THE SEWER LINE EFFLUENT DISPOSAL POINT AND WATER LINE SERVICE
RL
R
.W
A TE
PO
EA
"D
IA LC
2" PVC STORM PIPE 2" PVC STORM PIPE 1/2
DC PIP
E
ING
FD SH STE
WA
1/2" DIA. WATER LINE
PVC
LIV
4"
IPE
A
RE
P
TE
AS
CO
OPEN 4"
PV
CW
A
ING
HB
LAV
TO CB
CB 9.ALL PIPES SIZE ARE IN METERS AND ALL DIMENSIONS ARE IN METERS UNLES OTHERWISE
DIN
6" PVC SOIL PIPE
WC
BEDROOM 1 BELOW
AI SPECIFIED.
BALCONY
INE
RISER
SOIL
RL
N LAN
UP WA
TE
OM HE
IA.
"D
1/2
C
IL
RO
SO ER
RIS
INE
KIT
R
L TE
WARISER E
ER PIP
AT OIL
ST
.W
AIN
CS
DR ER
RIS
DIA PV
"
KS
1/2
E EP
IPE
6"
10.ALL PIPES SIZE INDICATED ON PLANS ARE NOMINAL SIZES (INSIDE DIAMETER).
GU
TER
WARISER KS A ST
DOWN CW
CB
AIN
DR ER
RIS
P V
4"
SH
FD CO LAV
WC CB
MASTERS BEDROOM N
CO
ER
LIN
SO
E
IL RIS
KS
IT C HE LEGEND :
YK
R
TE
A WA
IA. KS INE
RE 1/2
"D
T TE
WA TE
R L IPE
P
DIR
E
WC EA "D
IA. WAS
1/2 " PVC OIL
PIP
FD CO
LAV
VIC R HB
4
6"
P V CS
ABBR. DESCRIPTION
BT
4" PVC WASTE PIPE
SE
CB
2" PVC STORM PIPE
2" PVC STORM PIPE
CO
F FAUCET CB CATCH BASIN
CARPORT LF LAVATORY FAUCET
DS DS SV SEPTIC VAULT
ROOF LINE ROOF LINE HB HOSE BIBB MH MAN HOLE
SH SHOWER HEAD CO CLEAN OUT
KF KITCHEN FAUCET FD FLOOR DRAIN
WC WATER CLOSET SD SHOWER DRAIN
PLUMBING LAY-OUT
2 SECOND FLOOR PLAN 3
___________________________________ ISOMETRIC LAY-OUT LAV
KS
LAVATORY
KITCHEN SINK
GV GATE VALVE
______________________________________ CV CHECK VALVE
PL 1 NOT TO SCALE
VSTR VENT STACK THRU ROOF
PL 1 SCALE 1:100 MTS M WATER METER
VSP VERTICAL STACK PIPE
SANITARY LINE
DS DOWNSPOUT WATER LINE
CO MH MH
DRAINAGE LINE
AIR SPACE
0.4
0.5
2000
COMPACTED GRAVEL
4" PVC PIPE EFFLUENT PIPE
PLAN SECTION
PLAN SECTION 3-12 mm Ø LONG 'L. BARS W/
12 mm Ø BARS @ 0.10 M O.C
BOTHWAYS 10 mm Ø TIES @ 0.30 m. 5 CATCH BASIN DETAILS
______________________________________
PL 1 SCALE 1:10 MTS
4
______________________________________ SEPTIC TANK DETAILS
PL 1 SCALE 1:40 MTS