3G - DUW - Configuration - With - RBS6201 - 6102 - Using RRUs-1
3G - DUW - Configuration - With - RBS6201 - 6102 - Using RRUs-1
3G - DUW - Configuration - With - RBS6201 - 6102 - Using RRUs-1
Finally; you will receive a message telling you that both cabinet and site equipment is
successfully deleted and cabinet resources got locked.
Check the Led indicator of the DUW; the maintenance indicator should be “Steady ON”.
2- From “Tools” Menu , choose “cabinet equipment Configuration”
3- Run “Cabinet equipment configuration wizard manually” not “Automatic”.
4- Wait for cabinet equipment wizard to load Configuration data from DUW.
5- Now; Choose only RBS product name as RBS 6201V2W and don’t check or choose anything else
as in below picture.
6- Click “Next”.
7- Choose “EC bus Port for DUW” as in below Picture.
Very Important Note:
Don’t forget to define the EC hub position for DUW as an external
Secondary node in the Primary DUG.
For Example:
8- Click “Next”.
9- Now , supply IPs for Ethernet Link as follows :
o IP Address : 169.254.1.1 “Default IP address” .
o Subnet Mask: “255.255.0.0” “Default Subnet Mask”.
o Default router : ”TCU MUB IP Address”.
10- Click ”Next”.
11- Review the configuration you’ve supplied and then click “Finish”.
12- Click “yes” in the Configuration confirmation message to confirm Node restart after activating
the configuration.
13- Wait for Cabinet configuration wizard to activate the configuration you have made.
14- After the wizard applies all the configuration successfully, the Element manager will exit and
the DUW will restart.
15- All the DUW led indicators will flash at once, then the “Operational” led indicator will start to
flash fast … wait until the “operational” led blink slowly and then connect again to DUW to RUN
“O&M access configuration” wizard.
16- After finishing the O&M access configuration, it’s time to supply the”Site Equipment
Configuration”.
20- Input Site Name and Site Logical Name as provided in the site equipment script.
21 – Don’t check any Options in “Optional Equipment configuration window”, leave all options
unchecked.
22- The EC Bus configuration window will appear again with the same configuration as made in
cabinet equipment configuration wizard, just click “Next” to proceed to next configuration
window without making any changes to EC Bus hub position.
23- In Sector options we use the following configuration :
27 – Start Creating Cells for each sector according to the configuration you have and supply
cells IDs according to the data you have from integration team.
28-input the antenna and RF system configuration as supplied in the site equipment script for
all sectors and when you finish click ”Next”.
29-input the Frequency Edges as acquired from Integration team for all sectors and then click
”Next”.
30- Input all Attenuation and Delay parameters for all sectors as” Zero” and then click “Next”.
31- Leave the Parameters of HSDPA and EUL configuration unchanged and click “Next”.
32-Make a Final review for all the parameters you have supplied and when they are found to be
as Planned; press ”Finish” to execute the configuration changes.
33- When site configuration wizard finishes updating site equipment parameters successfully ,
press “OK” and create a configuration version “CV” and name it “aftersiteequipmentconfig” ,
also set that CV as “startable” and add it to ”rollback list as number 1”.
35- After cabinet is reloaded, check the alarms from alarm list, you should only have license
alarm because the local license is not yet installed.
36- Call the 3G integration team to verify the connectivity and Synchronization of the site and to
continue the configuration from RNC side.