CE 312 (Building Design 2)

University of the Cordilleras Plumbing Layouts


FINAL PLATE REFERENCES

1 |1 1
CE 312 (Building Design 2)
University of the Cordilleras Plumbing Layouts

FIRST FLOOR PLUMBING LAYOUT

2 |1 1
CE 312 (Building Design 2)
University of the Cordilleras Plumbing Layouts

SECOND FLOOR PLUMBING LAYOUT

3 |1 1
CE 312 (Building Design 2)
University of the Cordilleras Plumbing Layouts

FIRST FLOOR WATER LAYOUT

4 |1 1
CE 312 (Building Design 2)
University of the Cordilleras Plumbing Layouts

SECOND FLOOR WATER LAYOUT

5 |1 1
CE 312 (Building Design 2)
University of the Cordilleras Plumbing Layouts

PLUMBING ISOMETRY

6 |1 1
CE 312 (Building Design 2)
University of the Cordilleras Plumbing Layouts

STORM DRAINAGE PLAN

7 |1 1
CE 312 (Building Design 2)
University of the Cordilleras Plumbing Layouts

STORM DRAINAGE PLAN

8 |1 1
CE 312 (Building Design 2)
University of the Cordilleras Plumbing Layouts

100 mm 100 mm

CLEAN OUT INSTALLATION DETAILS

9 |1 1
CE 312 (Building Design 2)
University of the Cordilleras Plumbing Layouts

CATCH BASIN DETAIL

10 |1 1
CE 312 (Building Design 2)
University of the Cordilleras Plumbing Layouts

SEPTIC TANK DETAILS

11 |1 1