Typical Inspection Plan (TIP) Index: Project Inspection Division / IAG
Typical Inspection Plan (TIP) Index: Project Inspection Division / IAG
Typical Inspection Plan (TIP) Index: Project Inspection Division / IAG
Sub
Re
Number
Index
page 1 of 5
Project Inspection Division / IAG
Typical Inspection Plan (TIP) Index
General Notes:
1-Contractor is required to submit its own ITP(s) for Saudi Aramco review and approval prior proceeding for subjects not
covered by the following SATIPs,
2- For activities (checklists) missing in any of the SATIPs provided by Saudi Aramco, Contractor may add that particular
activity and submit the revised SATIP(s) for Saudi Aramco review and approval prior proceeding with the task.
Form Type
Sub
Re
Number
Index
Sub
Re
Number
Index
Sub
Re
Number
Index
Sub
Re
Number
Index
*SATIP was generated by Saudi Aramco for this subject with input from the subcontractor in the field and is now availabl in the field.
Please contact the field personnel regarding this issue (Apllicable to Hawiyah project only)