RESUME

BE ELECTRICAL WITH 16 Years of Experience in Operation, Maintenance


& Project Works, preferably in Captive Thermal Power Plants, Paper and
Chemical Industries, Solar Projects and Substations. Open to similar
positions in other industries steel, aluminium or cement industries and
ready for relocation anywhere in India & Abroad.
Orient Paper and Industries Ltd, PO-O.P.M, Amlai, DT-Shahdol (M.P)-484117
Email:rschji@gmail.com, rscpower@rediffmail.com
Mob : 07987465557, 06265917196, 08982602962.

CORE COMPETENCIES

Operation, Maintenance, Project Planning, Implementation and Erection & Commissioning of

 Project (Erection & Commissioning) and 5Years of O&M experience of 35 & 25MW Captive
Power Plants.

 Erection and Commissioning and 14Years of O&M experience 132KV Substation and 11KV HT
Systems with 132KV CGL SF6 Breakers, 11KV ABB SF6 Breakers, 11KV ABB HT Panels, MCCs,
UPS, Battery Chargers, 320KVA DG Sets, 11KV HT Capacitor Banks for Power Factor
Improvement and harmonic mitigation of 11KV .

 Erection and Commissioning of 50MW Grid Connected Solar Power Plant at Mandsaur, Madhya
Pradesh by M/s Vikram Solar as Project Engineer under Birla Technical Service.

 Erection Commissioning and 14Years of O&M Experience of 100TPD Paper Machine Voith,
Tissue Paper, High Current Rectifier Systems of ABB/KORI -90KA, 180V DC (DSS) and 20KA,
600V DC(DB) with ABB AC800PEC Controller for Electrolysis in Chlor-alkali Industries.

 Installation, connection and setting of AREVA Micom Series P120, P632, , P141, P343, P441,
P125 Numeric Relays and SIEMENS Siprotec Series Relays.

 Installation, Commissioning testing and maintenance of 20MVA 132KV/11KV Power


Transformers and 2X10.822MVA 12Phase Rectifier Transformers.

 Programming of Siemens SIMATIC S7 300 PLC and YASKAWA MPE720.

 Installation, commissioning and maintenance of AC Variable Frequency Drives of SIEMENS/ABB


/CROMPTON for 3Phase AC Induction Motors 5KW to 325KW.

 Installation, commissioning and maintenance of SIEMENS Smart Motor Controllers SIMCODE PRO
3UF7.
 Proficient in driving operations and Proactive and Preventive Maintenance activities including,
planning, maintenance management as per ISO 9001:2015, Budgeting, Cost Control as per SAP
Platform.
 Track record of achieving minimum breakdowns and delivering projects in time as per TPM, PMS ,
Root Cause Analysis, WCM and KAIZEN.
 Management Representative of EnMS 50001:2018 and Implementation of PAT Targets-Cycle IV.
 Emerson Delta-V DCS System.
 Ability to oversee quality assurance and quality control programs.
 Comprehensive understanding of electrical systems.
 Trained Lead Auditor of ISO 9001:2015, OSHAS 18001, EnMS 50001:2011 and RC 14001.
EDUCATIONAL CREDENTIALS
BE (ELECTRICAL) with 78% from Govt Engineering College Bilaspur in 1998.
HIGHER SECONDARY from MP BOARD BHOPAL with 79% in 1993-94.
Possess Valid Industrial Electrical Supervisory License (M.P).
Certified BEE Energy Manager EM-9204.
Pursuing MBA-Operation and Maintenance through distance learning IGNOU

CAREER PATH
Presently Associated with ORIENT PAPER AND INDUSTRIES LTD, Shahdol (M.P) since April 2016
as Manager Electrical. Reporting to VP (Works) and President.

April 2013- April 2016 Dy.Manager Electrical.


April 2010 April 2013 Sr Suprintendent
April 2007- April 2010 Sr. Electrical Engineer

SOUTH ASIAN PETROCHEM LTD, Haldia(W.B)


April 2002- April 2005 Asst Electrical Engineer

LLYOD STEEL INDUSTRIES LTD.


April 1999- April 2002 Electrical Project Engineer

HIGHLIGHTS OF MAJOR PROJECT WORKS

 Project Experience of Captive Power Plant of 35/25 MW having M/s Thermax FBC 150TPH
Boiler, Siemens Turbine (SST-150 103 bar, 505ºC, 13300RPM )Make Turbine and ABB Alternator
20MW/25MVA 11.0KV 1500RPM, 50Hz TC 145 Alternator.

 Single handed completed 132KV Substation Project with complete erection and commissioning
of 15MVA VOLTAMP TRANSFORMER, 132KV CROMPTON MAKE SF6 Breaker, 145KV ELPRO
HDB Isolators, Surge Arrestors, 132KV Current Transformers, Potential Transformers, 132KV
Control Panel with Digital ALSTOM Make MICOM Series Protection Relays, MD Controller
Panel, interlocking schemes of control circuit, tower erection and stringing of ACSR Panther
Conductor from MPPKVVCL to 132KV Substation-11Km.

 Commissioning, Operational and Maintenance Experience of 90KA, 180V DC ABB High Current
Thyristor Rectifier for Membrane Electrolysers having 84 Thyristors with FMU, OVP and AC
PEC 800 Control System. 21MVA EMCO 12 Phase Transformer consisting of auto transformer,
two 6 Pulse Transformers Yn y0y6 & Dn y1y7 arrangement with Inter Phase Transformers,
MICOM P141 Feeder Protection Relay and SIMATIC S7 300 Siemens PLC.

 Erection and Commissioning of 50MW Grid Connected Solar Power Plant at Mandsaur Madhya
Pradesh by M/s Vikram Solar as Project Engineer under Birla Technical Service.

PV Modules-PV Multi Crystalline Solar Modules, Canadian Solar CSX-300P, Nominal Power
300WpTotal Modules- 1,66,668Nos, Module Area- 12792280 Sq m..
Inverters- Sunny Central 1000CPXT, Inverter Rating 1000KW, 50Mos, MPPT Voltage Range 596-
850V.

220KV Switchyard- 2Nos 75MVA 66/220KV Step Up Power Transformers with CTs. PTs, Breakers,
Isolators, LAs, HT Panels and Protecting Relays, Annual Solar radiation- 2008Wh/m2.
 Overhauling of 21MVA EMCO 12 Phase Rectifier Transformer and 90KA/180V DC 12 Phase HCR
checking of thyristors DCR1474SY15 3600A, pulse strength measurement by hand held
oscilloscope, replacement of OVP, FMU and Varimat Z with AC PEC 800 Control System.

 Overhauling and maintenance of 132KV SF6 Breaker with CROMPTON Service representative and
conducted all tests i.e contact resistance checking, pole travel velocity, replacement of main spring,
trip and close coil with plunger.

 HT Capacitor Banks for Power Factor Improvement and harmonic mitigation of 11KV System i.e
5MVAR with 5th, 7th, 11th and 13th Harmonics Filter Banks, 1MVAR, 2MVAR, 3MVAR Capacitor Banks
with reactors and residual voltage transformers for neutral displacement relays. Carried on Harmonics
Analysis of the system with UNISTAR CAPACITORS Satna.

 11KV HT Panels of 11KV Substation with ABB Make SF6 Breakers and ABB SPAJ Series digital
protection relays. Complete maintenance of 12KV SF6 Circuit Breakers up to 2000Amps, 500MVA of
Crompton, ABB and Kirloskar Make, 15MVA Power Transformers and Plant Auxiliary Transformers.

 Complete overhauling, testing and maintenance of HT Motors Kirloskar Make 2100KW, 6.6KV, 4 Pole
DM Water Cooler Horizontal Motor for Boiler Feed Pump and 3 Phase 415V LT Induction Motors form
1.5KW-250KW of SIEMENS /ABB/KIRLOSKAR/CROMPTON/BHARTAT BIJLEE Make. Guided all
activities of motor overhaul i.e winding resistance measurement, IR and PI Value, drying and re-
varnishing, greasing, bearing life assessment by T-200, rotor lost contact test, vibration analysis and
alignment.

TRAINING/SEMINARS UNDERGONE

 One week training of Siemens AC Drive SIMOVERT MASTERDRIVE.


 One week training of Siemens PLC SIMATIC S7 300.
 Two Days seminar on SIEMENS SMART MOTOR CONTROLLERS SIMCODE PRO 3UF7.
 Training on Programming AC 800PEC Controller ABB.
 Electrical Diagnostic Testing of Transformers, HT Induction Motors by ERDA.
 Internal Auditor and Lead Training on ISO 9001:2015, ISO 14001: 2004 and OHSAS 18001:2007 &
EnMS 50001:2011 and RC 140001 by RINA.

FAMILY STATUS

Shri. S, Chakravorty (Father) 65Years Retired Railway Officer.


Smt . Meera Chakravorty (Mother) 57Years House Wife.
Sumita Chakravorty (Wife) 29Yeras Teacher(Primary School)

PERSONNEL DETAILS

Date of Birth 23rd June 1974.


Nationality Indian.
Language Known English, Hindi & Bengali.
Marital Status Married.
Present CTC 11.50 Lacs per Annum (Excluding HRA)
Expected CTC Negotiable.
Notice Period 1.5 Months.