Job Safety Analysis: Abqaiq Plants Operation
Job Safety Analysis: Abqaiq Plants Operation
Job Safety Analysis: Abqaiq Plants Operation
6600030489
COGENERATION INTERCONNECTION FACILITIES
BI-01252 ABQAIQ GAS PLANT
1
CONTRACT NO. 6600030489
COGENERATION INTERCONNECTION FACILITIES
BI-01252 ABQAIQ GAS PLANT
2
CONTRACT NO. 6600030489
COGENERATION INTERCONNECTION FACILITIES
BI-01252 ABQAIQ GAS PLANT
SEQUENCE OF BASIC JOB STEPS POTENTIAL HAZARDS REQ HAZARD CONTROLS/SAFE WORK
PROCEDURES
Falling from height/Injury to Personnel Obtain work permit per G.I. 2.100
3.Scaffolding Erection All scaffold crews for erection shall wear full body
harness and 100% tie off. * Scaffolding shall be
erected, inspected and tagged as per the requirements
of G.I. 8.001
3
CONTRACT NO. 6600030489
COGENERATION INTERCONNECTION FACILITIES
BI-01252 ABQAIQ GAS PLANT
4. Ultrasonic Testing Wrong interpretation Provide qualified technician for ultrasonic testing.
5) Hot Tapping Activities Obtain work permit, all work shall be in strict compliance with G.I.
2.100.
Ensure that all relevant personnel are aware of the hot top activities.
Ensure that the proper safety and firefighting equipment’s are on site
and in working condition.
Provide barricades and warning signs around the work area.
Hot tap technician shall be certified by the hot tap equipment
manufacturer.
Maintain good housekeeping of jobsite.
4
CONTRACT NO. 6600030489
COGENERATION INTERCONNECTION FACILITIES
BI-01252 ABQAIQ GAS PLANT
Crane Lifts and Rigging G.I. 7.028 requirements shall be fully implemented
Rigging hardware shall be inspected prior to lifting.
Crane lift areas shall be barricaded and warning signs posted.
Provide taglines on all loads to be lifted/no lifts if wind exceeds 32
KPH.
Maintain good housekeeping of the work area.