Unit 42 - Highway Engineering Assignment 1 (Set C)

Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 9
At a glance
Powered by AI
The key takeaways are that the document discusses the requirements and evaluation criteria for a highway engineering assignment, including identifying and planning a new highway route, designing earthworks, bridges and tunnels, and assessing related construction methods.

The submission requirements include submitting a formal report of 3000-5000 words with a title page, table of contents, introduction, case study sections, and references. Diagrams must be included and sources cited properly using the Harvard referencing system.

The grading criteria cover two learning outcomes - evaluating how a new highway is identified and designed, and assessing earthworks, bridge and tunneling methods. The criteria include analyzing, reviewing, evaluating, preparing outlines and discussing at pass, merit and distinction levels.

CHINDWIN TU INTERNATIONAL COLLEGE

Assignment Front Sheet

Unit Code/ Unit number and


Qualification
title
Pearson BTEC Level 5 Higher National Diploma in K/615/1427
Construction and The Built Environment Unit 42: Highway
(Civil Engineering) Engineering
Student name / BTEC Registration Number Assessor name

Dr. Win Cherry

Date issued Hand in deadline Submitted on

IV Name IV Date

Assignment title A 1 of 2 Evaluation of a new highway infrastructure


In this assessment you will have opportunities to provide evidence against stated in
the page 2. Indicate the page numbers where the evidence can be found.

Submission Format:

Students will submit two assignments in the form of report for a new highway project. The
submission format of the report should be written in the form of formal academic writing styles
and should include:
- Title page
- Table of contents
- Introduction
- Case study parts and
- References
In report writing, the information should be clearly presented. All documents should contain
diagrams to illustrate the content and the related citation should be included. The
recommended word limitation is 3000 words from introduction to referencing parts but 15% up
or down is acceptable.

Student declaration

I certify that the work submitted for this assignment is my own. I have clearly referenced
any sources used in the work. I understand that false declaration is a form of malpractice.

Student signature: Date:

Unit 42 HE A1 July 2020 CDC 1


Learning Outcomes and Assessment Criteria

Learning Outcome Pass Merit Distinction

LO1 Evaluate how a P1 Analyse how the M1 Review a


new highway route is route of a new section schematic design,
identified, planned of highway is identified considering the
and designed and planned; application of current
highlighting the practice.
required legal
procedures.

D1 Critically analyses
P2 Evaluate all the
design details for the
LO2 Assess the anticipated earthwork
earthwork
methods of operations for a major
M2 Discuss the operations,
earthwork new highway within a
interrelationship bridges and
operations, bridges developed sector of a
between the tunnelling
and tunnelling which community, including
earthwork of a new highway.
are used in difficult terrain.
connection operations,
with the provision of bridges and the
highways P3 Prepare an outline tunnelling of a new
design and method highway.
statement for the
forming of a tunnel
section on the proposed
new highway.

Unit 42 HE A1 July 2020 CDC 2


Assignment Brief

Pearson BTEC Level 5 Higher National Diploma in


Qualification
Construction and The Built Environment (Civil Engineering)

Unit number and title Unit 42 Highway Engineering


Assessor name Dr. Win Cherry
Date issued
Hand in deadline

Assignment title A 1 of 2 Evaluation of a new highway infrastructure

Scenario
A highway is the main public road that connects different cities, towns and villages
together. It is a major and significant public road that is able and fit to carry fairly
heavy traffic. With the help of good transportation systems, not only public were able
to communicate safety and comfortably without having to spend much of their
precious time on travelling but also it can lead to a better flow of goods which plays
the main role for the development of economic and the environment where we all live.
Obviously, it is vital to have good quality highway system especially for developing
countries to transform into the sophisticated society. Myanmar is the developing
country and for those reasons, the government enforced the Ministry of Construction
to construct the new Mandalay-Naypyidaw highway road which will create more
proactive in developing innovative highway solutions. You are a road construction
engineer of Ministry of Construction and your project teams have to construct a new
route for a highway in order to produce more creative and resourceful solutions for
the future. Therefore, your project team is responsible to analyze to prepare the
project report. Your report should be two parts.

Part 1: Planing and designing of a new highway

According to scenario, for developing a new highway route, firstly you have to analyse
how the route of a new section of highway is identified and planned by highlighting
the required legal procedures. In this you have been follow the instructions below:
- Selection of highway alignment
- Land acquisition processes
- Environmental impact assessment

For geometric design purpose, you have to analyze daily traffic data for determining
the current traffic on a section of highway project. Therefore, solve the following
problem:

Unit 42 HE A1 July 2020 CDC 3


(a) Traffic data was counted at Mandalay- Ta Da Oo highway section as shown below.
You have to determine daily traffic volume (PCU/day) for this region. To achieve
daily traffic volume (PCU/day) for study area, you can used the value of hourly
expansion factor (HEF) = 17.11. The related general information are as follow:

- Location : Mandalay- Ta Da Oo highway section


- Date : 1.3.2020
- Time : 8:15 am – 8:30 am
- Duration : 15 minute (short count)
- Weather : It was initially a sunny day but afterwards it became cloudy
Time Vehicle Types
Cars Motorcycle 3 Wheeler Bus Express NMT Total
8:15– 8:30
225 45 85 8 12 49 424

- Method : Manual Method

* PCU = Passenger Car Unit

Secondly you have to review a schematic design by means of calculations, including


workings, to show their achievement of a solution to the following cases:

(b) Sketch the longitudinal profile, cross-section and show the stationing of the key
points along the road-way for the following conditions.

- Degree of curvature, D = 8˚
- Design speed = 40mph
- Width of pavement = 36 ft
- Amount of normal crown = 3 in
1
- Allowable maximum rate of superelevation =
15
- Maximum superelevation runoff = 1:200
- Normal crown ends at station = 20+00
Assume that the side friction is neglected and superelevation is obtained by
revolving the road surface about the center line or crown.

Part 2: Assess the methods of earthwork operations, bridges and tunnelling

In highway engineering, assessment methods take place an important role. Therefore


in your report, you have to evaluate all the anticipated earthwork operations for a

Unit 42 HE A1 July 2020 CDC 4


major new highway including difficult terrain and solve the following problem:

(a) A cutting is to be made through ground where the cross-slope varies


considerably. At station A, a depth of cut was 3.6 m at the centreline and the cross
slope was 8 to 1. At station B, the corresponding figures were 3m and the cross
slope was 12 to 1 and at station C, a depth of cut was 4.2 m at the centreline and
the cross slope was 10 to 1. The distance between AB and BC are each 30 m
respectively. The formation width is 10 m and the side slope is 1.5 to 1. Calculate
the volume of cutting between station A and C.

During working the earthwork operations for a major new highway in difficult terrain,
you met with the different grading conditions to obtain smoothing alignment.
Therefore, you need to draw the types of summit curves and valley curves for various
condition of grade. And then, the following criteria are needed to be considered in
your earthwork operation process:

- Geotechnical investigation
- Soil stabilisation techniques
- Formation of embankments and cause of failures

And then, you have to need forming of a tunnel section on the proposed new highway.
Therefore, you should prepare an outlines of design and method statements for the
forming of a tunnel section. It should include:

- Alignment of tunnel section


- Types of tunnel and construction techniques
- Tunnel boring machine
- Maintenance techniques

For planning of a new highway, the constructions of highway bridges are also
important. Therefore, you need to discuss:

- Typical types of highway bridges used


- Construction of abutments

Unit 42 HE A1 July 2020 CDC 5


- Active and passive control systems
After that, to fulfill the requirements of the planning, you have to discuss the
interrelationship between the earthwork operations, bridges and the tunnelling of a
new highway.

In the final stage, you have to analyses design details for the earthwork operations,
bridges and tunnelling of a new highway.

All documents should contain diagrams to illustrate the content.

Sources of information

O’FLAHERTY, C. (2002) Highways: The location, design, construction & maintenance of pavements.
4th Ed. Oxford: Butterworth-Heinemann.

ROGERS, M. (2008) Highway Engineering. 2nd Ed. Oxford: Blackwell publishing.

WATSON, J. (1994) Highway Construction & Maintenance. 2nd Ed. Harlow: Longman

Evidence
Summary of evidence required by student Evidence presented
checklist

You are required to write a report for the


1
upcoming discussion to cover the above tasks.

Unit 42 HE A1 July 2020 CDC 6


PRESENTATION

1. The assignment should have a cover page that includes the assignment title,
assignment number, course title, module title, Lecturer/tutor name and
student’s name. Attach all the pages of assignment brief/achievement summary
with your report and leave them blank for official use.
2. Ensure that authenticity declaration has been signed.
3. This is an individual assignment.
4. Content sheet with a list of all headings and page numbers.
5. A fully typed up professionally presented report document. Use 12 point Arial or
Times New Roman script.
6. Your assignment should be word-processed and should not exceed from 3,000–
5,000 words in length.
7. Use the Harvard referencing system.
8. Exhibits/appendices are outside this limit.
9. The assignment should contain a list of any references used in the report.

NOTES TO STUDENTS FOR SUMMISSION

 Check carefully the submission date and the instructions given with the
assignment. Late assignments may not be accepted.
 Ensure that you give yourself enough time to complete the assignment by the
due date.
 Do not leave things such as printing to the last minute – excuses of this nature
will not be accepted for failure to hand-in the work on time.
 You must take responsibility for managing your own time effectively.
 If you are unable to hand in your assignment on time and have valid reasons
such as illness, you may apply (in writing) for an extension.
 Failure to achieve a PASS grade will results in a REFERRAL grade being given.
 Take great care that if you use other people’s work or ideas in your assignment,
you properly reference them in your text and any bibliography.
 NOTE: If you are caught plagiarising, the College policies and
procedures will apply.

Unit 42 HE A1 July 2020 CDC 7


Achievement Summary

Pearson BTEC Level 5 Higher


National Diploma in Construction Assessor
Qualification Dr. Win Cherry
and The Built Environment (Civil name
Engineering)

Unit Number Unit 42 Highway Student


and title Engineering name

Achieved?
(tick)
Grading Criteria
First
Rewor
attemp IV
k
t

LO1

Analyse how the route of a new section


P1 of highway is identified and planned;
highlighting the required legal
procedures.

M1 Review a schematic design, considering


the application of current practice.

Critically analyses design details for the


D1 earthwork operations, bridges and
tunnelling of a new highway.

LO2

Evaluate all the anticipated earthwork


P2 operations for a major new highway
within a developed sector of a
community, including difficult terrain.

Prepare an outline design and method


P3 statement for the forming of a tunnel
section on the proposed new highway.

Discuss the interrelationship between the


M2 earthwork operations, bridges and the
tunnelling of a new highway.

Critically analyses design details for the


D1 earthwork operations, bridges and
tunnelling of a new highway.

Unit 42 HE A1 July 2020 CDC 8


Higher National Diploma - Summative Assignment Feedback Form

Student Name/ID

Unit Title
Assignment Number Assessor Dr. Win Cherry

Submission Date Date Received


1st submission

Re-submission Date Date Received Re-


submission

Assessor Feedback:

Signature: Date:

Resubmission Feedback:

Signature: Date:

Internal Verifier’s Comments:

Signature / Date:

Unit 42 HE A1 July 2020 CDC 9