Computer Equipment Maintenance Schedule
Computer Equipment Maintenance Schedule
Computer Equipment Maintenance Schedule
EQUIPMENT TYPE
EQUIPMENT CODE
LOCATION PRACTICAL WORK AREA/WAF
Schedule for the Month of March
MANPOWER Daily Every Weekly Every Monthly Remarks
ACTIVITIES
Other 15th
Day Day
1. Check panel board, and Electrician Activity is
circuit breakers’ electrical Trainer X done before
connections, cables and and after
outlets using the
Clean and kept dry equipment
Parts are well-
secured/attached
Properly labeled
2. Check Mig gun (nozzle, Trainees Activity is
contact tip, diffuser) and Trainer X done before
ground cable: using the
Clean and kept dry equipment
Parts are well-
secured/ attached
Inspect for damages
and replace parts if
necessary
3. Check adjustment lever’s Trainees Activity is
if functional Trainer X done before
(amperages/speed); if using the
not, calibrate equipment
4. Check Gas cylinder outfit Trainees Activity is
for any abnormality Trainer X done before
Gate valve using the
Co2 regulator equipment
Gas hose Fittings
Fittings