011 Chapter 9
011 Chapter 9
011 Chapter 9
• Regulators
• Unitized Substation”
9.1.3 Reactors
• Air core reactor
• Gapped core reactor
9.1.4 EPC Contract
• Substation design, erection and commissioning
DESIGN
SPECIFICATIONS
%η 99.44 99.44
GLV⁰C 12.14 11.2
GHV⁰C 16.5 17.2
Deflection (mm) 7.32 8.03
Cost (INR-Lacs) 44.80 42.76
Winding
Core
Connection
Testing
9.3 Conclusion