Nothing Special   »   [go: up one dir, main page]

04 Preperation of Specimen

Download as xls, pdf, or txt
Download as xls, pdf, or txt
You are on page 1of 1

NATIONAL HIGHWAYS AUTHORITY OF INDIA

4-Laning and Strengthening of Existing 2-Lane Road from Km 265.000 to 380.000


Dhule to Pimpalgaon Section of NH-3 in the State of Maharastra

Contractor : Soma Enterprise Limited Concessonaire : IRCON - SOMA Tollway Pvt. Ltd.
Sub. Contractor : MCCL / SAAVY / VNC Testing Laboratory : Malegaon

Doc. No. : Soma QCF BC 04


PREPERATION OF SPECIMENS
Rev. No. : 01

MORT&H TABLE 500-18 Date of Rev. : 09.10.2005


(GRADING 1)
Page No. : 1 of 1

Package No : Date :

Trial No : Activity :
IS Sieve
% Passing % Retained Corrected % Weight in grams
mm
26.50 0.00 0.00 0.00 0.00
19.00 0.00 0.00 0.00 0.00

13.20 0.00 0.00 0.00 0.00

9.50 0.00 0.00 0.00 0.00

4.75 0.00 0.00 0.00 0.00

2.36 0.00 0.00 0.00 0.00

1.18 0.00 0.00 0.00 0.00

0.600 0.00 0.00 0.00 0.00

0.300 0.00 0.00 0.00 0.00


0.150 0.00 0.00 0.00 0.00

0.075 0.00 0.00 0.00 0.00

Pan - 0.00 0.00 0.00


Bitumen
0.00 0.00 0.00
Content
0.00 0.00 0.00
Remarks:

Tested by Checked by

Sub Contractor IRCON / SOMA SPV Representative

Random sample checked by


IC Representative

You might also like