4 A+Green+Spider+project
4 A+Green+Spider+project
4 A+Green+Spider+project
9th
9 October2019
th October 2019 #Hydrogen4Climate
#Hydrogen4Climate 1
Green Spider IPCEI
Refineries
LOHC
Chemicals
Steel
LNG
> 60 HDV
… > 35 LV
> 65 CHP
> 1 Train
> Underground
LOHC
LOHC
* Long term vision: Renewable energy surplus & curtailments up to 76 TWh that could be managed through Green Hydrogen
production
5
2
Development of a green
hydrogen network to
4
connect Europe 3
Enagás
LNG terminal
1
1
Storage
Baleares Hub
Compressor station
Infrastructures of other
5 Asturias Hub
Baleares Hub:
Power to green Hydrogen Mallorca
Production of green hydrogen, through a photovoltaic plant, for its use as transportation fuel in a fleet of buses and also
for its injection into the gas grid.
H2O
10 MW
O2
…
Partners
> 650 M€
> 150 MW
H2O
H2
…
O2
> 200 MW
> 620 M€
LOHC
> 100 MW
H2O
H2
…
O2
> 250 MW
Aragón Hub:
Local uses & Singular facilities
> 320 M€
H2O
H2 …
O2
European and local Partners to be
defined for each application
Asturias Hub:
Steel, Port, Link to Europe
> 400 M€
> 100 MW
LOHC
H2O
H2 …
H2 H2
LOHC
=
Liquid Organic Hydrogen Carrier
Hydrogenation Dehydrogenation
Network
LOHC LOHC
LOHC
e.g.
General
Purpose Tanker
~ 75 tpd ~ 75 tpd
Asturias Import & distribution
Hub via Vopak
Terminal Rotterdam
150 M€