Design:
LOAD ESTIMATION ON CORBEL
DL + LL on Bearing 207.916
DL + LL on Conveyor 41.58
Load Summary
LOAD DESCRIPTION VL ( T ) M L ( T m ) HL ( T )
Dead Load 374.24 0 0
2
where; fsy = Yield stress of reinf. 500 N/mm
m= 1.0 Assumed
m= 1.4 Concrete placed monolithically across interface
1.0 Concrete placed against hardened concrete but with roughened surface
0.7 Concrete anchored to structural steel
0.6 Concrete placed against hardened concrete but with surface not roughened
2
Avf = Vu = 124.748 x10000/0.85( 500 x 1.0 )= 2935.247 mm
0.85x fsy x m
2
At = 4.990 x 10000 / ( 0.85 x 500.0 )= 117.4099 mm
2
Af = 150.96 mm
2
As not less than ( Af + At ) 268.37 mm /m
2
not less than 2/3 Avf + At 2074.24 mm /m
2
not less than (0.04 f'c/ fsy) bd' 4200.00 mm /m
2
where f'c = 30 N/mm
2
fsy = 500 N/mm
b= 1000 mm assuming for 1m
d' = 1750 mm
2
Required As = 4200.00 mm /m
Corbel
Providing HYSD Bars of 32 mm f Nos. per M = 5.222 Nos or say 191.5 mm c/c
Hence Provide HYSD 32 mm f at 150 mm c/c
2
Ah not less than 0.5 Af 75.48 mm /m
2
not less than 0.333 Avf 977.44 mm /m
2
Hence, Provide Ah = 977.44 mm /m
These stirrups shall be provided below As and within 2/3rd d' below As
2
Assuming provision of 5 layers Hence, Required Ah = 195.49 mm /m/ layer
Provide 16 mm f 4 L /m
2
Hence, Provide Ah = 804.25 mm /m/ layer
2
where; fsy = 500 N/mm
Vu = 124.748 T/m
Vc = 10bd in Kg, where, b and d are in cm
b= 1000 mm Assume for 1m
Effective d= 1750 mm
So Vc = 175 T/m
Pitch p= 200 mm Assumed
2
*Av = -57.43086 mm