Blue Prism Tutorial For Beginners
Blue Prism Tutorial For Beginners
Blue Prism Tutorial For Beginners
Blue Prism software enables business operations to be agile and cost effective by
automating, manual, rule-based, repetitive back-office processes and improving
accuracy by developing a "Digital Workforce.". The Blue prism tool offers flow chart
like designer with drag and drop feature to automate each step of the business
processes.
1. Process Studio
2. Object Studio
We will see that Object Studio looks very like Process Studio. There are key
differences, which are:
Object Studio offers some "stage" which are not available in the Process Studio
Object Studio does not have a Main Page, but it does have two default pages
Pages are organized as a flat group instead of hierarchy like in the Process
Studio
A process acts like a human user. It implements a software robot's logic. It is almost
similar to personal interaction with several applications to carry out a series of steps
which can invoke actions to carry out same steps.
Process diagram:
The new process will appear beneath the Processes heading. Now double-click
it to open it.
Along the left-hand side of the screen is the Stages toolbar. To put a stage on
the page, click and drag it into position. Try this by dragging a few different
stages onto the page.
You will notice that one of the stages in the stage’s toolbar has a blue rectangle
highlighting it. Whichever stage is highlighted will be the one added if you
click directly on the page. Click on the calculation stage on the toolbar to
highlight it.
Figure: Process Studio Stages Toolbar
Here, you can notice how the cursor changes and has the calculation stage icon next to
it. Now click on the process page to add a calculation stage. This saves you having to
return to the toolbar if you have several stages of the same type to add.
Even with the calculation stage cursor you can still drag and place other stage types.
Space in Process Studio is effectively infinite, and pan and zoom tools can be used to
maneuver around the diagram. The grid lines and "snap" settings are on by default,
but these can be switched off (via the View menu) if necessary.
Allows them to perform the Inter-bank transfer in just 20 sec using Blue Prism
vs. 10 min manual process
130 processes automated
100 robots deployed
200 + FTE saved audit conducted in 1 min with automation versus entire
working day process of almost 8 hours.
The Telco launched RPA software in 2013. They wanted to optimize their back-office
operations.
Summary