Owners Engineer Services For Jawa 1 (1,760 MW) Combined Cycle Gas Turbine Power Project

Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 4
At a glance
Powered by AI
The documents provide timesheets and progress reports for engineering design work on a gas pipeline project.

It describes engineering design work for the Jawa 1 Combined Cycle Gas Turbine Power Project located in Cilamaya, including pipeline routing and layout, cathodic protection design, stability analysis, and 3D modeling.

Muhammad Yulius Azman has worked on tasks like pipeline route selection, overall field layout, onshore pipeline layout, offshore pipeline alignment, cathodic protection design, pipeline stability analysis, and 3D modeling between November 2018 to February 2019.

Owners Engineer Services for Jawa 1 (1,760 MW)

Combined Cycle Gas Turbine Power Project

LOCATION : Project Site - Cilamaya_ Project Engineering Design


TIME SHEET
Personal Name : Muhammad Yulius Azman, ST
Position : Subsea Pipeline Expert Month: November 2018.
Working Days
Date Description Description Man Hour Remarks
KRW Others Days

11/2/2018 ˅ Fri PP-GSF-PIP-SPE-001-revA Pipeline Design Basis 4.0

Total Invoice Man Hour : 4.0 Proposed by,


Total Invoice Man Days : 0.5 PT KWARSA HEXAGON

(Yoyok Sukari)
President Director

Personnel
Signed

Muhammad Yulius Azman, ST


Subsea Pipeline Expert
Owners Engineer Services for Jawa 1 (1,760 MW)
Combined Cycle Gas Turbine Power Project

LOCATION : Project Site - Cilamaya_ Project Engineering Design


TIME SHEET
Personal Name : Muhammad Yulius Azman, ST
Position : Subsea Pipeline Expert Month: December 2018.
Working Days
Date Description Description Man Hour Remarks
KRW Others Days

12/10/2018 ˅ Mon -P199285.56.0000.05-18090 MM-00093 Data Sheet for Bend 2.0


For Gas Infrastructure and Marine Works

12/10/2018 ˅ Mon -P199285.56.0000.05-18094 MM-00094 Corrosion Coating and Sacrificial Anode Specification 3.0
For Gas Infrastructure and Marine Works

12/10/2018 ˅ Mon -P199285.56.0000.05-18092 MM-00094 Pipeline Specification 3.0


For Gas Infrastructure and Marine Works

12/11/2018 ˅ Tue -P199285.56.0000.05-18089 MM-00093 Data Sheet for Line Pipe 3.0
For Gas Infrastructure and Marine Works

Concrete Coating Specification


12/11/2018 ˅ Tue -P199285.56.0000.05-18093 MM-00094 For Gas Infrastructure and Marine Works 2.0

12/11/2018 ˅ Tue -P199285.56.0000.05-18091 MM-00093 DATA SHEET FOR ANODE 3.0


For Gas Infrastructure and Marine Works

Total Invoice Man Hour : 16.0 Proposed by,


Total Invoice Man Days : 2.0 PT KWARSA HEXAGON

(Yoyok Sukari)
President Director

Personnel
Signed

Muhammad Yulius Azman, ST


Subsea Pipeline Expert
Owners Engineer Services for Jawa 1 (1,760 MW)
Combined Cycle Gas Turbine Power Project

LOCATION : Project Site - Cilamaya_ Project Engineering Design


TIME SHEET
Personal Name : Muhammad Yulius Azman, ST
Position : Subsea Pipeline Expert Month: January 2019.
Working Days
Date Description Description Man Hour Remarks
KRW Others Days

1/8/2019 ˅ Tue P199285.55.0000.05-18031 MC-00035 Pipeline Route Selection 4.0

1/8/2019 ˅ Tue P199285.55.0000.05-18032 MC-00035 Overall Field Layout 2.0

1/8/2019 ˅ Tue P199285.55.0000.05-18033 MC-00035 Onshore Gas Pipeline Layout 2.0

1/22/2019 ˅ Tue - P199285.56.0000.05-18203 MM-00144 Offshore pipeline alignment sheet 4.0

1/22/2019 ˅ Tue - P199285.55.0000.05-18038 MC-00040 Cathodic Protection Design 4.0

1/22/2019 ˅ Tue - P199285.55.0000.05-18037 MC-00040 Pipeline Stability and Free Span Analysis 4.0

1/30/2019 ˅ Wed IPP-GSF-PIP-LAY-003 Seawater Intake Pipeline Layout_revA 3.0

1/30/2019 ˅ Wed IPP-GSF-PIP-DET-004 Pipeline Crossing Detail Drawing_revA 4.0

1/30/2019 ˅ Wed IPP-GSF-PIP-CAL-006 Pipeline Crossing Analysis_revA 4.0

Total Invoice Man Hour : 31.0 Proposed by,


Total Invoice Man Days : 3.9 PT KWARSA HEXAGON

(Yoyok Sukari)
President Director

Personnel
Signed

Muhammad Yulius Azman, ST


Subsea Pipeline Expert
Owners Engineer Services for Jawa 1 (1,760 MW)
Combined Cycle Gas Turbine Power Project

LOCATION : Project Site - Cilamaya_ Project Engineering Design


TIME SHEET
Personal Name : Muhammad Yulius Azman, ST
Position : Subsea Pipeline Expert Month: February 2019.
Working Days
Date Description Description Man Hour Remarks
KRW Others Days

2/6/2019 ˅ Wed P199285.55.0000.05-18058 MC-00051 Riser and Tie-In Spool Analysis 4.0

2/6/2019 ˅ Wed P199285.55.0000.05-18059 MC-00052 Pipeline Approach to Offloading Platform 4.0

2/7/2019 ˅ Thu P199285.55.0000.05-18060 MC-00052 Riser General Arrangement 4.0

2/7/2019 ˅ Thu P199285.56.0000.05-18233 MM-00154 Pipeline Expansion Analysis 4.0

2/7/2019 ˅ Thu P199285.56.0000.05-18237 MM-00157 Discharge Pipeline Layout 3.0

Design Review Meeting : 30% 3D Model review at Meindo office,


2/15/2019 ˅ Fri 3D Model TCC Batavia 8.0

Total Invoice Man Hour : 27.0 Proposed by,


Total Invoice Man Days : 3.4 PT KWARSA HEXAGON

(Yoyok Sukari)
President Director

Personnel
Signed

Muhammad Yulius Azman, ST


Subsea Pipeline Expert