MGB-ITP-003-ST-003
THE CONTRACTOR: NEW GOLDEN CITY BUILDERS AND DEVELOPMENT CORPORATION
SUBJECT: INSPECTION AND TEST PLAN FOR INSTALLATION OF FORMWORKS
1.5 Material Submittals SRF Approved H,R R H,R H,R Prior to installation Approved by Design Consultant Prepared by NGCB
2.0 Construction
2.1 Material Receiving Inspection SRF Approved H,R H,R H,R H,R Prior to Installation Incoming Material Checklist Prepared by NGCB
2.2 Fabrication of formworks MS, SD & FCD Approved H H W, R R Prior to Installation Incoming Material Checklist Prepared by NGCB
2.3 Fabrication of Reinforcements bars MS, SD & FCD Approved H H W, R R Prior to Installation Incoming Material Checklist Prepared by NGCB
2.4 Installation Check Including Roughing-ins MS, SD & FCD Approved H H H,S H,S After Installation Installation Checklist Prepared by NGCB
2.5 Inspection MS 009, 011, 012 & 014 Approved H H H,S H,R After Installation SRF Prepared by NGCB
2.6 Curing & Stripping GENERAL NOTES Approved H H,R H,S H,R After Pouring Testing of Concrete Samples Prepared by NGCB
_______________________
CQC Engineer QA/QC Head Project Manager
GenCon/Nominated Subcontractor General Contractor Empire East Land Holdings Inc.