Risk Assessment For Chilled Water Cladding
Risk Assessment For Chilled Water Cladding
Risk Assessment For Chilled Water Cladding
Hazards 1.Identify track for movement 1. Lay PVC floor protection sheet for movement of workforce if required
Movement of Workers & Workers/Assistant
9 1.Slip and Falls 2. Follow logistic plan as agreed with Emaar representative. 4 3 12 M 2. Cleaning and make surface dry by using wipers and vacuum cleaners 4 1 4L RASHID
Logistics Technicians
2.Access control Page 1 of 2 3. Above and below ground services must be located prior to work commencing
PROJECT: Title: PR 10057115 - REFURBISHMENT OF CHILLED WATER LINES
INSULATION AND CLADDING IN ALL EXTERNAL AREA IN DUBAI MARINA MALL.
RISK ASSESSMENT CONDUCTED BY: HAMID DATE CONDUCTED: 10.06.2019